I applied via Nespapaer and was interviewed before Dec 2023. There were 2 interview rounds.
Quality checks for concrete ensure strength, durability, and consistency.
Check the slump test to ensure proper workability
Perform compressive strength tests on samples
Inspect for air content to prevent cracking
Verify proper curing methods are being used
Check for uniformity in color and texture
Weather conditions, material delays, and design changes have been hindrances during execution.
Weather conditions such as heavy rain or extreme heat can delay construction progress.
Material delays from suppliers can cause setbacks in the project timeline.
Design changes requested by the client or architect can lead to rework and additional time and cost.
I have to serve a notice period of 30 days in my present organization.
I am required to give a 30-day notice before leaving my current job.
This allows my employer to find a replacement and ensure a smooth transition.
The notice period is a standard practice in most organizations.
I am prepared to fulfill this obligation before joining a new company.
Top trending discussions
posted on 20 Jan 2025
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
I have extensive experience working on various oil and gas projects, including pipeline construction and refinery expansions.
Managed construction of a new oil pipeline spanning 100 miles
Led a team in the expansion of a gas refinery, increasing production capacity by 20%
Implemented safety protocols for oil drilling projects in compliance with industry regulations
I have worked with various piping materials including PVC, copper, steel, and PEX.
PVC
Copper
Steel
PEX
The ASME Code is a set of standards developed by the American Society of Mechanical Engineers for the design, fabrication, and inspection of mechanical systems.
ASME Code sets standards for the design, fabrication, and inspection of mechanical systems
It ensures safety, reliability, and quality in engineering practices
Examples include ASME Boiler and Pressure Vessel Code, ASME B31.1 Power Piping Code
Mechanical clearance refers to the physical space required for the proper functioning of mechanical components.
Mechanical clearance is the space needed between moving parts to prevent interference or contact.
It ensures that components can move freely without causing damage or malfunction.
Examples include the gap between gears in a gearbox or the clearance between a piston and cylinder in an engine.
The material code for stainless steel piping is ASTM A312.
ASTM A312 is the standard specification for seamless, welded, and heavily cold worked austenitic stainless steel pipes.
It covers grades such as TP304, TP316, TP321, etc.
The material code is important for ensuring the correct type and quality of stainless steel piping is used in construction projects.
My current Cost to Company (CTC) is $80,000 per year.
My current CTC is $80,000 per year
It includes my salary, bonuses, benefits, and any other compensation provided by the company
I am open to discussing potential adjustments based on the job offer
I expect challenging projects, opportunities for growth, and a supportive team environment.
Challenging projects that allow me to utilize my skills and knowledge
Opportunities for professional growth and development
A supportive team environment where collaboration is encouraged
Clear communication and expectations from management
I have a Bachelor's degree in Civil Engineering, 5 years of experience in construction projects, and proficiency in AutoCAD and project management software.
Bachelor's degree in Civil Engineering
5 years of experience in construction projects
Proficiency in AutoCAD and project management software
Senior Project Engineer
7
salaries
| ₹6 L/yr - ₹17 L/yr |
Design Engineer
5
salaries
| ₹3 L/yr - ₹5 L/yr |
Senior Project Engineer Mechanical
4
salaries
| ₹7.5 L/yr - ₹8.1 L/yr |
Operation Assistant
4
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Quality Manager
4
salaries
| ₹16 L/yr - ₹16 L/yr |
TCS
Infosys
Wipro
HCLTech