Filter interviews by
I applied via LinkedIn and was interviewed in Oct 2023. There were 3 interview rounds.
Branch and general awareness related
I applied via Campus Placement and was interviewed before Apr 2023. There were 3 interview rounds.
Basic Technical Questions
I applied via Campus Placement and was interviewed before Apr 2021. There were 2 interview rounds.
Basic quantative aptitude questions
Daikin interview questions for designations
Top trending discussions
I applied via Campus Placement and was interviewed before Dec 2019. There were 6 interview rounds.
I appeared for an interview before Aug 2021.
General Aptitude - Generic questions
I applied via Campus Placement and was interviewed before May 2021. There were 3 interview rounds.
Aptitude/Technical test are combine and simple easy to crack.
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
To manage production assembly line, one needs to focus on optimizing workflow, ensuring quality control, and maintaining equipment.
Create a detailed plan for the assembly line process
Ensure all equipment is functioning properly and maintained regularly
Implement quality control measures to catch defects early
Train and manage staff to ensure efficient workflow
Continuously monitor and analyze production data to identify a
The layout of assembly process involves arranging the workstations and equipment in a logical sequence to optimize efficiency.
Identify the sequence of operations required to assemble the product
Arrange the workstations and equipment in a logical order to minimize movement and transportation
Ensure that the layout allows for easy access to tools and materials
Consider the ergonomics of the workstations to minimize worker ...
CTQ refers to Critical to Quality while CTP refers to Critical to Process.
CTQ is a customer-focused metric that measures the quality of a product or service.
CTP is a process-focused metric that measures the critical steps in a process that affect the quality of the final product.
CTQ is used to identify customer requirements and ensure they are met.
CTP is used to identify critical process steps and ensure they are contr...
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Production planning, manpower handling, machine toolset
Some of the top questions asked at the Daikin Diploma Trainee Engineer interview for freshers -
The duration of Daikin Diploma Trainee Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 3 interviews
2 Interview rounds
based on 64 reviews
Rating in categories
Junior Engineer
943
salaries
| ₹2.4 L/yr - ₹4.7 L/yr |
Assistant Engineer
341
salaries
| ₹3 L/yr - ₹7 L/yr |
Diploma Trainee Engineer
226
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Engineer
220
salaries
| ₹3 L/yr - ₹8.7 L/yr |
Assistant Manager
185
salaries
| ₹7 L/yr - ₹18.6 L/yr |
Dell
HARMAN
Vivo
OPPO