I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
I have extensive experience working on various oil and gas projects, including pipeline construction and refinery expansions.
Managed construction of a new oil pipeline spanning 100 miles
Led a team in the expansion of a gas refinery, increasing production capacity by 20%
Implemented safety protocols for oil drilling projects in compliance with industry regulations
I have worked with various piping materials including PVC, copper, steel, and PEX.
PVC
Copper
Steel
PEX
The ASME Code is a set of standards developed by the American Society of Mechanical Engineers for the design, fabrication, and inspection of mechanical systems.
ASME Code sets standards for the design, fabrication, and inspection of mechanical systems
It ensures safety, reliability, and quality in engineering practices
Examples include ASME Boiler and Pressure Vessel Code, ASME B31.1 Power Piping Code
Mechanical clearance refers to the physical space required for the proper functioning of mechanical components.
Mechanical clearance is the space needed between moving parts to prevent interference or contact.
It ensures that components can move freely without causing damage or malfunction.
Examples include the gap between gears in a gearbox or the clearance between a piston and cylinder in an engine.
The material code for stainless steel piping is ASTM A312.
ASTM A312 is the standard specification for seamless, welded, and heavily cold worked austenitic stainless steel pipes.
It covers grades such as TP304, TP316, TP321, etc.
The material code is important for ensuring the correct type and quality of stainless steel piping is used in construction projects.
My current Cost to Company (CTC) is $80,000 per year.
My current CTC is $80,000 per year
It includes my salary, bonuses, benefits, and any other compensation provided by the company
I am open to discussing potential adjustments based on the job offer
I expect challenging projects, opportunities for growth, and a supportive team environment.
Challenging projects that allow me to utilize my skills and knowledge
Opportunities for professional growth and development
A supportive team environment where collaboration is encouraged
Clear communication and expectations from management
I have a Bachelor's degree in Civil Engineering, 5 years of experience in construction projects, and proficiency in AutoCAD and project management software.
Bachelor's degree in Civil Engineering
5 years of experience in construction projects
Proficiency in AutoCAD and project management software
Top trending discussions
I appeared for an interview before Mar 2024, where I was asked the following questions.
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
posted on 12 Dec 2024
The question is related to structural engineering concepts like code, footing design, and load combination.
Code refers to the set of rules and regulations that govern the design and construction of structures.
Footing design involves determining the size and depth of footings to support the structure above.
Load combination is the process of combining different types of loads (e.g. dead load, live load, wind load) to ass
I appeared for an interview before Jan 2024.
I applied via Company Website and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Company Website and was interviewed before Apr 2023. There was 1 interview round.
Types of wires include solid, stranded, and braided wires. Colors of wires vary depending on their purpose and industry standards.
Types of wires: solid, stranded, braided
Colors of wires vary by industry standards
Common wire colors: black, red, blue, green, white, yellow
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
Line balancing is the process of evenly distributing workload among workstations in a production line to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity
It involves assigning tasks to workstations based on their processing times
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Assembly balancing is the process of optimizing the work distribution among different workstations to improve efficiency and productivity.
Assembly balancing involves assigning tasks to different workstations in a way that minimizes idle time and maximizes throughput.
It helps in achieving a smooth flow of work and prevents bottlenecks in the production process.
Factors considered in assembly balancing include task time, ...
Cycle time is the total time it takes to complete a process, while tact time is the time it takes to produce one unit.
Cycle time includes all the time spent on a process, including wait time and processing time.
Tact time is the rate at which a product must be produced to meet customer demand.
For example, if a process takes 10 minutes to complete and the customer demand is 100 units per hour, the tact time would be 0.6 ...
Production is the process of creating goods or services, while quality refers to the standard of those goods or services.
Production involves the manufacturing or creation of goods or services.
Quality refers to the standard or level of excellence of those goods or services.
Production and quality are closely linked as the goal is to produce high-quality products efficiently.
Examples: In a manufacturing plant, production ...
OLE stands for Overall Equipment Effectiveness and OEE stands for Overall Labor Effectiveness.
OLE measures the overall performance of equipment in a manufacturing plant.
OEE measures the overall performance of labor in a manufacturing plant.
Both metrics are used to identify areas for improvement and optimize efficiency.
Example: OLE can help identify equipment downtime and OEE can help identify labor productivity issues.
posted on 21 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
It was basic level coding question. you can answer if you strong in basic level of java
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Executive
178
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Assistant Manager
168
salaries
| ₹2.1 L/yr - ₹7 L/yr |
Senior HR Executive
120
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
HR Executive
96
salaries
| ₹1 L/yr - ₹4 L/yr |
Facility Executive
69
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Coca-Cola Company
Dhoot Transmission
Apotex Research
Athena BPO