I applied via Campus Placement and was interviewed before Dec 2023. There were 2 interview rounds.
Discuss the allocation of coal blocks and its relation to the per capita energy index.
I applied via Company Website and was interviewed before Jul 2021. There was 1 interview round.
Yes, Coal India is a state-owned coal mining company with operations in remote locations.
Coal India Limited is the largest coal-producing company in the world.
It has mines in remote locations such as Jharkhand, Chhattisgarh, and Odisha.
The company also has subsidiaries that operate in other countries such as Mozambique and South Africa.
Top trending discussions
If your knowledge is good then skip it but in 90% cases it's mandatory
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
I like good work and best productions of company.
I dislike the lack of communication and transparency within the company.
Lack of communication between departments
Unclear decision-making processes
Limited opportunities for feedback and suggestions
Inconsistent updates on company goals and changes
I have well knowle of computer..I retired from Indian Army as a rank of Subedar clerk . I obtained training of security ospects .
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There was 1 interview round.
GTG operation involves multiple generators working together to share the load and ensure continuous power supply.
GTG stands for Gas Turbine Generator
In GTG operation, multiple generators are synchronized to work together
Load sharing ensures that the power demand is distributed evenly among the generators
This helps in maintaining a stable power supply and prevents overloading of any single generator
I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.
Calculate rope diameter based on overhead crane capacity
Calculate the weight of the load the crane will be lifting
Determine the maximum load capacity of the crane
Use the formula: Rope diameter = (Load weight / (2 * Safe working load * Safety factor * π))^0.5
For example, if the load weight is 10 tons, safe working load is 5 tons, and safety factor is 2, the rope diameter would be calculated as: (10000 / (2 * 5 * 2 * 3.1
Centrifugal pump efficiency curves show the relationship between flow rate and efficiency of the pump.
Efficiency curves help in selecting the right pump for a specific application
They provide information on the pump's performance at different operating points
Efficiency curves typically have a peak efficiency point and a best efficiency point (BEP)
Understanding these curves can help in optimizing pump performance and en
The cost of solenoid valves and servos can vary depending on the brand, size, and quality.
Cost of solenoid valves can range from $10 to $1000+ depending on size and brand.
Servos can cost anywhere from $20 to $500+ depending on torque and brand.
Higher quality solenoid valves and servos may have a higher price tag.
Consider factors like durability, performance, and warranty when comparing costs.
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 3 interview rounds.
I was interviewed in Jun 2023.
Basic aptitude test related to number system.
based on 1 interview
Interview experience
based on 32 reviews
Rating in categories
Assistant Manager
192
salaries
| ₹8 L/yr - ₹24 L/yr |
Deputy Manager
122
salaries
| ₹10 L/yr - ₹32 L/yr |
Management Trainee
53
salaries
| ₹8.5 L/yr - ₹18 L/yr |
Assistant Manager Finance
34
salaries
| ₹10 L/yr - ₹20.5 L/yr |
Deputy Manager - Finance
34
salaries
| ₹13.2 L/yr - ₹28 L/yr |
Oil And Natural Gas Corporation
Steel Authority Of India
Bharat Petroleum
Hindustan Petroleum