I applied via Referral and was interviewed in May 2021. There was 1 interview round.
Reduce cost of construction by optimizing design, materials, and labor.
Use cost-effective materials without compromising quality
Optimize design to minimize waste and maximize efficiency
Implement lean construction practices to reduce labor costs
Explore alternative construction methods such as modular construction
Negotiate with suppliers for better pricing
Invest in technology to improve productivity and reduce errors
The responsible person to issue the drawing fire hazards zone varies depending on the organization and the project.
In some organizations, it may be the responsibility of the safety department or the fire marshal.
In other cases, it may be the responsibility of the project manager or the architect.
The responsible person should have knowledge of fire safety codes and regulations.
They should also have a thorough understand...
I applied via Referral and was interviewed before May 2021. There was 1 interview round.
posted on 6 Jan 2018
Chemie Tech interview questions for popular designations
posted on 25 Oct 2017
I appeared for an interview before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
based on 3 interviews
Interview experience
based on 141 reviews
Rating in categories
Project Engineer
19
salaries
| ₹3.6 L/yr - ₹12.6 L/yr |
HR & Administration Executive
14
salaries
| ₹1.2 L/yr - ₹5.5 L/yr |
Senior Engineer
12
salaries
| ₹7.2 L/yr - ₹16.5 L/yr |
Graduate Engineer Trainee (Get)
10
salaries
| ₹3.6 L/yr - ₹4 L/yr |
Process Engineer
9
salaries
| ₹4.1 L/yr - ₹13.3 L/yr |
Thermax Limited
L&T Energy Hydrocarbon
Toyo Engineering
Tata Projects