The number of bricks required per cubic meter varies depending on the size and type of brick used.
The number of bricks required per cubic meter can range from 400 to 700 depending on the size and type of brick.
For example, standard size bricks (190mm x 90mm x 90mm) typically require around 500 bricks per cubic meter.
Larger or smaller bricks will require more or fewer bricks per cubic meter respectively.
posted on 10 May 2024
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
Planning involves setting goals and determining the actions needed to achieve those goals. Different levels of plans include strategic, tactical, and operational plans.
Planning is the process of setting goals and determining the actions needed to achieve those goals.
Different levels of plans include strategic plans, which are long-term and set the overall direction of the organization.
Tactical plans are medium-term pla...
I applied via Referral and was interviewed in Jan 2022. There was 1 interview round.
Construction tolerance for NATM tunneling depends on various factors.
The type of rock or soil being excavated
The size and shape of the tunnel
The depth of the tunnel
The presence of water or other geological features
Typically, a tolerance of +/- 50mm is used for NATM tunneling
However, this can vary depending on the specific project and site conditions
NATM stands for New Austrian Tunneling Method, a principle of tunneling that involves excavation and support in a sequential manner.
Excavation and support are done in a sequential manner
The method is flexible and adaptable to different geological conditions
It involves the use of shotcrete and rock bolts for support
The principle was developed in Austria in the 1950s and has since been used worldwide
Examples of NATM tunn...
posted on 4 May 2024
I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.
posted on 29 Dec 2021
I applied via Naukri.com
Yes, I am able to prepare budgets.
I have experience in preparing budgets for various projects and departments.
I am proficient in using budgeting software and tools.
I have a strong understanding of financial statements and forecasting.
I am able to work closely with stakeholders to gather necessary information and make informed budget decisions.
Different manpowers have different outputs depending on their skills and expertise.
Output of a planning manager includes strategic plans and project timelines.
Output of a marketing manager includes marketing campaigns and sales strategies.
Output of a software developer includes code and software applications.
Output of a customer service representative includes customer satisfaction and issue resolution.
Output of a grap...
MIS reports should consider data accuracy, relevance, timeliness, and presentation.
Accuracy of data
Relevance of data to the report's purpose
Timeliness of data
Clear and concise presentation of data
Consistency in data formatting
Identification of trends and patterns in data
Comparison of current data with historical data
Inclusion of key performance indicators (KPIs)
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
I applied via LinkedIn and was interviewed in Jan 2022. There were 3 interview rounds.
Design Engineer
272
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Engineer 1
267
salaries
| ₹1.5 L/yr - ₹5.8 L/yr |
L2 Engineer
188
salaries
| ₹3.4 L/yr - ₹8 L/yr |
Osp Design Engineer
78
salaries
| ₹3.4 L/yr - ₹7.2 L/yr |
OSP Engineer
76
salaries
| ₹2.8 L/yr - ₹6.5 L/yr |
Sterlite Technologies
Larsen & Toubro Limited
Tata Communications
Bharti Airtel