Sales Manager Interview Questions & Answers

user image Anonymous

posted on 10 Aug 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Personal question and technical information

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
4-6 weeks
Result
Selected Selected

Interview Preparation Tips

Interview preparation tips for other job seekers - The MD is quite rude
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

Interview Preparation Tips

Interview preparation tips for other job seekers - Do your best

I applied via Company Website and was interviewed before Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Something about yourself.
  • Q2. Jobs and services handled, Business target etc. Relevant technical knowledge.
  • Q3. Why you want to work with L&T.
  • Q4. What CTC you want and why?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be cool & confident while answering the questions. Don't ever show the interviewer that you really want this job.

I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Accomodation and vechile facilities need .

Interview Preparation Tips

Interview preparation tips for other job seekers - In reliance they not give accommodation and vechile facilities to reach site. Only problem was a big problem. Company good

I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe in yourself and done your all duties responsibilities properly and report your senior.

I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Power Transmission & distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview for technical purpose.

I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What are the standards used for plant layout in refineries
  • Ans. 

    Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.

    • Plant layout should prioritize safety and minimize the risk of accidents.

    • Efficiency is also important, with consideration given to the flow of materials and equipment.

    • Regulations and industry standards must be followed, such as those set by OSHA and API.

    • Examples of layout considerations include spacing between equipment,...

  • Answered by AI
  • Q2. What is the frequency on visiting Vendor Shops for expediting
  • Ans. 

    The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.

    • The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.

    • It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...

  • Answered by AI
  • Q3. Have You worked in CDU-VDU unit?
  • Q4. What is DCU?
  • Ans. 

    DCU stands for Dublin City University, a university located in Dublin, Ireland.

    • DCU was established in 1980 and has over 17,000 students.

    • It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.

    • DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.

    • Some not...

  • Answered by AI
  • Q5. Why it is called delayed?
  • Ans. 

    Delayed is called so because it refers to something that is postponed or occurs after the expected time.

    • The term 'delayed' is used to describe situations where there is a time lag or postponement.

    • It implies that something is not happening immediately or as scheduled.

    • Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.

    • For example, a delayed flight refers to ...

  • Answered by AI
  • Q6. What happens at CDU-VDU?

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one technical interview and final negotiation with HR

Skills evaluated in this interview

I appeared for an interview before May 2020.

Interview Questionnaire 

1 Question

  • Q1. How to fix rate of 1 cum metre rcc for m10 and m20
  • Ans. 

    To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.

    • Determine the cost of materials required for 1 cum metre RCC for M10 and M20

    • Calculate the labor cost involved in the construction process

    • Consider the cost of equipment required for the construction process

    • Include overheads like transportation, insurance, and taxes

    • Compare the ra...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - technicalviru.in

I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What we do for shortage of material received?
  • Ans. 

    When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.

    • Contact the supplier to inform them about the shortage and request immediate resolution

    • Check inventory records and cross-verify with the supplier's delivery documentation

    • Investigate the cause of the shortage, such as shipping errors or miscommunication

    • Implement measures to prevent future short...

  • Answered by AI
  • Q2. Can we do correction in invoice? if ans is yes then what are the further steps?
  • Ans. 

    Yes, corrections can be made in an invoice by following certain steps.

    • The correction should be made as soon as possible to avoid any confusion.

    • The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.

    • A new invoice should be created with the correct information and a reference to the original invoice.

    • The reason for the correction should be clearly stated on the new invoice.

    • Both the origin...

  • Answered by AI
  • Q3. Various SAP T code for Issues
  • Ans. 

    Various SAP T codes for Issues

    • MB21 - Create Reservation

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

    • MB1T - Transfer Posting

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive; interviewer may cross checks your confidence through various counter question, but what is right is right it can not be wrong, if interviewer says it wrong then don't go by interviewer words, always stick with your belief and knowledge.

Skills evaluated in this interview

Contribute & help others!
anonymous
You can choose to be anonymous

Dodsal Engineering & Construction Interview FAQs

How many rounds are there in Dodsal Engineering & Construction Sales Manager interview?
Dodsal Engineering & Construction interview process usually has 2 rounds. The most common rounds in the Dodsal Engineering & Construction interview process are HR and Group Discussion.

Recently Viewed

SALARIES

Corelynx Solutions

SALARIES

Corelynx Solutions

SALARIES

Bahwan Engineering

INTERVIEWS

Dodsal Engineering & Construction

No Interviews

INTERVIEWS

Sany Heavy Industry

No Interviews

REVIEWS

Corelynx Solutions

No Reviews

REVIEWS

Corelynx Solutions

No Reviews

SALARIES

Cojag Smart Technology

SALARIES

Cojag Smart Technology

SALARIES

Cojag Smart Technology

Tell us how to improve this page.

Dodsal Engineering & Construction Sales Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 745 Interviews
Tata Projects Interview Questions
4.2
 • 428 Interviews
AECOM Interview Questions
4.2
 • 115 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
View all
HSE Officer
19 salaries
unlock blur

₹7.5 L/yr - ₹16.5 L/yr

Senior Engineer
15 salaries
unlock blur

₹10 L/yr - ₹37.2 L/yr

Safety Officer
12 salaries
unlock blur

₹5.9 L/yr - ₹14.1 L/yr

Instrument Engineer
9 salaries
unlock blur

₹8.9 L/yr - ₹16.4 L/yr

Document Controller
8 salaries
unlock blur

₹6 L/yr - ₹14.1 L/yr

Explore more salaries
Compare Dodsal Engineering & Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview