Filter interviews by
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
Top trending discussions
posted on 2 Jan 2021
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
posted on 20 Jul 2024
Advanced reasoning and aptitude
Oops concepts from c++
posted on 1 Mar 2022
I applied via Naukri.com and was interviewed in Feb 2022. There was 1 interview round.
posted on 14 Jul 2022
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 2 interview rounds.
My stady releted aal questions
I was interviewed in Aug 2024.
HMP plant stands for Hexose Monophosphate (HMP) Shunt pathway plant, which is a metabolic pathway in plants.
HMP plant is a metabolic pathway in plants involved in the oxidation of glucose.
It is also known as the Pentose Phosphate Pathway (PPP) in animals.
The pathway produces NADPH and ribose-5-phosphate, which are important for various cellular processes.
HMP plant is crucial for the production of nucleotides and fatty
Material testing is the process of evaluating the properties of materials to ensure they meet quality standards.
Material testing involves analyzing physical, mechanical, and chemical properties of materials.
Common tests include tensile strength, hardness, impact resistance, and chemical composition analysis.
Testing methods can include destructive testing (e.g. breaking a sample) and non-destructive testing (e.g. ultras
Aptitue test include 180 Question 1 mark each. Apptitude-60
Civil-60
Transportation-60
The superpave parameter for binders is the Performance Grade (PG) of the binder.
Superpave is a mix design system for asphalt pavements.
Performance Grade (PG) is a binder classification system based on temperature susceptibility.
PG is determined by the high and low temperature properties of the binder.
For example, PG 64-22 means the binder is suitable for use in areas with maximum pavement temperature of 64°C and minimu
The amount of camber provided in BC road varies depending on the road classification and location.
Camber is the slope provided on the road surface to ensure proper drainage and prevent water accumulation.
The amount of camber provided is determined by the road classification, traffic volume, and location.
For example, a rural road may have a camber of 2-3% while an urban road may have a camber of 1-2%.
The Ministry of Tra...
I was interviewed in Aug 2024.
posted on 2 Jan 2021
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Construction Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior HR Executive
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrician
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Vision India Services
Creative Hands HR Consultancy
Gi Group
Hire Glocal