i
Filter interviews by
The process for calculating electrical load involves determining the total power consumption of all devices connected to a circuit or system.
Identify all devices connected to the circuit or system
Determine the power rating (in watts) of each device
Calculate the total power consumption by summing up the power ratings of all devices
Consider factors like power factor and diversity to account for variations in load
Transformer and diesel generator sizing involves calculating load requirements and selecting appropriate equipment.
Calculate total connected load to determine transformer size
Consider future load growth when sizing transformers
Calculate total power requirements to determine DG set size
Factor in starting currents and power factor when sizing DG sets
Consult manufacturer specifications for accurate sizing
Different types of transformers include power transformers, distribution transformers, instrument transformers, and autotransformers.
Power transformers are used to step up or step down voltage for transmission and distribution.
Distribution transformers are used to supply lower voltage to end-users.
Instrument transformers are used for measuring voltage and current in high voltage systems.
Autotransformers have a single w
Various types and sizes of cables are available in the market for different electrical applications.
Types of cables include power cables, control cables, instrumentation cables, communication cables, etc.
Sizes of cables range from small gauge sizes like 18 AWG to larger sizes like 1000 MCM.
Examples of cables include THHN, XHHW, Cat5e, RG6, etc.
Different types of earthing include plate earthing, pipe earthing, rod earthing, strip earthing, and water pipe earthing.
Plate earthing involves burying a plate made of copper or galvanized iron in the ground.
Pipe earthing uses a pipe made of galvanized iron to provide a low-resistance path to the ground.
Rod earthing involves driving a metal rod into the ground to provide a connection for earthing.
Strip earthing uses a...
Various electrical hazards include electric shock, burns, fires, and explosions.
Electric shock from contact with live wires or equipment
Burns from electrical arcs or overheated equipment
Fires caused by electrical faults or short circuits
Explosions due to ignition of flammable materials by electrical sparks
Injuries from falls caused by electric shock or sudden movements due to electrical hazards
I was the Senior Electrical Engineer in my previous company.
Managed a team of electrical engineers
Responsible for designing and implementing electrical systems
Collaborated with other departments to ensure project success
I am available to join within 2 weeks of receiving the offer letter.
Available to join within 2 weeks of receiving offer letter
Flexible with start date based on company needs
Can discuss potential start date during interview process
My notice period is currently one month.
Notice period is one month
I am required to give one month notice before leaving my current position
I can start in one month if selected for this role
I was interviewed in Dec 2024.
How do you about of civil store knowledge
Lessons learned from HR policy include importance of clear communication, fair treatment, and consistent enforcement.
Clear communication is essential to ensure employees understand policies and procedures.
Fair treatment of all employees promotes a positive work environment and reduces turnover.
Consistent enforcement of HR policies helps maintain a sense of fairness and accountability.
Regular training and updates on HR ...
Dineshchandra R. Agrawal Infracon interview questions for popular designations
I applied via Approached by Company and was interviewed in Nov 2023. There were 5 interview rounds.
I have 10 years of experience as a Sr. Safety Officer in various construction projects.
Managed safety protocols and procedures on construction sites
Conducted regular safety inspections and audits
Developed and implemented safety training programs for employees
Investigated and reported accidents and incidents
Ensured compliance with local and national safety regulations
Collaborated with project managers to identify and mi
I like work in new company and very important opportunity for my future.
Ensuring that all safety activities are appropriately documented.
Inspection of all mechanical equipment & tagging system, update checklist.
Accident prevention, Hazard identification and risk assessment, Training, HSE Audit, Site inspection, Mock drills ETC.
As a Sr. Safety Officer, my job is to prepare the site, prevent accidents, and verify documents.
My job involves ensuring the site is prepared for safe operations.
I conduct risk assessments and implement safety measures.
I train employees on safety protocols and procedures.
I regularly inspect the site for potential hazards and take corrective actions.
I maintain and update safety documentation and records.
I verify documen...
Get interview-ready with Top Dineshchandra R. Agrawal Infracon Interview Questions
I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Nov 2023. There was 1 interview round.
Some of the top questions asked at the Dineshchandra R. Agrawal Infracon interview for experienced candidates -
The duration of Dineshchandra R. Agrawal Infracon interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 17 interviews
Interview experience
based on 482 reviews
Rating in categories
Assistant Manager
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Engineer
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure