i
Colliers India
Filter interviews by
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Top trending discussions
Production productivity setting involves optimizing processes to increase output efficiently.
Analyze current production processes to identify bottlenecks
Implement automation or technology to streamline operations
Train and develop staff to improve efficiency
Set clear goals and targets for production output
Regularly monitor and evaluate productivity metrics
I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.
The market rate of steel fluctuates based on supply and demand, global economic conditions, and trade policies.
Market rate of steel is influenced by factors such as supply and demand dynamics.
Global economic conditions, such as GDP growth and industrial output, impact steel prices.
Trade policies and tariffs can also affect the market rate of steel.
Steel prices can vary based on the type of steel (e.g. carbon steel, sta...
Yes, there are codes that need to be followed for BBS (Bar Bending Schedule) and steel cut lengths.
Codes such as IS 2502:1963 and IS 1786:2008 provide guidelines for BBS and steel cut lengths.
BBS includes details like bar mark, diameter, length, shape, and bending dimensions.
Steel cut lengths should be as per the required dimensions specified in the design drawings.
Following the codes ensures structural integrity and c
Rate for brickwork, formwork, and wardrobe dates are commonly used in construction projects to estimate costs.
Rate for brickwork is typically calculated per cubic meter (1cum)
Formwork is measured in square meters (sqm)
Wardrobe dates are measured in square feet (sft)
Rate analysis of Kota stone involves calculating the cost of materials, labor, and other expenses for a specific quantity of Kota stone work.
Calculate the cost of Kota stone per square foot or square meter.
Include the cost of transportation, labor, and other miscellaneous expenses.
Consider the wastage factor while calculating the total cost.
Compare the rates of different suppliers to get the best deal.
Use software or o
Rate analysis of granite involves calculating the cost of materials, labor, and equipment needed for a specific project.
Determine the quantity of granite required for the project
Calculate the cost of granite per unit
Estimate the cost of transportation, labor, and equipment
Factor in any additional costs such as taxes or overhead expenses
Compare quotes from different suppliers to get the best rate
To prepare the bbs, you need to marinate the meat, skewer it, and grill it to perfection.
Marinate the meat in a mixture of spices, yogurt, and lemon juice for at least 2 hours.
Skewer the marinated meat along with vegetables like bell peppers and onions.
Grill the skewers on a hot grill until the meat is cooked through and has a nice charred exterior.
Yes, I have knowledge of LISP commands in AutoCAD for QS works.
I have experience using LISP commands in AutoCAD for quantity surveying tasks.
I can create custom commands and automate repetitive tasks using LISP in AutoCAD.
For example, I have used LISP to generate reports, extract data, and streamline workflows in AutoCAD for QS projects.
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 5 interview rounds.
Discussion about carrier plan and goal
Planning for future management involves setting clear goals, developing strategies, and continuously evaluating and adjusting plans.
Set clear and achievable goals for the organization
Develop strategies to achieve these goals, including resource allocation and timeline
Regularly evaluate progress and adjust plans as needed
Consider potential challenges and risks in the future management plan
Involve key stakeholders in the
I applied via Referral and was interviewed before Nov 2022. There were 4 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2023. There were 2 interview rounds.
Seeking new challenges and growth opportunities
Current job lacks growth opportunities
Looking for a more challenging role
Interested in exploring new industries
Seeking better work-life balance
I applied via Referral and was interviewed before Oct 2023. There were 3 interview rounds.
Our company follows a structured process involving planning, execution, monitoring, and evaluation.
Planning phase involves setting objectives and creating a detailed project plan.
Execution phase involves implementing the plan and assigning tasks to team members.
Monitoring phase involves tracking progress, identifying issues, and making necessary adjustments.
Evaluation phase involves reviewing the project outcomes and i...
My grey areas include delegation, public speaking, and adapting to new technology.
Delegation - I sometimes struggle with letting go of tasks and trusting others to complete them effectively.
Public speaking - I am working on improving my confidence and delivery when speaking in front of large groups.
Adapting to new technology - I can be a bit resistant to change and may take longer to learn new software or systems.
My current CTC is $120,000 per year.
My current CTC is $120,000 per year
I am currently earning $10,000 per month
My total compensation package is $120,000 annually
My notice period is 3 months.
My notice period is currently 3 months.
I am required to give a 3-month notice before leaving my current position.
I will need to work for 3 more months before joining a new company.
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There was 1 interview round.
I applied via Referral and was interviewed before Nov 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There was 1 interview round.
based on 16 reviews
Rating in categories
Assistant Manager
233
salaries
| ₹3.8 L/yr - ₹12 L/yr |
Project Engineer
130
salaries
| ₹3 L/yr - ₹9 L/yr |
Project Manager
121
salaries
| ₹6 L/yr - ₹17.6 L/yr |
Assistant Project Manager
113
salaries
| ₹5.9 L/yr - ₹12.5 L/yr |
Manager
101
salaries
| ₹4.8 L/yr - ₹15.5 L/yr |
CBRE
JLL
Cushman & Wakefield
Knight Frank