Filter interviews by
I applied via Walk-in and was interviewed in Nov 2021. There were 2 interview rounds.
I left my previous company to seek new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Looking for a company with a better work-life balance
Relocating to a different city or country
Unsatisfactory work environment or company culture
Lack of career advancement prospects
Company downsizing or restructuring
HR is asking some question to my friends by call
I was interviewed in Jan 2021.
PF challan can be generated online through the EPFO portal.
Log in to the EPFO portal using your credentials.
Go to the 'Payments' section and select 'Generate Challan'.
Enter the required details such as the month and year for which the challan is to be generated.
Verify the details and submit the challan.
Download and print the challan for payment at the bank.
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and needs
Communicate clearly and promptly
Provide timely solutions to their problems
Build a strong relationship based on trust and respect
Be proactive in anticipating their needs
Handle complaints and feedback with empathy and professionalism
China Construction Sausum interview questions for popular designations
Top trending discussions
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
posted on 19 Sep 2024
There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.
VG-10: Suitable for low-traffic roads
VG-20: Suitable for medium-traffic roads
VG-30: Suitable for high-traffic roads
VG-40: Suitable for heavy-duty traffic areas like airports and container terminals
The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.
Compressive strength of cement mortar cube is an important parameter to assess its quality and durability
The strength of cement mortar increases with age, so 3 days is an early testing point
Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa
based on 52 reviews
Rating in categories
Civil Site Engineer
13
salaries
| ₹3.6 L/yr - ₹7.3 L/yr |
Quality Engineer
11
salaries
| ₹2.8 L/yr - ₹5 L/yr |
Site Engineer
10
salaries
| ₹4.8 L/yr - ₹5.4 L/yr |
Electrical Engineer - MEP
5
salaries
| ₹5.5 L/yr - ₹6.4 L/yr |
Chinese Translator
5
salaries
| ₹6 L/yr - ₹10 L/yr |
Larsen & Toubro Limited
Tata Group
Adani Group
Reliance Industries