I applied via Referral and was interviewed in May 2021. There was 1 interview round.
Reduce cost of construction by optimizing design, materials, and labor.
Use cost-effective materials without compromising quality
Optimize design to minimize waste and maximize efficiency
Implement lean construction practices to reduce labor costs
Explore alternative construction methods such as modular construction
Negotiate with suppliers for better pricing
Invest in technology to improve productivity and reduce errors
The responsible person to issue the drawing fire hazards zone varies depending on the organization and the project.
In some organizations, it may be the responsibility of the safety department or the fire marshal.
In other cases, it may be the responsibility of the project manager or the architect.
The responsible person should have knowledge of fire safety codes and regulations.
They should also have a thorough understand...
I applied via Approached by Company
I applied via Referral and was interviewed before May 2021. There was 1 interview round.
posted on 6 Jan 2018
Chemie Tech interview questions for popular designations
posted on 25 Oct 2017
I was interviewed before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
3 tests are conducted
DCS is used for continuous processes while PLC is used for discrete processes.
DCS stands for Distributed Control System and is used for continuous processes like oil refining, power generation, etc.
PLC stands for Programmable Logic Controller and is used for discrete processes like assembly lines, packaging machines, etc.
DCS is designed to handle large amounts of data from multiple sources and control multiple processe...
Control valves regulate fluid flow by adjusting the size of the valve opening.
Control valves are used in various industries such as oil and gas, chemical, and power generation.
They work by adjusting the size of the valve opening to regulate the flow of fluid.
The valve opening is controlled by a signal from a controller, which can be manual or automated.
Control valves can be classified into different types such as globe...
A pressure switch is a device that monitors pressure levels and triggers an action when a certain pressure is reached.
Pressure switch consists of a sensing element, switch mechanism, and a pressure port.
When the pressure reaches a certain level, the sensing element triggers the switch mechanism to open or close an electrical circuit.
Pressure switches are used in various applications such as HVAC systems, water pumps, a
I was interviewed in Jan 2017.
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Recent graduate with a degree in Computer Science
Passionate about coding and problem-solving
Strong communication and teamwork skills
I have been actively involved in sports since childhood, participating in various team sports and individual activities.
Played soccer for 10 years, competing at a regional level
Participated in track and field events in high school, specializing in long jump and hurdles
Currently enjoy hiking and rock climbing in my free time
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Aug 2021. There were 2 interview rounds.
Hi
based on 3 interviews
Interview experience
based on 141 reviews
Rating in categories
Project Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
HR & Administration Executive
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Engineer Trainee (Get)
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Thermax Limited
L&T Energy Hydrocarbon
Toyo Engineering
Tata Projects