Upload Button Icon Add office photos

Filter interviews by

Ejadah asset Management group MEP Supervisor Interview Questions and Answers

Updated 11 Apr 2024

Ejadah asset Management group MEP Supervisor Interview Experiences

1 interview found

MEP Supervisor Interview Questions & Answers

user image Pravesh Yadav

posted on 11 Apr 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. All Mep knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Communication skill and confidence should be for every jobs

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Jun 2024.

Round 1 - HR 

(2 Questions)

  • Q1. How to my staying accommodate?
  • Q2. How much my salary?
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2023. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Stock checking salary record maintain

Round 3 - Case Study 

Salary checking from payment labour

Round 4 - Group Discussion 

Work group discussion and company work discuss

Round 5 - One-on-one 

(5 Questions)

  • Q1. One by one question answer and oneby one discussion the answer
  • Q2. Site question site work discussion
  • Q3. My detail and my qualifications
  • Q4. And my hobby and my work experience
  • Q5. My work test my work experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Site work discussion and labour work che king and work very well
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me about yourself
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Actually practically be strong about ur knowledge.
  • Q2. What is done in previous company. ?
  • Q3. How to deal or solve the site situation.
  • Ans. 

    To solve site situations, it is important to assess the problem, communicate effectively with team members, implement a solution, and monitor progress.

    • Assess the situation by identifying the root cause of the problem

    • Communicate effectively with team members to gather input and feedback

    • Implement a solution by creating an action plan and assigning tasks

    • Monitor progress by regularly checking in on the situation and adjust

  • Answered by AI
  • Q4. What is safety and de snagging.
  • Ans. 

    Safety and de-snagging are important aspects of ensuring a safe and efficient work environment on construction sites.

    • Safety involves implementing measures to prevent accidents and injuries on site.

    • De-snagging refers to the process of removing obstacles or hazards that could potentially cause harm to workers.

    • Examples of safety measures include providing proper training, enforcing the use of personal protective equipment...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Company induction and salary structure.

Interview Preparation Tips

Topics to prepare for Lodha Group Senior Site Supervisor interview:
  • RCC and Finishing
Interview preparation tips for other job seekers - What you know about ur knowledge share it clearly to infront of interviewer.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2022. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. How to start the finishing activities after RCC?
  • Ans. 

    After RCC, finishing activities can be started by following a systematic approach to ensure quality and efficiency.

    • Inspect the RCC work to ensure it meets quality standards

    • Prepare the surface for finishing by cleaning and leveling

    • Start with plastering, painting, flooring, and other finishing works in a sequential manner

    • Coordinate with other trades to ensure smooth progress of finishing activities

    • Regularly inspect and m...

  • Answered by AI
  • Q2. What is the sequence of the finishing activities?
  • Ans. 

    The sequence of finishing activities typically involves painting, flooring, installation of fixtures, and final cleaning.

    • Painting walls and ceilings

    • Installing flooring such as tiles or hardwood

    • Fixtures installation like lights, faucets, and cabinets

    • Final cleaning of the area

  • Answered by AI
  • Q3. Describe the method of waterproof treatment?
  • Ans. 

    Waterproof treatment involves applying materials to prevent water penetration into structures.

    • Surface preparation including cleaning and repairing any cracks or holes

    • Application of waterproofing materials such as membranes, coatings, or sealants

    • Ensuring proper curing and drying time for the materials to effectively seal the surface

    • Regular maintenance and inspection to ensure long-lasting waterproofing

    • Examples: using bi...

  • Answered by AI
  • Q4. How many type of waterproof treatment for wet areas?
  • Ans. 

    There are primarily two types of waterproof treatments for wet areas: surface waterproofing and integral waterproofing.

    • Surface waterproofing involves applying a waterproof coating or membrane on the surface of the wet area to prevent water penetration.

    • Integral waterproofing involves adding waterproofing agents directly into the concrete mix to make the structure itself waterproof.

    • Examples of surface waterproofing inclu...

  • Answered by AI
  • Q5. What is the mix proportion ?
  • Ans. 

    Mix proportion refers to the ratio of different materials used in a concrete mix to achieve desired properties.

    • Mix proportion is typically expressed as the ratio of cement, sand, and aggregate in a concrete mix.

    • For example, a common mix proportion for concrete is 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts aggregate.

    • The mix proportion can vary depending on the desired strength, workability, and durabili

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - When you answer the interview questions...be confident & postive.
Share your last company working strategy & your involvement.

HSE Supervisor Interview Questions & Answers

Rohan Builders user image RAMA KRISHNAN MUTHUVEL

posted on 13 Oct 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basics questions in hse
Round 3 - HR 

(1 Question)

  • Q1. Salary,basic qualification

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to focus on basic safety terms ,acts and standards

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What is your salary expetions
  • Q3. Are you comfortable for up and down travelling
Round 2 - Technical 

(10 Questions)

  • Q1. Somthing tell about yourself
  • Q2. Terrace all pipes installations details
  • Q3. Lobby all pipes installations details
  • Q4. Toilets all pipes installations details
  • Q5. Kitchen area all pipes installations details
  • Q6. Types of water supply pipes name with make name
  • Ans. 

    There are several types of water supply pipes available in the market. Some of the popular ones are copper, PVC, PEX, and galvanized steel.

    • Copper pipes are durable and resistant to corrosion. They are commonly used in residential and commercial buildings.

    • PVC pipes are lightweight and easy to install. They are commonly used in irrigation systems and swimming pools.

    • PEX pipes are flexible and easy to install. They are com...

  • Answered by AI
  • Q7. Typed of drainage pipes name with make name
  • Ans. 

    There are various types of drainage pipes available in the market with different make names.

    • PVC pipes - made by companies like Astral, Finolex, and Supreme

    • HDPE pipes - made by companies like Jain Irrigation, Kisan, and Prince

    • Cast iron pipes - made by companies like Tata, Jindal, and Electrosteel

    • Concrete pipes - made by companies like Hume, RCP, and Hanson

    • Corrugated pipes - made by companies like ADS, NDS, and Timewell

  • Answered by AI
  • Q8. Types of sprinklers name with temperature and color code
  • Ans. 

    Sprinklers are classified based on temperature and color code. Each type is designed for specific fire hazards.

    • Blue: 57°C (135°F) - Ordinary Combustibles

    • Orange: 68°C (155°F) - Flammable Liquids

    • Red: 79°C (175°F) - Electrical Equipment

    • Green: 93°C (200°F) - Storage

    • Yellow: 141°C (286°F) - Extra High Temperature

    • Purple: 182°C (360°F) - Extreme High Temperature

  • Answered by AI
  • Q9. How to system testing and commitioning
  • Ans. 

    System testing and commissioning involves verifying and validating the functionality of a system before it is put into operation.

    • Develop a test plan that outlines the testing process and criteria

    • Execute the test plan to ensure that the system meets the requirements

    • Document any issues or defects found during testing

    • Fix any issues or defects and retest

    • Once testing is complete, commission the system by putting it into ope...

  • Answered by AI
  • Q10. What are handover process to civil or facillities
  • Ans. 

    Handover process involves transferring responsibility and ownership of a project or facility from one party to another.

    • Ensure all necessary documentation is complete and accurate

    • Conduct a thorough inspection of the project or facility

    • Provide training and orientation to the new party

    • Establish clear communication channels for ongoing support

    • Obtain sign-off and acknowledgement of the handover

    • Examples: handover of a constr...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Lodha Group Site Supervisor interview:
  • Every thing is clear no hidden
Interview preparation tips for other job seekers - Lodha is good company for employee

Interview Questionnaire 

1 Question

  • Q1. How is your yearly Increment
  • Ans. 

    My yearly increment is based on my performance and the company's financial performance.

    • My yearly increment is determined by a performance review process.

    • The company evaluates my performance based on my achievements, skills, and contributions.

    • The increment amount is also influenced by the company's financial performance and budget.

    • I have consistently received positive feedback and higher increments due to my exceptional...

  • Answered by AI

Ejadah asset Management group Interview FAQs

How many rounds are there in Ejadah asset Management group MEP Supervisor interview?
Ejadah asset Management group interview process usually has 1 rounds. The most common rounds in the Ejadah asset Management group interview process are Technical.

Tell us how to improve this page.

People are getting interviews through

based on 1 Ejadah asset Management group interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 333 Interviews
CBRE Interview Questions
4.2
 • 251 Interviews
Square Yards Interview Questions
4.1
 • 194 Interviews
Sobha Interview Questions
3.9
 • 122 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 71 Interviews
Colliers India Interview Questions
3.9
 • 59 Interviews
View all
Ejadah asset Management group MEP Supervisor Salary
based on 10 salaries
₹8 L/yr - ₹12.8 L/yr
61% more than the average MEP Supervisor Salary in India
View more details

Ejadah asset Management group MEP Supervisor Reviews and Ratings

based on 3 reviews

3.8/5

Rating in categories

2.9

Skill development

2.9

Work-Life balance

4.6

Salary & Benefits

4.6

Job Security

4.6

Company culture

1.2

Promotions/Appraisal

2.9

Work Satisfaction

Explore 3 Reviews and Ratings
Hvac Technician
10 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

MEP Supervisor
10 salaries
unlock blur

₹8 L/yr - ₹12.9 L/yr

Electrical Technician
9 salaries
unlock blur

₹3.6 L/yr - ₹9 L/yr

Vice President
6 salaries
unlock blur

₹36 L/yr - ₹60 L/yr

MEP Engineer
5 salaries
unlock blur

₹9.6 L/yr - ₹10 L/yr

Explore more salaries
Compare Ejadah asset Management group with

JLL

4.1
Compare

CBRE

4.2
Compare

Knight Frank

4.1
Compare

Cushman & Wakefield

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview