Filter interviews by
I applied via LinkedIn and was interviewed before Sep 2023. There was 1 interview round.
To mitigate delays in project schedule, focus on proper planning, communication, resource allocation, and risk management.
Develop a detailed project schedule with clear milestones and deadlines.
Regularly communicate with all stakeholders to ensure everyone is on the same page.
Allocate resources effectively to prevent bottlenecks and delays.
Identify potential risks and have contingency plans in place to address them.
Reg...
Quality tests for civil work ensure that construction meets standards and specifications.
Concrete testing for compressive strength
Soil testing for bearing capacity
Steel reinforcement testing for tensile strength
Waterproofing testing for leakages
Asphalt testing for durability
I applied via Nespapaer and was interviewed before Dec 2023. There were 2 interview rounds.
Quality checks for concrete ensure strength, durability, and consistency.
Check the slump test to ensure proper workability
Perform compressive strength tests on samples
Inspect for air content to prevent cracking
Verify proper curing methods are being used
Check for uniformity in color and texture
Weather conditions, material delays, and design changes have been hindrances during execution.
Weather conditions such as heavy rain or extreme heat can delay construction progress.
Material delays from suppliers can cause setbacks in the project timeline.
Design changes requested by the client or architect can lead to rework and additional time and cost.
I have to serve a notice period of 30 days in my present organization.
I am required to give a 30-day notice before leaving my current job.
This allows my employer to find a replacement and ensure a smooth transition.
The notice period is a standard practice in most organizations.
I am prepared to fulfill this obligation before joining a new company.
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.
Dcpl interview questions for popular designations
Top trending discussions
posted on 24 Mar 2021
posted on 13 Sep 2021
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
posted on 14 Sep 2021
posted on 16 Nov 2021
I applied via Campus Placement and was interviewed before Nov 2020. There were 3 interview rounds.
posted on 6 Aug 2021
Write a query
Specify the database and table name
List the columns to be selected
Add any conditions or filters
Specify the order of results
posted on 29 Jun 2015
based on 3 interviews
Interview experience
Senior Project Engineer
7
salaries
| ₹6 L/yr - ₹17 L/yr |
Design Engineer
5
salaries
| ₹3 L/yr - ₹5 L/yr |
Senior Project Engineer Mechanical
4
salaries
| ₹7.5 L/yr - ₹8.1 L/yr |
Operation Assistant
4
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Quality Manager
4
salaries
| ₹16 L/yr - ₹16 L/yr |
Reliance Communications
Henry Harvin Education
GAO Tek
Tata Teleservices