  • Q1. Manitanece Field
  • Q2. Chiller and ahu troubleshoot and manitanece
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - One-on-one 

(1 Question)

  • Q1. How is removed compressor
  • Ans. 

    The compressor is removed by disconnecting electrical connections, refrigerant lines, and mounting bolts.

    • Disconnect electrical connections to the compressor

    • Disconnect refrigerant lines from the compressor

    • Remove mounting bolts securing the compressor in place

    • Carefully lift and remove the compressor from its location

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - How is remove compressor

Hvac Technician Interview Questions Asked at Other Companies

Q1. How many types of compressors in the world
Q2. There are five types of compressors in the world 1) reciprocating ... read more
asked in QNFS
Q3. 1 How many types of compressor ? 2 Electrical troubleshootin, sta ... read more
Q4. There are five types of compressors in the world (1) Reciprocatin ... read more
Q5. what is the cycle of weather and AC's importance

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Tell me about yourself
  • Q2. How do you join my company
  • Q3. Mera company this is best company in the world sir
  • Q4. I am Diploma mechanical engineer sir I need a new job
Round 3 - Technical 

(5 Questions)

  • Q1. Looking for a new jobs
  • Q2. Tell me about yourself
  • Q3. Hello ji mara pass kuch nehi hai abhi
  • Q4. Kya aap hamko job da satak hai Please
  • Q5. I am fantastic 👻boy

Interview Preparation Tips

Interview preparation tips for other job seekers - No tips I
I am looking for new job
HVAC Techniques

I applied via Approached by Company and was interviewed in May 2022. There were 4 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Speak about yourself
Round 2 - Assignment 
Round 3 - Technical 

(1 Question)

  • Q1. Questions to test knowledge of the market
Round 4 - Technical 

(1 Question)

  • Q1. Market related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Get an idea about the company, their projects. Ask questions to interviewers.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Advanced Excel Proficiency is tested
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

General awareness communication

Round 2 - Technical 

(2 Questions)

  • Q1. Based on Job applied
  • Q2. Based on job description

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to work
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is hvac, ups, ahu?
  • Ans. 

    HVAC stands for Heating, Ventilation, and Air Conditioning. UPS stands for Uninterruptible Power Supply. AHU stands for Air Handling Unit.

    • HVAC refers to the technology used for indoor environmental comfort, including heating, cooling, and air quality control.

    • UPS is a device that provides emergency power to a load when the input power source fails.

    • AHU is a device used to regulate and circulate air as part of a heating,

  • Answered by AI
  • Q2. What's air cold chiller?
  • Ans. 

    An air cold chiller is a device that cools air by removing heat from it.

    • An air cold chiller is commonly used in air conditioning systems to cool indoor spaces.

    • It works by circulating a refrigerant that absorbs heat from the air and then releases it outside.

    • The chilled air is then distributed through ducts or vents to cool the desired area.

    • Air cold chillers can be used in various settings such as homes, offices, hospita...

  • Answered by AI
  • Q3. What is a Ahu?
  • Ans. 

    An AHU (Air Handling Unit) is a device used to regulate and circulate air as part of a heating, ventilation, and air conditioning (HVAC) system.

    • AHU is an abbreviation for Air Handling Unit.

    • It is a device used in HVAC systems to control and distribute air.

    • AHUs typically consist of a fan, heating and cooling coils, filters, and dampers.

    • They are responsible for conditioning and circulating air within a building.

    • AHUs can b...

  • Answered by AI
  • Q4. What is a lp and hp
  • Ans. 

    LP stands for Low Pass and HP stands for High Pass.

    • LP (Low Pass) is a type of filter that allows low-frequency signals to pass through while attenuating high-frequency signals.

    • HP (High Pass) is a type of filter that allows high-frequency signals to pass through while attenuating low-frequency signals.

    • LP and HP filters are commonly used in audio systems to control the frequency range of the output signal.

    • LP filters are ...

  • Answered by AI
  • Q5. What is a ups?
  • Ans. 

    A UPS (Uninterruptible Power Supply) is a device that provides emergency power to a load when the input power source fails.

    • UPS is used to protect critical equipment from power outages, voltage fluctuations, and other power-related issues.

    • It typically consists of a battery, an inverter, and a rectifier.

    • UPS can be used for various applications such as computers, data centers, hospitals, telecommunications, etc.

    • Examples o...

  • Answered by AI
Round 3 - Technical 

(5 Questions)

  • Q1. What is pac, who to works?
  • Ans. 

    PAC stands for Programmable Automation Controller. It is a device used in industrial automation to control and monitor processes.

    • PAC is a type of controller used in industrial automation systems.

    • It is programmable and can be customized to control and monitor various processes.

    • PACs are often used in manufacturing plants, power plants, and other industrial settings.

    • They can communicate with other devices and systems to g...

  • Answered by AI
  • Q2. What is a water cold chiller?
  • Ans. 

    A water cold chiller is a device that cools water by removing heat from it, typically used in air conditioning systems or industrial processes.

    • A water cold chiller uses a refrigeration cycle to cool water.

    • It consists of components such as a compressor, condenser, expansion valve, and evaporator.

    • The chiller circulates chilled water through a system to remove heat from the surroundings.

    • It is commonly used in air conditio...

  • Answered by AI
  • Q3. What is a acb, vcb?
  • Ans. 

    ACB stands for Air Circuit Breaker and VCB stands for Vacuum Circuit Breaker.

    • ACB is a type of circuit breaker that uses air as the medium to extinguish the arc.

    • VCB is a type of circuit breaker that uses vacuum as the medium to extinguish the arc.

    • Both ACB and VCB are used for electrical circuit protection and can interrupt the flow of current in case of faults.

    • ACBs are commonly used in low voltage applications, while VC...

  • Answered by AI
  • Q4. Which type ac unit using for server room?
  • Ans. 

    Precision air conditioning units are commonly used in server rooms.

    • Precision air conditioning units are designed to provide precise temperature and humidity control.

    • These units are capable of maintaining stable and optimal conditions for sensitive equipment like servers.

    • They often feature redundant systems for reliability and may include features like hot aisle/cold aisle containment.

    • Examples of precision air condition...

  • Answered by AI
  • Q5. What is a csu?
  • Ans. 

    A CSU, or Channel Service Unit, is a device used in telecommunications to connect a digital line to a customer's equipment.

    • CSU stands for Channel Service Unit.

    • It is used in telecommunications to connect a digital line to a customer's equipment.

    • CSUs provide signal regeneration, line coding, and diagnostic capabilities.

    • They ensure reliable transmission of data over long distances.

    • Examples of CSUs include T1 CSUs, ISDN CS

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Cushman & Wakefield Technician interview:
  • Technical Support
  • Electricals
  • HVAC System
  • Fire Safety
Interview preparation tips for other job seekers - Before attended the interview take a self confidence and possesnes.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Sr.enjineer mock test

Round 2 - Technical 

(1 Question)

  • Q1. Ups safety realted Csu realted

I applied via Approached by Company and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Electrical mitancance

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir i well get my job I'm in b problem

I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. About personal information
Round 2 - One-on-one 

(1 Question)

  • Q1. About technical terms , field related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary discussion and joining date and all stuff

Ejadah asset Management group Interview FAQs

How many rounds are there in Ejadah asset Management group Hvac Technician interview?
Ejadah asset Management group interview process usually has 1 rounds. The most common rounds in the Ejadah asset Management group interview process are One-on-one Round.
What are the top questions asked in Ejadah asset Management group Hvac Technician interview?

Some of the top questions asked at the Ejadah asset Management group Hvac Technician interview -

  1. How is removed compres...read more
  2. Chiller and ahu troubleshoot and manitan...read more
  3. Manitanece Fi...read more

Tell us how to improve this page.

Ejadah asset Management group Hvac Technician Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 136 Interviews
Lodha Group Interview Questions
4.0
 • 129 Interviews
DLF Interview Questions
4.0
 • 77 Interviews
Colliers India Interview Questions
3.9
 • 70 Interviews
Casagrand Interview Questions
3.8
 • 58 Interviews
View all
Ejadah asset Management group Hvac Technician Salary
based on 8 salaries
₹3 L/yr - ₹7.2 L/yr
65% more than the average Hvac Technician Salary in India
View more details

Ejadah asset Management group Hvac Technician Reviews and Ratings

based on 11 reviews

3.9/5

Rating in categories

3.6

Skill development

3.4

Work-life balance

3.4

Salary

3.3

Job security

3.6

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 11 Reviews and Ratings
MEP Supervisor
9 salaries
unlock blur

₹8 L/yr - ₹12 L/yr

Hvac Technician
8 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Electrical Technician
8 salaries
unlock blur

₹4.8 L/yr - ₹9 L/yr

Vice President
6 salaries
unlock blur

₹36 L/yr - ₹60 L/yr

Facility Engineer
6 salaries
unlock blur

₹9 L/yr - ₹21 L/yr

Explore more salaries
Compare Ejadah asset Management group with

Sobha

3.8
Compare

Lodha Group

4.0
Compare

Cushman & Wakefield

4.1
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview