i
Dorset Industries
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 2 interview rounds.
Sheet metal blank length calculation involves determining the length of material needed for a specific project.
Calculate the total length required by adding the perimeter of the part to the allowance for bending and trimming.
Consider the bend allowance and K-factor when calculating the blank length.
Use formulas or software tools to accurately calculate the blank length for different types of sheet metal projects.
The development stage of the shown part is early stage of growth.
The part is still in the initial phase of development
It is likely to undergo further growth and maturation
Developmental processes such as cell division and differentiation are ongoing
SolidWorks is a software used for creating 3D designs and models.
SolidWorks is a popular computer-aided design (CAD) software used for creating 3D models.
It allows users to create detailed designs of mechanical parts, assemblies, and drawings.
Users can simulate motion, stress analysis, and other engineering processes within SolidWorks.
SolidWorks is commonly used in industries such as automotive, aerospace, and manufact...
The new product development process involves identifying opportunities, generating ideas, testing concepts, and launching the product.
Identify market opportunities and consumer needs
Generate ideas for new products or improvements to existing products
Test concepts through market research and prototype development
Develop a marketing strategy and launch the product
Evaluate the success of the new product and make adjustmen
The new product development process involves creating detailed drawings to guide the manufacturing and assembly of the product.
The new product development process typically starts with ideation and market research to identify customer needs and preferences.
Once a concept is chosen, engineers and designers create detailed drawings and specifications for the product.
These drawings serve as a guide for manufacturing and a...
Top trending discussions
I applied via Shine and was interviewed before May 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 23 Nov 2019
I applied via Naukri.com and was interviewed before Feb 2021. There were 3 interview rounds.
Subject expert question
I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 14 Apr 2024
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There was 1 interview round.
The silo method of cement is a storage system used in the construction industry to store bulk quantities of cement.
Silo method involves storing cement in tall, cylindrical structures called silos.
Cement is loaded into the silo from the top and discharged through the bottom using conveyor belts or air slides.
Silo method helps in efficient storage, handling, and transportation of cement on construction sites.
Examples of ...
The process for erection in complete pyro section involves assembling and installing all components for the pyro processing unit.
Prepare the site for erection by clearing the area and ensuring proper foundation
Assemble the various components of the pyro section such as kiln, preheater, cooler, and other equipment
Install the components according to the manufacturer's specifications and engineering drawings
Connect all ne...
I applied via Recruitment Consulltant and was interviewed in Aug 2021. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 4 reviews
Rating in categories
Assistant Area Manager
48
salaries
| ₹4.8 L/yr - ₹8.4 L/yr |
Senior Sales Officer
46
salaries
| ₹4 L/yr - ₹6.8 L/yr |
Sales Officer
38
salaries
| ₹2.7 L/yr - ₹5.7 L/yr |
Senior Officer
27
salaries
| ₹4.5 L/yr - ₹6.2 L/yr |
Officer
22
salaries
| ₹3.6 L/yr - ₹5.5 L/yr |
JK Cement
ACC
Ambuja Cements
Nuvoco Vistas