BBS preparation is essential for ensuring the strength and stability of footings and slabs.
BBS stands for Bar Bending Schedule and involves preparing a detailed list of reinforcement bars required for the footing or slab.
The BBS takes into account the design drawings and specifications to ensure the correct size, spacing, and placement of reinforcement bars.
The BBS also helps to estimate the quantity of steel required ...
The quantity of cement and sand in 1sqm plastering depends on the thickness of the plaster.
The thickness of the plaster is a crucial factor in determining the quantity of cement and sand.
The ratio of cement to sand also affects the quantity.
For a 15mm thick plaster, the approximate quantity of cement is 16 kg and sand is 75 kg per square meter.
For a 20mm thick plaster, the approximate quantity of cement is 21 kg and sa
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
posted on 19 Sep 2023
I applied via Referral
I appeared for an interview before Jan 2023.
Technical, English, reasoning
The market potential for the Senior Engineer role is high due to increasing demand for skilled professionals in the industry.
Growing demand for senior engineers in various industries
Increasing adoption of technology and digital transformation
Emerging markets and new opportunities
Expanding job market and career growth prospects
posted on 7 Nov 2023
I applied via Referral and was interviewed in Oct 2023. There were 3 interview rounds.
I applied via Indeed and was interviewed in Jul 2023. There were 2 interview rounds.
The erection of a cement mill involves the installation and assembly of the mill equipment and machinery.
The cement mill is typically a large cylindrical structure where raw materials are ground into fine powder.
The erection process includes the installation of the mill shell, liners, diaphragm, and grinding media.
Proper alignment and leveling of the mill components are crucial for efficient operation.
Electrical and me...
The procedure of erection involves the process of assembling and installing structural components to create a stable and functional structure.
Planning and preparation
Site preparation and foundation
Assembly of structural components
Installation of utilities and systems
Finishing and testing
Final inspection and handover
Planning of the erection involves creating a detailed plan for the construction process.
Identify the scope and objectives of the project
Determine the sequence of activities and their dependencies
Allocate resources and manpower
Create a schedule and timeline
Consider safety measures and risk management
Coordinate with other teams and stakeholders
Monitor progress and make adjustments as necessary
based on 1 review
Rating in categories
Site Engineer
4
salaries
| ₹3.5 L/yr - ₹4.8 L/yr |
Senior Site Engineer
4
salaries
| ₹3.5 L/yr - ₹6 L/yr |
HR Manager
3
salaries
| ₹7.6 L/yr - ₹8.6 L/yr |
Senior Manager Legal
3
salaries
| ₹11 L/yr - ₹16 L/yr |
QS Engineer
3
salaries
| ₹3.5 L/yr - ₹4 L/yr |
JK Cement
ACC
Sobha
Lodha Group