Types of pumps and their maintenance procedures
Centrifugal pumps require regular inspection of impeller and bearings
Reciprocating pumps need piston and valve maintenance
Diaphragm pumps should have diaphragm replacements as needed
Gear pumps may require gear and seal replacements
Regularly check for leaks, vibrations, and unusual noises in all pump types
Valves are mechanical devices used to control the flow of fluids in a system. They require regular maintenance to ensure proper functioning.
Types of valves include ball valves, gate valves, globe valves, and butterfly valves.
Maintenance tasks for valves may include lubrication, cleaning, and replacing worn parts.
Regular inspection of valves is important to detect leaks or other issues early on.
Valve maintenance schedul...
I appeared for an interview in Feb 2024.
I applied via Recruitment Consultant and was interviewed in May 2017. There were 5 interview rounds.
I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Job Portal and was interviewed before Sep 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.
25 QUESTIONS.
MODERATE
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
Line balancing is the process of evenly distributing workload among workstations in a production line to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity
It involves assigning tasks to workstations based on their processing times
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Assembly balancing is the process of optimizing the work distribution among different workstations to improve efficiency and productivity.
Assembly balancing involves assigning tasks to different workstations in a way that minimizes idle time and maximizes throughput.
It helps in achieving a smooth flow of work and prevents bottlenecks in the production process.
Factors considered in assembly balancing include task time, ...
Cycle time is the total time it takes to complete a process, while tact time is the time it takes to produce one unit.
Cycle time includes all the time spent on a process, including wait time and processing time.
Tact time is the rate at which a product must be produced to meet customer demand.
For example, if a process takes 10 minutes to complete and the customer demand is 100 units per hour, the tact time would be 0.6 ...
Production is the process of creating goods or services, while quality refers to the standard of those goods or services.
Production involves the manufacturing or creation of goods or services.
Quality refers to the standard or level of excellence of those goods or services.
Production and quality are closely linked as the goal is to produce high-quality products efficiently.
Examples: In a manufacturing plant, production ...
OLE stands for Overall Equipment Effectiveness and OEE stands for Overall Labor Effectiveness.
OLE measures the overall performance of equipment in a manufacturing plant.
OEE measures the overall performance of labor in a manufacturing plant.
Both metrics are used to identify areas for improvement and optimize efficiency.
Example: OLE can help identify equipment downtime and OEE can help identify labor productivity issues.
I applied via Company Website and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
based on 2 interviews
Interview experience
based on 6 reviews
Rating in categories
Safety Officer
18
salaries
| ₹2.4 L/yr - ₹4.3 L/yr |
Assistant Manager
17
salaries
| ₹4.5 L/yr - ₹8.5 L/yr |
Senior Engineer
16
salaries
| ₹3.5 L/yr - ₹5.4 L/yr |
Mechanical Maintenance Engineer
15
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Mechanical Engineer
12
salaries
| ₹3 L/yr - ₹4.8 L/yr |
ReNew
Adani Green Energy
Vestas
Jakson Group