I applied via Recruitment Consultant and was interviewed in Nov 2021. There were 3 interview rounds.
Finishing activities refer to the tasks performed at the end of a construction project to complete and enhance the appearance of the site.
Finishing activities include tasks such as painting, tiling, plastering, and flooring.
These activities are aimed at improving the aesthetics and functionality of the site.
Examples of finishing activities include installing fixtures and fittings, applying final coats of paint, and lan...
Top trending discussions
posted on 15 Aug 2023
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
33/11 kv pss refers to a 33kV/11kV primary substation working.
33/11 kv pss stands for a primary substation with a voltage level of 33kV/11kV.
It is responsible for stepping down the high voltage from the transmission line to a lower voltage suitable for distribution to consumers.
The substation includes equipment such as transformers, circuit breakers, and protection devices.
It plays a crucial role in ensuring reliable p...
I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.
M-25 Grade concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).
M-25 Grade concrete is commonly used in construction projects.
The ratio of M-25 Grade concrete is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone).
The mix proportion of M-25 Grade concrete is designed to achieve a desired strength and durability for the specific application.
F...
The number of bricks required in 1 cubic meter depends on the size of the bricks and the thickness of the mortar joints.
The size of the bricks and the thickness of the mortar joints determine the number of bricks needed.
Standard brick sizes are commonly used in construction.
For example, if the size of the brick is 200mm x 100mm x 75mm and the thickness of the mortar joint is 10mm, the calculation would be as follows:
- ...
based on 2 reviews
Rating in categories
System Engineer
14
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Shift Incharge
13
salaries
| ₹2 L/yr - ₹3.4 L/yr |
System Administrator
12
salaries
| ₹2.3 L/yr - ₹7.2 L/yr |
Assistant Manager
9
salaries
| ₹3.6 L/yr - ₹8.1 L/yr |
Toll Supervisor
7
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
Tata Projects