Site Engineer Interview Questions & Answers

user image Anonymous

posted on 27 Sep 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How many single phase light Watt
  • Ans. 

    The wattage of single phase lights varies depending on the type and size of the light.

    • The wattage of single phase lights can range from 5 watts for LED lights to 100 watts for incandescent lights.

    • It is important to consider the power consumption and brightness needed when selecting single phase lights.

    • Consult the manufacturer's specifications for the exact wattage of a specific single phase light.

  • Answered by AI
  • Q2. How Street light connection
  • Ans. 

    Street light connections involve wiring the lights to a power source for illumination.

    • Street lights are typically connected to an electrical grid for power supply.

    • The connection involves wiring the lights to a power source using appropriate cables and connectors.

    • Proper grounding and insulation are essential to ensure safety and prevent electrical hazards.

    • Regular maintenance and inspection of the connections are necessa...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. What is production?
  • Ans. 

    Production refers to the process of creating goods or services using resources and labor.

    • Production involves transforming raw materials into finished products or providing services to customers.

    • It includes activities such as manufacturing, assembly, packaging, and distribution.

    • Examples of production include car manufacturing, food processing, and software development.

    • Efficient production is essential for businesses to

  • Answered by AI

I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. About salary breakups about current CTC:- Expected CTC:-

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview starts with full confidence not in over confidence. Keep your mind cool at time of interweaving
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Aptitude Test 

Aptitude test is for problem solving

Round 3 - Group Discussion 

Group discussion plays a majore role how employees connects to others and communicate with his colleagues and how dare he/she is..

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Site Engineer interview:
  • Technical Skills
Interview preparation tips for other job seekers - Don't judge graduates by their resume because some of us from non technical background many of us don't know how to create resume based on interview please select who are tallented
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. Different types of mix design ?
  • Ans. 

    Different types of mix design include nominal mix, standard mix, and design mix.

    • Nominal mix design involves using standard ratios without testing.

    • Standard mix design follows specific guidelines and proportions.

    • Design mix design is customized based on specific project requirements.

    • Examples: M20, M30, M40 mixes.

  • Answered by AI
  • Q2. Overlaping steel?
  • Ans. 

    Overlapping steel refers to the practice of placing steel bars on top of each other to increase strength and stability in construction.

    • Overlapping steel bars helps distribute loads evenly and prevent structural failure.

    • Properly overlapping steel bars is crucial for ensuring the structural integrity of a building.

    • Commonly used in reinforced concrete structures such as beams, columns, and slabs.

    • Overlap length and spacing...

  • Answered by AI
  • Q3. Soil Compaction test
  • Ans. Load bearing capacity of soli for any structural work test its density
  • Answered Anonymously
  • Q4. Ratio of mortar for plaster work
  • Ans. 

    The ratio of mortar for plaster work is typically 1:3 to 1:6, depending on the type of surface and desired finish.

    • The most common ratio for plaster work is 1 part cement to 3 parts sand.

    • For a smoother finish, the ratio can be adjusted to 1 part cement to 4 or 5 parts sand.

    • In some cases, a 1:6 ratio (1 part cement to 6 parts sand) may be used for rough surfaces or base coats.

    • Water should be added gradually to achieve th

  • Answered by AI
  • Q5. Quantity of brick in 50 squre meter
  • Ans. 

    The quantity of bricks in 50 square meters depends on the size of the bricks and the thickness of the wall being built.

    • Calculate the area of the wall in square meters

    • Determine the size of the bricks being used (e.g. standard size is 0.22m x 0.1m x 0.07m)

    • Calculate the number of bricks needed by dividing the wall area by the area of one brick

  • Answered by AI
  • Q6. Bar bending schedule

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Site Engineer interview:
  • Theory of sturucture
  • Construction Management
Interview preparation tips for other job seekers - Take Experience with full knowledge of own work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. The panel asked me about my previous company & projects ,few technical Questions. Be confident & on point.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & to the point
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. What is curing,why it is done
  • Ans. 

    Curing is the process of maintaining moisture and temperature conditions in concrete for a specific period to ensure proper hydration and strength development.

    • Curing helps in preventing moisture loss from the concrete, which is essential for proper hydration.

    • It helps in maintaining the desired temperature for the chemical reactions to occur.

    • Curing enhances the strength, durability, and overall performance of the concre...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Case Study 

What is the Substation ,
Why need cable trench,
How much room in substation

Round 3 - One-on-one 

(4 Questions)

  • Q1. Substation in civil work
  • Ans. 

    Substation in civil work involves the construction of buildings and structures to house electrical equipment for power distribution.

    • Substation civil work includes site preparation, foundation construction, building erection, and equipment installation.

    • Design considerations include safety, accessibility, and structural integrity.

    • Examples of substation civil work include transformer foundations, control buildings, and sw

  • Answered by AI
  • Q2. What is the control room ??
  • Ans. 

    The control room is a centralized location where monitoring, control, and coordination of various systems and processes take place.

    • Centralized location for monitoring and controlling systems

    • Used in industries like power plants, manufacturing plants, and transportation systems

    • Equipped with control panels, computers, communication systems, and monitoring devices

    • Allows operators to make real-time decisions and adjustments

    • ...

  • Answered by AI
  • Q3. What for battery room
  • Ans. 

    Battery rooms are designated areas where batteries are stored, charged, and maintained.

    • Battery rooms are used to store batteries for backup power systems.

    • They are equipped with charging stations and ventilation systems to ensure safety.

    • Regular maintenance and inspections are conducted in battery rooms to ensure optimal performance.

    • Battery rooms are common in industries such as telecommunications, data centers, and manu

  • Answered by AI
  • Q4. Why need cable trench
  • Ans. 

    Cable trenches are needed to protect and organize cables, prevent damage, and allow for easy maintenance and repairs.

    • Protects cables from physical damage and environmental factors

    • Organizes cables for easy identification and maintenance

    • Facilitates easy access for repairs and upgrades

    • Helps in preventing tripping hazards

    • Ensures compliance with safety regulations and standards

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - building, SP, SSP, ATS in Indian railways WDFCC
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Work in constraction site engineer qustion
  • Q2. DPR DLR railway relited

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Contribute & help others!
anonymous
You can choose to be anonymous

Energy Efficiency Services Interview FAQs

How many rounds are there in Energy Efficiency Services Site Engineer interview?
Energy Efficiency Services interview process usually has 1 rounds. The most common rounds in the Energy Efficiency Services interview process are Technical.
What are the top questions asked in Energy Efficiency Services Site Engineer interview?

Some of the top questions asked at the Energy Efficiency Services Site Engineer interview -

  1. How many single phase light W...read more
  2. How Street light connect...read more

Recently Viewed

INTERVIEWS

Emmvee Photovoltaic Power

5.6k top interview questions

INTERVIEWS

Jaiprakash Power Ventures

No Interviews

SALARIES

Jaiprakash Power Ventures

INTERVIEWS

SHV Energy

No Interviews

INTERVIEWS

Energy Efficiency Services

No Interviews

INTERVIEWS

Shri Bajrang Power & Ispat

No Interviews

REVIEWS

Saudi Electricity Company

No Reviews

INTERVIEWS

Essar Power

No Interviews

JOBS

Real Ispat & Power

No Jobs

SALARIES

Shyam Indus Power Solutions

Tell us how to improve this page.

Energy Efficiency Services Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Energy Efficiency Services Site Engineer Salary
based on 12 salaries
₹1.7 L/yr - ₹3 L/yr
31% less than the average Site Engineer Salary in India
View more details

Energy Efficiency Services Site Engineer Reviews and Ratings

based on 3 reviews

5.0/5

Rating in categories

4.5

Skill development

4.2

Work-life balance

4.2

Salary

3.1

Job security

5.0

Company culture

3.3

Promotions

4.2

Work satisfaction

Explore 3 Reviews and Ratings
Senior Engineer
57 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Technical Engineer
37 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
30 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
19 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Energy Efficiency Services with

Tata Power

3.9
Compare

Schneider Electric

4.1
Compare

Siemens

4.1
Compare

Honeywell Automation

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview