Filter interviews by
I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
STLC stands for Software Testing Life Cycle. It is a process of testing software in a systematic and planned way.
STLC involves different phases like requirement analysis, test planning, test design, test execution, and test closure.
Each phase has specific activities and deliverables to ensure the quality of the software.
STLC helps in identifying defects early in the software development process, reducing the cost of fi...
We use Scrum framework in our Agile process, with daily stand-ups, sprint planning, reviews, and retrospectives.
Scrum framework is used for project management
Daily stand-ups for quick updates and issue resolution
Sprint planning to set goals for each iteration
Reviews to assess progress and make adjustments
Retrospectives to reflect on what went well and what can be improved
TestNG is better for complex test cases and parallel testing, while Junit is simpler and more widely used.
TestNG is better for complex test cases with features like parameterization, grouping, and parallel testing
Junit is simpler and more widely used, especially in smaller projects
TestNG allows for more flexibility and customization in test execution
Junit is more lightweight and easier to set up and use
Consider the spe...
HTTP methods used in API testing include GET, POST, PUT, DELETE, PATCH, and OPTIONS.
GET - Used to retrieve data from the server
POST - Used to submit data to the server
PUT - Used to update existing data on the server
DELETE - Used to remove data from the server
PATCH - Used to partially update data on the server
OPTIONS - Used to retrieve information about the communication options available for a resource
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
Moulding defects case study which you improve.
posted on 18 Feb 2025
I was interviewed in Aug 2024.
I applied via Company Website and was interviewed in Nov 2024. There were 2 interview rounds.
I have over 10 years of experience in various leadership roles, including managing teams, developing strategies, and achieving business goals.
Managed a team of 50 employees in my previous role as Regional Manager
Developed and implemented a new sales strategy that increased revenue by 20%
Achieved business goals by consistently exceeding quarterly targets
I was interviewed in Aug 2024.
Testing of plant parameters involves ensuring that all critical parameters are within specified limits to maintain optimal plant performance.
Conducting regular testing of parameters such as temperature, pressure, flow rate, and chemical composition
Using various testing equipment such as thermometers, pressure gauges, flow meters, and analyzers
Comparing test results with established standards and taking corrective actio...
Analysis of incoming raw materials and FG product dispatch involves testing base oil and additives for quality control purposes.
Perform thorough testing on incoming raw materials to ensure quality standards are met
Conduct analysis on FG product dispatch to verify consistency and quality
Test base oil for purity and quality before using in production processes
Analyze additives for effectiveness and compatibility with bas...
Hydrostatic pressure is the pressure exerted by a fluid at equilibrium due to the force of gravity.
Hydrostatic pressure increases with depth in a fluid
It is calculated as the product of the fluid density, acceleration due to gravity, and depth
Hydrostatic pressure is important in various fields such as fluid mechanics, engineering, and geology
The quantity of air in a room can be calculated by multiplying the room's length, width, and height.
Calculate the volume of the room by multiplying its length, width, and height
Use the formula: Volume = Length x Width x Height
Convert the volume to the quantity of air by considering the density of air (typically around 1.225 kg/m^3)
based on 2 interviews
Interview experience
based on 34 reviews
Rating in categories
Software Developer
57
salaries
| ₹3.8 L/yr - ₹16.3 L/yr |
Senior Software Developer
26
salaries
| ₹9.5 L/yr - ₹28 L/yr |
Senior Software Engineer
23
salaries
| ₹13 L/yr - ₹27 L/yr |
Software Engineer
21
salaries
| ₹7 L/yr - ₹13.5 L/yr |
Technical Lead
14
salaries
| ₹23 L/yr - ₹40 L/yr |
Tata Group
Reliance Industries
Aditya Birla Group
Mahindra & Mahindra