I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. About your past experiences

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Civil engineering sewage project
  • Q2. Civil engineering
Round 2 - Technical 

(2 Questions)

  • Q1. Excavation engineering sewage project
  • Q2. Civil engineering 6 year sewage project
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(2 Questions)

  • Q1. Site work related like foundation
  • Q2. Eraction and stringing
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

The goal of an aptitude test is to predict the ability to learn new skills

Round 2 - Technical 

(2 Questions)

  • Q1. What experience do you have that relates to this job role
  • Q2. Tell me about your final year projects

Interview Preparation Tips

Interview preparation tips for other job seekers - Send follow up mails
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Why do a slump test
  • Ans. 

    To determine the workability of concrete mix

    • To ensure the concrete mix has the desired consistency for proper placement and compaction

    • To assess the water content in the concrete mix

    • To check the quality of the concrete mix and its ability to flow and settle

    • To prevent issues such as segregation and bleeding in the concrete mix

    • To meet the specifications and requirements of the project

    • Example: If the slump test result show...

  • Answered by AI
  • Q2. What should be the minimum slump of concrete
  • Ans. 

    The minimum slump of concrete should be 25 mm according to standards.

    • The minimum slump of concrete is typically specified by standards such as ASTM or ACI.

    • A slump test is conducted to measure the consistency of concrete, with a minimum value of 25 mm usually required.

    • A higher slump value indicates a more workable concrete mix, while a lower value may result in difficulties during placement and compaction.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?
Round 2 - Technical 

(1 Question)

  • Q1. Current job responsibilities?
Round 3 - Final decision for acceptance 

(1 Question)

  • Q1. Is the job is suitable for you or not?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and passionate
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Civil engineering releted
  • Q2. Qc,Bbs releted, site excursions
  • Q3. Who many types of cement?
  • Ans. 

    There are several types of cement used in construction.

    • Ordinary Portland Cement (OPC)

    • Portland Pozzolana Cement (PPC)

    • White Cement

    • Rapid Hardening Cement

    • Low Heat Cement

    • Sulfate Resistant Cement

    • Blast Furnace Slag Cement

    • High Alumina Cement

    • Oil Well Cement

  • Answered by AI
  • Q4. Who type of qurring ?
  • Ans. 

    The question is unclear and does not make sense.

    • The question seems to be incomplete or misspelled.

    • It is difficult to understand what is being asked.

    • There is no context provided for the term 'qurring'.

  • Answered by AI
Round 3 - Group Discussion 

Good experience and good coloured

Round 4 - Assignment 

Beam bbs calculation.

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Reason for leaving current company
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Desire for career advancement

    • Looking for new challenges

    • Seeking better work-life balance

    • Company restructuring or downsizing

    • Relocation to a new area

  • Answered by AI
  • Q2. Current job location
  • Ans. 

    Currently working in a construction company in downtown Los Angeles.

    • Working in downtown Los Angeles

    • Construction company

    • Civil engineering job

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is Tension
  • Ans. 

    Tension is a force that pulls or stretches an object.

    • Tension is a type of mechanical stress that occurs when an object is pulled or stretched.

    • It is a force that acts in the opposite direction of compression.

    • Tension is commonly seen in structures like bridges and cables.

    • Examples of tension include a rope being pulled taut or a rubber band being stretched.

  • Answered by AI
  • Q2. What is compression
  • Ans. 

    Compression is the action of applying pressure to reduce the size or volume of an object or material.

    • Compression is a force that squeezes or presses an object or material together.

    • It is commonly used in civil engineering to test the strength of materials like concrete or soil.

    • Compression can cause materials to deform or break if the force applied is too great.

    • Examples of compression include the weight of a building pre...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. OHT DETAILS PIPELINE HAND OVER SCHEME FHTC
  • Ans. 

    OHT details refer to overhead tank details, pipeline refers to the network of pipes, hand over scheme is the process of transferring responsibility, FHTC stands for Functional Household Tap Connection.

    • OHT details include capacity, location, and maintenance schedule.

    • Pipeline refers to the network of pipes used for transporting fluids such as water or gas.

    • Hand over scheme involves transferring responsibility for a projec...

  • Answered by AI

DAEWOO E&C Interview FAQs

How many rounds are there in DAEWOO E&C Civil Engineer interview?
DAEWOO E&C interview process usually has 1 rounds. The most common rounds in the DAEWOO E&C interview process are Technical.

Tell us how to improve this page.

DAEWOO E&C Civil Engineer Interview Process

based on 3 interviews

Interview experience

4.3
  
Good
View more
DAEWOO E&C Civil Engineer Salary
based on 7 salaries
₹2 L/yr - ₹7.3 L/yr
5% more than the average Civil Engineer Salary in India
View more details

DAEWOO E&C Civil Engineer Reviews and Ratings

based on 4 reviews

3.3/5

Rating in categories

3.2

Skill development

2.5

Work-life balance

3.5

Salary

3.9

Job security

2.6

Company culture

2.4

Promotions

3.0

Work satisfaction

Explore 4 Reviews and Ratings
Civil Engineer
7 salaries
unlock blur

₹2 L/yr - ₹7.3 L/yr

Instrument Engineer
5 salaries
unlock blur

₹16.1 L/yr - ₹18 L/yr

Civil Foreman
5 salaries
unlock blur

₹4.6 L/yr - ₹4.9 L/yr

Piping Engineer
4 salaries
unlock blur

₹1.5 L/yr - ₹18.4 L/yr

Civil Supervisor
4 salaries
unlock blur

₹5.4 L/yr - ₹15 L/yr

Explore more salaries
Compare DAEWOO E&C with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview