There are several types of formwork used in construction.
Formwork for columns
Formwork for beams
Formwork for slabs
Formwork for walls
Formwork for stairs
Tunnel formwork
Bridge formwork
Tension force occurs on the bottom of the cantilever beam.
Tension force is caused by the bending moment in the beam.
The bottom of the beam is in tension while the top is in compression.
The location of maximum tension force depends on the loading and support conditions.
Examples of cantilever beams include diving boards and balconies.
Top trending discussions
posted on 6 Feb 2025
posted on 6 Jul 2024
I was interviewed in Jan 2024.
I applied via Referral and was interviewed in Feb 2022. There were 2 interview rounds.
Answering questions related to projects, dynamic analysis, toughest project, pile foundations, and steel connection design.
Projects handled: Mention the types of projects, their scale, and your role in them.
Dynamic analysis methods: Explain different methods like time history analysis, response spectrum analysis, etc.
Modal combination methods: Discuss different methods like CQC, SRSS, ABS, etc., and their differences.
T...
posted on 9 Mar 2023
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 3 interview rounds.
posted on 22 Apr 2024
I was interviewed in Nov 2023.
Discussion about planing, sheduling, exicution, cordination
I applied via Recruitment Consulltant and was interviewed before Jun 2023. There were 2 interview rounds.
Fe500D is a grade of steel used in construction, indicating its yield strength in megapascals.
Fe500D is a type of steel used in construction with a yield strength of 500 megapascals.
The 'Fe' stands for iron, while the '500' indicates the yield strength in megapascals.
The 'D' in Fe500D signifies that it is a ductile steel grade.
Fe500D steel is commonly used in reinforced concrete structures for its high strength and duc
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
The quantity of cement in M35 mix is typically around 420 kg/m3.
The proportion of cement in M35 mix is usually 1:1.5:3 (cement:sand:aggregate)
For 1 cubic meter of M35 mix, the cement required is approximately 420 kg
The exact quantity may vary based on specific project requirements and mix design
A tremie pipe is used in construction to place concrete underwater without washing out the cement content.
Tremie pipe is a long pipe with a hopper at the top for pouring concrete underwater.
It is used to prevent segregation of concrete and ensure proper placement in underwater structures.
The pipe is slowly lifted as the concrete is poured to maintain a continuous flow and avoid voids.
Tremie pipes are commonly used in t...
The dia of tremie pipe refers to the diameter of the pipe used for placing concrete underwater.
The diameter of a tremie pipe is typically between 8 to 12 inches.
A larger diameter tremie pipe is used for larger volume concrete placements.
The diameter of the tremie pipe should be selected based on the specific project requirements and conditions.
The diameter of the tremie pipe affects the rate at which concrete can be pl
The cutoff level refers to the minimum score or standard required to pass a test or qualify for a certain position.
Cutoff level can vary depending on the specific test or criteria being used.
It is often used in academic exams, job interviews, and selection processes.
For example, a job may require a minimum cutoff level of 70% in a technical test to qualify for an interview.
posted on 20 Feb 2022
I applied via Naukri.com and was interviewed in Aug 2021. There were 2 interview rounds.
Reinforcement is provided in column to increase its load-bearing capacity and prevent failure due to compression.
Reinforcement helps to resist bending and shear forces in the column.
It also helps to prevent buckling and reduces the risk of collapse.
The amount and type of reinforcement used depends on the size and height of the column.
For example, a taller and thinner column may require more reinforcement than a shorter
The slump range for boom pressure varies depending on the specific project requirements and concrete mix design.
The slump range for boom pressure is typically determined by the concrete mix design and the desired workability of the concrete.
It can range from low slump (around 25-50 mm) for high-strength concrete with low water-cement ratio to high slump (around 150-200 mm) for self-compacting concrete.
The slump range m...
Accountability is the responsibility to answer for one's actions, while productivity is the measure of efficiency and output in achieving goals.
Accountability refers to being answerable for one's actions, decisions, and performance.
It involves taking ownership of tasks and outcomes, and being transparent and responsible.
Productivity is the measure of how efficiently and effectively work is completed.
It focuses on achie...
Yes, safety is a top priority at L&T and there are strict safety rules in place.
L&T has a comprehensive safety policy that covers all aspects of their operations.
All employees are required to undergo safety training and follow safety protocols.
Regular safety audits are conducted to ensure compliance with safety rules.
Personal protective equipment is provided to employees and its use is mandatory in hazardous areas.
Safe...
We follow a comprehensive quality control plan that includes regular inspections, testing, and documentation.
Develop and implement a quality control plan
Conduct regular inspections and testing
Document all quality control activities
Ensure compliance with industry standards and regulations
Provide training to staff on quality control procedures
posted on 22 Feb 2024
I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.
based on 1 review
Rating in categories
HSE Officer
19
salaries
| ₹7.5 L/yr - ₹16.5 L/yr |
Senior Engineer
15
salaries
| ₹10 L/yr - ₹37.2 L/yr |
Safety Officer
12
salaries
| ₹5.9 L/yr - ₹14.1 L/yr |
Instrument Engineer
9
salaries
| ₹8.9 L/yr - ₹16.4 L/yr |
Document Controller
8
salaries
| ₹6 L/yr - ₹14.1 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Reliance Infrastructure