I applied via Recruitment Consulltant and was interviewed before Dec 2020. There were 2 interview rounds.
The length of the harness rope should be sufficient to allow for movement and ensure safety.
The length of the harness rope should be long enough to provide adequate freedom of movement for the worker.
It should be short enough to prevent excessive slack or tangling.
The length may vary depending on the specific task and working conditions.
For example, in a construction site, a longer harness rope may be needed to allow w...
A hazard is a potential source of harm or danger that can cause injury, damage or harm to people, property or the environment.
Hazard can be physical, chemical, biological or psychological
Examples of hazards include fire, toxic chemicals, infectious diseases, and stress
Hazards can be identified through risk assessments and safety inspections
Preventive measures can be taken to eliminate or control hazards
Risk is the potential for harm or loss, while risk assessment is the process of evaluating and analyzing risks to determine their likelihood and impact.
Risk refers to the possibility of an event or action leading to negative consequences.
Risk assessment involves identifying hazards, evaluating their potential impact, and determining appropriate control measures.
It helps in prioritizing risks, implementing preventive me...
Hierarchy of control measures refers to a systematic approach to managing workplace hazards by prioritizing control methods.
Hierarchy of control measures is a framework used to minimize or eliminate workplace hazards.
The hierarchy consists of five levels: elimination, substitution, engineering controls, administrative controls, and personal protective equipment (PPE).
Elimination involves completely removing the hazard ...
A safety officer is responsible for ensuring the safety of employees and compliance with safety regulations.
Develop and implement safety policies and procedures
Conduct safety inspections and audits
Provide safety training to employees
Investigate accidents and incidents
Maintain safety records and reports
Collaborate with management to address safety concerns
Stay up-to-date with safety regulations and industry best practic
I applied via Company Website and was interviewed before Nov 2020. There was 1 interview round.
Top trending discussions
I was interviewed in Jan 2025.
posted on 22 Jan 2025
I was interviewed in Dec 2024.
posted on 8 Feb 2025
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.
Friction loss due to pipe roughness
Elevation change between inlet and outlet
Velocity head due to fluid velocity
Losses from fittings like elbows, tees, and valves
AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.
Filters - to remove dust and particles from the air
Coils - for heating or cooling the air
Fans - to circulate the air
Dampers - to control the flow of air
Humidifiers/dehumidifiers - to adjust the humidity levels
Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.
Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.
They are more energy efficient compared to other types of blowers.
Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.
Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.
Primary pump is the main pump in a system, while secondary pump is a backup pump.
Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.
Examples: In a heating system, the primary pump circulates hot water throug...
AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.
AHU valve connection is essential for regulating the flow of air in an air handling unit.
Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.
Properly connected valves ensure efficient operation of the AHU system.
Examples of AHU valves include damper val
Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.
Flow rate: Determine the required flow rate of chilled water in the system.
Pressure drop: Calculate the pressure drop to ensure efficient operation.
Material: Select appropriate pipe material based on temperature and pressure requirements.
Insulation: Insulate the pipes to prevent heat gain or loss.
System desi...
The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.
Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.
The connection may also include electrical wiring for power supply and control signals.
Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system
posted on 9 Feb 2025
I was interviewed in Aug 2024.
I applied via Naukri.com and was interviewed in Oct 2024. There were 3 interview rounds.
Was easy and able to complete within time
posted on 15 Dec 2024
I was interviewed in Nov 2024.
Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.
Managing project budgets effectively to avoid cost overruns
Dealing with unexpected site conditions such as soil instability or environmental hazards
Ensuring compliance with regulations and obtaining necessary permits
Balancing the needs of various stakeho...
posted on 25 Dec 2024
I applied via LinkedIn and was interviewed in Jun 2024. There were 3 interview rounds.
I am a dedicated and experienced Project Control Engineer with a strong background in managing project schedules, budgets, and resources.
Over 5 years of experience in project control and management
Proficient in using project management software such as Primavera P6 and Microsoft Project
Skilled in analyzing project data and providing accurate forecasts
Strong communication and teamwork skills, able to collaborate with cr...
Primavera is a project management software used for planning, scheduling, and controlling projects.
Primavera is commonly used in industries such as construction, engineering, and manufacturing.
It allows users to create project schedules, allocate resources, track progress, and analyze project performance.
Users can generate reports, monitor costs, and manage risks within the software.
Primavera offers features like Gantt...
Different types of relationships include familial, romantic, professional, and platonic relationships.
Familial relationships: relationships between family members such as parents, siblings, and children.
Romantic relationships: intimate relationships between partners or spouses.
Professional relationships: relationships between colleagues or business partners.
Platonic relationships: non-romantic relationships based on fr
A schedule can be created by identifying project tasks, estimating durations, sequencing tasks, assigning resources, and setting milestones.
Identify all project tasks and break them down into smaller, manageable activities.
Estimate the duration of each task based on historical data or expert judgment.
Sequence the tasks in the order they need to be completed, considering dependencies between tasks.
Assign resources to ea...
A look-ahead report is a document that outlines upcoming tasks, potential issues, and solutions for a project.
Provides a snapshot of upcoming project activities
Highlights potential roadblocks and proposed solutions
Helps project team anticipate and plan for future challenges
Usually covers a short-term period, such as the next week or month
Steps to create a look-ahead report
Identify the project milestones and deadlines
Review the project schedule and identify upcoming tasks
Analyze potential risks and delays
Update the look-ahead report with current progress and forecasted completion dates
Communicate the report to stakeholders for awareness and decision-making
The 14 points of the DCMA are guidelines for effective project management in defense contracts.
Establish clear project objectives and requirements
Develop a realistic project schedule
Assign responsibilities and authorities clearly
Ensure adequate resources are available
Maintain open communication with stakeholders
Identify and manage project risks
Monitor and control project performance
Implement corrective actions when nec...
Earned value management is a project management technique for measuring project performance and progress.
Compares actual work completed and costs incurred to planned work and costs
Helps in forecasting project outcomes based on current performance
Key metrics include Planned Value (PV), Earned Value (EV), and Actual Cost (AC)
Formula: EV = % of work completed * Total budget
Example: If a project is 50% complete and the tot...
Key performance indicators are measurable values that demonstrate how effectively a company is achieving key business objectives.
KPIs are specific, quantifiable metrics used to track progress towards organizational goals.
They help in evaluating the success of a project or business by measuring performance in key areas.
Examples of KPIs for a Project Control Engineer may include project completion time, budget variance,
Formulas used to calculate Budget at Completion (BAC) in project control engineering.
BAC = Planned Value (PV) at completion
BAC = Actual Cost (AC) + Estimate to Complete (ETC)
BAC = Budgeted Cost of Work Scheduled (BCWS) + Budgeted Cost of Work Remaining (BCWR)
In five years, I see myself as a senior project control engineer leading a team of professionals and successfully managing complex projects.
Continuing to enhance my project management skills through advanced training and certifications
Taking on more responsibilities and leadership roles within the organization
Successfully completing several high-profile projects and delivering exceptional results
Mentoring and guiding j...
My salary expectations are in line with industry standards for a Project Control Engineer with my level of experience and qualifications.
Research industry standards for Project Control Engineer salaries
Consider my level of experience and qualifications
Be prepared to negotiate based on the overall compensation package offered
I am flexible with working hours and can adapt to the needs of the project. I am willing to work overtime when necessary.
I am open to working flexible hours to accommodate project needs
I am willing to work overtime when required to meet project deadlines
I can adjust my schedule to align with team meetings or client requirements
based on 2 interviews
Interview experience
based on 70 reviews
Rating in categories
Civil Site Engineer
27
salaries
| ₹2.3 L/yr - ₹5 L/yr |
Site Engineer
15
salaries
| ₹2.2 L/yr - ₹5.1 L/yr |
Safety Officer
10
salaries
| ₹1.4 L/yr - ₹4.6 L/yr |
Store Keeper
10
salaries
| ₹2.2 L/yr - ₹3.2 L/yr |
Quantity Surveyor
8
salaries
| ₹2.5 L/yr - ₹6.6 L/yr |
Thermax Limited
Kirloskar Brothers
Voltas
Larsen & Toubro Limited