Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by CNH Industrial Team. If you also belong to the team, you can get access from here

CNH Industrial Verified Tick

Compare button icon Compare button icon Compare
3.9

based on 759 Reviews

Filter interviews by

CNH Industrial Project Officer Interview Questions and Answers

Updated 5 Sep 2022

CNH Industrial Project Officer Interview Experiences

3 interviews found

I applied via Approached by Company and was interviewed in Dec 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Difference between petrol and diesel engine
  • Ans. 

    Petrol engines use spark ignition while diesel engines use compression ignition.

    • Petrol engines use a spark plug to ignite the fuel-air mixture while diesel engines compress the air to a high temperature and pressure to ignite the fuel.

    • Petrol engines are generally more fuel efficient at high speeds while diesel engines are more fuel efficient at low speeds.

    • Diesel engines produce more torque than petrol engines, making t...

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. 2 strike and 4 stroke engine

Interview Preparation Tips

Topics to prepare for CNH Industrial Project Officer interview:
  • Technical knowledge of tractor
Interview preparation tips for other job seekers - Minimum 2 years of experience in tractor industry , good knowledge of technical information like , what is cc etc.

I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Dms related system process

Interview Preparation Tips

Interview preparation tips for other job seekers - Sale and system process smoothly drive
Sop adhare on new dealerships

Project Officer Interview Questions Asked at Other Companies

asked in Tata Steel
Q1. Power Tester working and uses.
asked in Tata Steel
Q2. Overhead conductors and their different specifications
asked in Tata Steel
Q3. PCC and RCC grades and their classification.
Q4. What are the numerical schemes to solve differential equation?
Q5. How many cube filling as Is code IS 456 and removing shuttering d ... read more

Interview Questionnaire 

2 Questions

  • Q1. ABOUT MYSELF,WORKING PROCESS,PREVIOUS COMPNAY & ROLE
  • Q2. RESOONSIBILITIES & BUSINESS DOVELOP

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Project management and project planning

Round 2 - Technical 

(2 Questions)

  • Q1. Enterprise Resources planning
  • Q2. Manufacturing executives systems
Round 3 - HR 

(2 Questions)

  • Q1. Certificate verification
  • Q2. Salary negotiations
Round 4 - One-on-one 

(2 Questions)

  • Q1. Project management
  • Q2. Project ownership

Interview Preparation Tips

Interview preparation tips for other job seekers - A creative man is motivated by the desire to achieve not by the desire to beat others
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Where do you see yourself in 1 year
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How do you calculate takt time
  • Ans. 

    Takt time is calculated by dividing the available production time by the customer demand.

    • Calculate the total available production time in a specified period (e.g. 1 day)

    • Determine the customer demand for the same period

    • Divide the total available production time by the customer demand to get the takt time

    • Takt Time = Total Production Time / Customer Demand

  • Answered by AI
  • Q2. How do you do line balancing
  • Ans. 

    Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.

    • Identify the tasks required to complete a process

    • Determine the cycle time for each task

    • Assign tasks to workstations based on cycle time and workload

    • Ensure that workstations are balanced to avoid bottlenecks

    • Regularly review and adjust the line balancing to optimize efficiency

  • Answered by AI
  • Q3. How do you to capacity analaysis
  • Ans. 

    Capacity analysis involves evaluating the ability of a system or process to handle a certain amount of workload or demand.

    • Identify the key components of the system or process that contribute to its capacity

    • Collect data on the current workload or demand placed on the system

    • Use mathematical models or simulations to predict how the system will perform under different levels of workload

    • Consider factors such as resource ava...

  • Answered by AI
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. How many types of corner units we have and their sizes?
  • Ans. 

    There are three types of corner units: L-shaped, U-shaped, and diagonal. Sizes vary depending on the specific unit.

    • L-shaped corner units have two sides that meet at a right angle.

    • U-shaped corner units have three sides that meet at right angles.

    • Diagonal corner units are used to connect two non-adjacent sides at an angle.

    • Sizes can vary based on the specific unit and manufacturer.

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Why do you choose this company?
  • Ans. I want to work with the reputation company to learn, personally professionally. And i wanted to achive something wherever im working.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Never Give up, if not this... Why not this. Simple as that.

I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Schedule management Cost management Risk management Stakeholder management Challenges Communication
Round 3 - HR 

(2 Questions)

  • Q1. Strength and weakness
  • Q2. Why are you switching

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
PMP study material would help

I applied via Company Website and was interviewed before May 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Tell me about yourself and technical question related to project

Interview Preparation Tips

Interview preparation tips for other job seekers - it was good. Interviewers were supportive and very vigilant about the recruitment process

I applied via Company Website and was interviewed before Aug 2019. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is your past experience in particular lean manufacturing field?
  • Ans. 

    I have 3 years of experience in lean manufacturing, focusing on process improvement and waste reduction.

    • Implemented lean manufacturing principles to optimize production processes

    • Identified and eliminated non-value-added activities to improve efficiency

    • Led cross-functional teams to implement lean initiatives

    • Reduced lead times by 20% through the implementation of Kanban system

    • Implemented 5S methodology to improve workpla

  • Answered by AI
  • Q2. How to develop lean system in Shope floor area?
  • Ans. 

    Developing a lean system in the shop floor area involves identifying and eliminating waste to improve efficiency.

    • Identify the value stream and map out the current process

    • Identify and eliminate waste (muda) such as overproduction, waiting, defects, excess inventory, unnecessary motion, overprocessing, and unused talent

    • Implement a pull system to reduce inventory and improve flow

    • Standardize work processes and create a cul...

  • Answered by AI
  • Q3. What you know about KODAVARY system?
  • Ans. 

    I'm sorry, but I don't have any information about KODAVARY system.

    • N/A

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Make sure you are aware about each type of quality assurance systems.

CNH Industrial Interview FAQs

How many rounds are there in CNH Industrial Project Officer interview?
CNH Industrial interview process usually has 2 rounds. The most common rounds in the CNH Industrial interview process are Resume Shortlist, Assignment and Technical.
What are the top questions asked in CNH Industrial Project Officer interview?

Some of the top questions asked at the CNH Industrial Project Officer interview -

  1. Difference between petrol and diesel eng...read more
  2. 2 strike and 4 stroke eng...read more
  3. RESOONSIBILITIES & BUSINESS DOVE...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Motors Interview Questions
4.2
 • 979 Interviews
Bajaj Auto Interview Questions
3.9
 • 271 Interviews
Ashok Leyland Interview Questions
4.1
 • 229 Interviews
Ford Motor Interview Questions
4.4
 • 141 Interviews
Sonalika Tractors Interview Questions
3.7
 • 123 Interviews
Force Motors Interview Questions
3.5
 • 115 Interviews
View all
CNH Industrial Project Officer Salary
based on 26 salaries
₹2 L/yr - ₹6 L/yr
24% less than the average Project Officer Salary in India
View more details

CNH Industrial Project Officer Reviews and Ratings

based on 13 reviews

4.4/5

Rating in categories

4.1

Skill development

3.9

Work-Life balance

3.7

Salary & Benefits

3.2

Job Security

3.7

Company culture

3.7

Promotions/Appraisal

3.6

Work Satisfaction

Explore 13 Reviews and Ratings
Deputy Manager
113 salaries
unlock blur

₹10.9 L/yr - ₹20.1 L/yr

Manager
96 salaries
unlock blur

₹13 L/yr - ₹23 L/yr

Assistant Manager
91 salaries
unlock blur

₹7.5 L/yr - ₹16.2 L/yr

Design Engineer
70 salaries
unlock blur

₹4.8 L/yr - ₹17.3 L/yr

Senior Manager
50 salaries
unlock blur

₹17.9 L/yr - ₹31.4 L/yr

Explore more salaries
Compare CNH Industrial with

Mahindra & Mahindra

4.1
Compare

Tata Motors

4.2
Compare

Ashok Leyland

4.1
Compare

Escorts Kubota Limited

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview