Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Consulting Engineers Group Team. If you also belong to the team, you can get access from here

Consulting Engineers Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Consulting Engineers Group Site Engineer Interview Questions, Process, and Tips for Experienced

Updated 15 Oct 2024

Top Consulting Engineers Group Site Engineer Interview Questions and Answers for Experienced

View all 11 questions

Consulting Engineers Group Site Engineer Interview Experiences for Experienced

6 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Execution of piling, standards concrete and RCC structure related questions

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 19 Jan 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Asking about my experience

Site Engineer Interview Questions Asked at Other Companies for Experienced

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimensio ... read more
Q2. What a term of Rolling margin on a steel?
Q3. Which type of pipe Line and it's standards following
Q4. design? 1.what is ASD in steel design? 2.what is special consider ... read more
Q5. What is the lapping zone of beam rebar at top and bottom...? Why ... read more

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 11 Jul 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Experience and Salary Releated Questions
Round 3 - Technical 

(3 Questions)

  • Q1. Pile Foundation Execution Process
  • Q2. Socketing Criteria For Piles in Hard Rock
  • Ans. 

    Socketing criteria for piles in hard rock involves determining the depth of socket required based on rock strength and load capacity.

    • Socketing depth should be at least 1-2 times the diameter of the pile for hard rock.

    • Rock strength should be assessed using methods like rock core testing or Schmidt hammer test.

    • Load capacity of the pile and expected loads should be considered when determining socketing criteria.

    • Socketing ...

  • Answered by AI
  • Q3. Other Experience Related Questions
Round 4 - Technical 

(2 Questions)

  • Q1. Difference between CHSL and Pile Integrity Test
  • Ans. 

    CHSL is used to determine the length of a pile while Pile Integrity Test is used to assess the integrity of a pile.

    • CHSL (Cross Hole Sonic Logging) is used to determine the length and integrity of a pile by sending ultrasonic waves between tubes installed in the pile.

    • Pile Integrity Test is used to assess the integrity of a pile by sending stress waves through the pile and analyzing the reflected waves to detect any defe...

  • Answered by AI
  • Q2. Plate Load Test

Interview Preparation Tips

Topics to prepare for Consulting Engineers Group Site Engineer interview:
  • Pile Foundation
  • Pile Load Test

Site Engineer Interview Questions & Answers

user image Bhavesh Arsud

posted on 15 Nov 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Grade of concrete which was used, IS codes, questions mostly related to current working project, all technical.
  • Q2. Process of stressing of I girder, grouting process
  • Ans. 

    Stressing of I girder involves pre-tensioning steel strands before grouting to ensure structural integrity.

    • Pre-tensioning steel strands to desired level of stress

    • Grouting process to fill voids and bond strands to girder

    • Monitoring stress levels during and after grouting

    • Ensuring proper curing of grout for strength

  • Answered by AI
  • Q3. Grade of steel used for structure
  • Ans. 

    The grade of steel used for structures depends on the specific requirements and design considerations.

    • The grade of steel is determined based on factors such as strength, ductility, weldability, and corrosion resistance.

    • Common grades of structural steel include ASTM A36, ASTM A572, and ASTM A992.

    • Higher grade steels are typically used for more demanding applications or in seismic zones.

    • The grade of steel may also vary de...

  • Answered by AI
  • Q4. How to check the quality of concrete
  • Ans. 

    Quality of concrete can be checked through various tests and inspections.

    • Perform slump test to check workability of concrete

    • Conduct compressive strength test to assess the strength of concrete

    • Check for air content to ensure proper mix design

    • Inspect for cracks, honeycombing, segregation, and other visual defects

    • Use non-destructive testing methods like ultrasonic pulse velocity testing

  • Answered by AI
  • Q5. What is the slump required & which type of admixture was used
  • Ans. 

    The slump required depends on the specific project requirements and the type of concrete being used. Admixtures are used to modify the properties of concrete.

    • Slump requirements vary based on project specifications and concrete mix design

    • Admixtures are used to improve workability, strength, durability, or other properties of concrete

    • Examples of admixtures include water reducers, accelerators, retarders, and air-entraini

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be easy & all the questions will be asked on your current job.

Consulting Engineers Group interview questions for designations

 Civil Site Engineer

 (5)

 HSE Engineer

 (1)

 Safety Engineer

 (1)

 Billing Engineer

 (1)

 Tunnel Engineer

 (1)

 Assistant Highway Engineer

 (1)

 Assistant Bridge Engineer

 (1)

 Junior Planning Engineer

 (1)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 13 Feb 2022

I applied via Approached by Company and was interviewed in Aug 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. How to prevent from Pile bent
  • Ans. 

    Pile bents can be prevented by proper design, installation, and maintenance.

    • Ensure proper soil investigation and design of pile foundation

    • Use high-quality materials for pile construction

    • Ensure proper installation techniques are followed

    • Regularly inspect and maintain the pile foundation

    • Consider using protective measures such as cathodic protection or coatings

    • Monitor the structure for any signs of distress or movement

  • Answered by AI
  • Q2. What is the clearance between girder and ground
  • Ans. 

    The clearance between girder and ground depends on the design and specifications of the bridge.

    • The clearance is determined by the height of the girder and the elevation of the ground.

    • It is important to ensure that the clearance is sufficient for any vehicles or pedestrians passing underneath the bridge.

    • The clearance may vary depending on the location and purpose of the bridge.

    • For example, a highway bridge may have a hi...

  • Answered by AI
  • Q3. Which pile you are using?
  • Ans. 

    We are using reinforced concrete piles for this project.

    • Reinforced concrete piles are commonly used for their strength and durability.

    • They are ideal for projects that require deep foundations or support for heavy structures.

    • Other types of piles include timber, steel, and composite piles.

    • The choice of pile depends on factors such as soil conditions, load requirements, and cost.

    • We have selected reinforced concrete piles ...

  • Answered by AI
  • Q4. What is reaction pile
  • Ans. 

    A reaction pile is a type of foundation pile used to resist horizontal loads.

    • It is installed at an angle to resist lateral forces.

    • It is commonly used in retaining walls and bridge abutments.

    • It can be made of steel, concrete, or timber.

    • It is designed to transfer the load to the surrounding soil or rock.

    • It is also known as a batter pile or inclined pile.

  • Answered by AI
  • Q5. How many types of pile
  • Ans. 

    There are several types of piles used in construction, including driven piles, bored piles, and screw piles.

    • Driven piles are hammered into the ground using a pile driver.

    • Bored piles are created by drilling a hole and filling it with concrete.

    • Screw piles are twisted into the ground using a hydraulic torque motor.

    • Other types of piles include sheet piles, composite piles, and helical piles.

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Share details of your previous job.
  • Q2. Why are you looking for a change?
  • Q3. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Who looking for job in ceg make sure your previous work knowledge is very good

Get interview-ready with Top Consulting Engineers Group Interview Questions

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 25 Feb 2022

I applied via Referral and was interviewed in Aug 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Tell me about yourself.
  • Q3. Share details of your previous job.
Round 3 - Technical 

(1 Question)

  • Q1. Basic civil engineer question which is generally used and follow at site.
Round 4 - Document varification 

(1 Question)

  • Q1. Send all our document to HR, like previous job, salary slip, experience certi

Interview Preparation Tips

Interview preparation tips for other job seekers - Believing in your self is the first secret to success, don't lose hope , be confident, and give your 100% ,

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Site related

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What a term of Rolling margin on a steel?
  • Ans. Rolling margin is a difference weight of steel actual weight and theoretical weight.
  • Answered by Arvind Devrani
  • Q2. Initial setting time of cement
  • Ans. 

    Initial setting time of cement is the time taken by cement to harden and attain a particular strength.

    • Initial setting time is determined by Vicat apparatus

    • It is the time taken for the cement to lose its plasticity and become hard

    • The standard initial setting time for ordinary Portland cement is 30 minutes

    • Factors affecting initial setting time include temperature, water-cement ratio, and type of cement

  • Answered by AI
  • Q3. Elongation % of steel fy 500
  • Ans. 

    The elongation % of steel fy 500 is approximately 12%.

    • Elongation % is the measure of ductility of a material.

    • It is the percentage increase in length of a material before it fractures under tension.

    • For steel fy 500, the elongation % is approximately 12%.

    • This means that the steel can stretch up to 12% of its original length before it breaks.

  • Answered by AI
  • Q4. How much bag of cement in 1 cubic meter
  • Ans. 

    The amount of cement required for 1 cubic meter varies depending on the concrete mix design.

    • The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.

    • The mix design specifies the ratio of cement to other materials like sand and aggregates.

    • For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.

    • It is important to accurately calculate ...

  • Answered by AI
  • Q5. How much density of material Steel Concrete Sand
  • Ans. 

    Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3

    • Density of steel is higher than that of concrete and sand

    • Density of concrete varies depending on the mix design

    • Density of sand can vary depending on the source and moisture content

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically sound interview, like sagging hogging loads moment shear, all about steel, concrete and formwork such as qty calculation and fixing procedures.

I appeared for an interview in Aug 2019.

Interview Questionnaire 

4 Questions

  • Q1. How many types of structure
  • Ans. 

    There are various types of structures, including buildings, bridges, dams, tunnels, and towers.

    • Structures can be classified based on their purpose, design, and materials used.

    • Buildings can be further classified into residential, commercial, and industrial structures.

    • Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.

    • Dams can be classified into gravity, arch, buttress, and embankment dams.

    • Tu...

  • Answered by AI
  • Q2. What is density
  • Ans. 

    Density is the measure of mass per unit volume of a substance.

    • It is a physical property of matter.

    • It is calculated by dividing the mass of a substance by its volume.

    • Units of density include kg/m³, g/cm³, and lb/ft³.

    • Density can be used to identify substances and determine their purity.

    • For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.

  • Answered by AI
  • Q3. How many types of density construction
  • Ans. 

    There are two types of density construction: compacted and loose.

    • Compacted density construction involves compressing the material to increase its density, such as in road construction.

    • Loose density construction involves leaving the material in its natural state, such as in landscaping.

    • The type of density construction used depends on the intended use of the material and the desired level of compaction.

    • Other factors that...

  • Answered by AI
  • Q4. Which types of tests construction joint
  • Ans. 

    Tests for construction joints include visual inspection, water tightness test, and load transfer test.

    • Visual inspection to check for proper joint alignment and sealant application

    • Water tightness test to ensure no water leakage through the joint

    • Load transfer test to verify the joint can handle the intended load

    • Other tests may include pull-out test, shear test, and compression test

    • Testing frequency and methods may vary d...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. What is the density of RCC structure
  • Ans. 

    The density of RCC structure typically ranges from 2200 to 2500 kg/m^3.

    • Density of RCC is influenced by the type and proportion of materials used.

    • Common density range for RCC is 2200 to 2500 kg/m^3.

    • Higher density indicates stronger and more durable RCC structure.

  • Answered by AI

Consulting Engineers Group Interview FAQs

How many rounds are there in Consulting Engineers Group Site Engineer interview for experienced candidates?
Consulting Engineers Group interview process for experienced candidates usually has 2-3 rounds. The most common rounds in the Consulting Engineers Group interview process for experienced candidates are Technical, Resume Shortlist and HR.
How to prepare for Consulting Engineers Group Site Engineer interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Consulting Engineers Group. The most common topics and skills that interviewers at Consulting Engineers Group expect are Site Engineering, Escalators, Lifts, Metro Rail and Civil Engineering.
What are the top questions asked in Consulting Engineers Group Site Engineer interview for experienced candidates?

Some of the top questions asked at the Consulting Engineers Group Site Engineer interview for experienced candidates -

  1. What is the clearance between girder and gro...read more
  2. What is the slump required & which type of admixture was u...read more
  3. How to prevent from Pile b...read more

Tell us how to improve this page.

Consulting Engineers Group Site Engineer Interview Process for Experienced

based on 4 interviews

1 Interview rounds

  • Resume Shortlist Round
View more
Consulting Engineers Group Site Engineer Salary
based on 129 salaries
₹2.1 L/yr - ₹8.4 L/yr
44% more than the average Site Engineer Salary in India
View more details

Consulting Engineers Group Site Engineer Reviews and Ratings

based on 35 reviews

4.0/5

Rating in categories

3.8

Skill development

4.1

Work-life balance

3.9

Salary

3.5

Job security

4.2

Company culture

3.5

Promotions

4.1

Work satisfaction

Explore 35 Reviews and Ratings
Site Engineer
129 salaries
unlock blur

₹2.1 L/yr - ₹8.4 L/yr

Civil Site Engineer
71 salaries
unlock blur

₹3 L/yr - ₹8.4 L/yr

Assistant Manager
62 salaries
unlock blur

₹4 L/yr - ₹11.5 L/yr

Section Engineer
37 salaries
unlock blur

₹9 L/yr - ₹22 L/yr

Quantity Surveyor
37 salaries
unlock blur

₹5.3 L/yr - ₹14.5 L/yr

Explore more salaries
Compare Consulting Engineers Group with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview