I applied via Referral and was interviewed before Aug 2020. There were 3 interview rounds.
BBS preparation is essential for ensuring the strength and stability of footings and slabs.
BBS stands for Bar Bending Schedule and involves preparing a detailed list of reinforcement bars required for the footing or slab.
The BBS takes into account the design drawings and specifications to ensure the correct size, spacing, and placement of reinforcement bars.
The BBS also helps to estimate the quantity of steel required ...
The quantity of cement and sand in 1sqm plastering depends on the thickness of the plaster.
The thickness of the plaster is a crucial factor in determining the quantity of cement and sand.
The ratio of cement to sand also affects the quantity.
For a 15mm thick plaster, the approximate quantity of cement is 16 kg and sand is 75 kg per square meter.
For a 20mm thick plaster, the approximate quantity of cement is 21 kg and sa
posted on 15 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Aug 2020. There were 3 interview rounds.
BBS preparation is essential for ensuring the strength and stability of footings and slabs.
BBS stands for Bar Bending Schedule and involves preparing a detailed list of reinforcement bars required for the footing or slab.
The BBS takes into account the design drawings and specifications to ensure the correct size, spacing, and placement of reinforcement bars.
The BBS also helps to estimate the quantity of steel required ...
The quantity of cement and sand in 1sqm plastering depends on the thickness of the plaster.
The thickness of the plaster is a crucial factor in determining the quantity of cement and sand.
The ratio of cement to sand also affects the quantity.
For a 15mm thick plaster, the approximate quantity of cement is 16 kg and sand is 75 kg per square meter.
For a 20mm thick plaster, the approximate quantity of cement is 21 kg and sa
based on 1 review
Rating in categories
Site Engineer
4
salaries
| ₹3.5 L/yr - ₹4.8 L/yr |
Senior Site Engineer
4
salaries
| ₹3.5 L/yr - ₹6 L/yr |
HR Manager
3
salaries
| ₹7.6 L/yr - ₹8.6 L/yr |
Senior Manager Legal
3
salaries
| ₹11 L/yr - ₹16 L/yr |
QS Engineer
3
salaries
| ₹3.5 L/yr - ₹4 L/yr |
Flipkart
Amazon
Snapdeal
Paytm