Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
I was interviewed in Jul 2024.
posted on 16 Aug 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Waterproofing in a toilet room is essential to prevent water damage and maintain structural integrity.
Waterproofing materials such as membranes, sealants, and coatings are used to protect surfaces from water penetration.
Proper installation of waterproofing systems is crucial to ensure long-term effectiveness.
Regular maintenance and inspections are necessary to identify and address any issues with waterproofing.
Examples...
The weight of 1 meter length depends on the material being measured.
The weight of 1 meter length can vary depending on the material, such as steel, aluminum, wood, etc.
To calculate the weight, you need to know the density of the material.
For example, the weight of 1 meter length of steel would be different from 1 meter length of wood.
The number of bricks in 1m^3 depends on the size of the bricks being used.
The number of bricks in 1m^3 will vary based on the size of the bricks.
Calculate the volume of a single brick and then divide 1m^3 by that volume to get the number of bricks.
For example, if a brick is 0.2m x 0.1m x 0.05m, its volume would be 0.001m^3. Therefore, 1m^3 would contain 1000 bricks.
I applied via campus placement at Shri Vidyanikethan Engineering College, Tirupati and was interviewed in Dec 2023. There was 1 interview round.
Grades of concrete refer to the strength of the concrete mix design.
Grades of concrete are denoted by M10, M15, M20, etc. where M stands for mix and the number represents the compressive strength in N/mm^2.
Higher grade concrete has higher compressive strength and is used for structural purposes.
Common grades include M25, M30, M35, and M40 for heavy-duty structures like bridges and high-rise buildings.
Slump in concrete refers to the measure of consistency of freshly mixed concrete.
Slump is determined by the amount of water in the concrete mix.
It is measured by filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps.
Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability and strength of the concrete mix.
Slump test is comm...
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete mix and its intended use.
For example, a water cement ratio of 0.5 is commonly used ...
M20 grade concrete is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate, with a compressive strength of 20 MPa.
M20 grade concrete is commonly used in residential construction.
It is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate.
The compressive strength of M20 grade concrete is 20 MPa.
It is suitable for foundations, beams, columns, and slabs.
posted on 10 Jul 2024
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed in Sep 2022. There were 3 interview rounds.
I am a Site Engineer with expertise in cement density, brick size, and concrete grade.
I have extensive knowledge of different types of cement and their densities.
I am familiar with various brick sizes and their applications in construction.
I have experience working with different concrete grades for different structural requirements.
I can provide recommendations on the appropriate cement density, brick size, and concre
I am a dedicated and experienced Site Engineer with a strong background in construction and project management.
Bachelor's degree in Civil Engineering
5 years of experience in managing construction projects
Proficient in using construction software and tools
Strong problem-solving and decision-making skills
Excellent communication and leadership abilities
Completed successful projects such as building a commercial complex an
My family background is diverse and has influenced my values and work ethic.
My parents are both engineers, which inspired me to pursue a career in engineering.
I come from a close-knit family that values education and hard work.
My grandparents were farmers, teaching me the importance of perseverance and adaptability.
I have a sibling who is a doctor, which has given me insights into the medical field.
My family has always...
Aptitude test like mathematics question ,reasoning & our department like mechanical engineer
based on 1 interview
Interview experience
Assistant Manager
5
salaries
| ₹4.9 L/yr - ₹7.1 L/yr |
Senior Manager
5
salaries
| ₹6 L/yr - ₹12 L/yr |
Administration Manager
5
salaries
| ₹6.2 L/yr - ₹7.5 L/yr |
Cheif Financial Officer
4
salaries
| ₹55 L/yr - ₹93 L/yr |
CRM Executive
4
salaries
| ₹1 L/yr - ₹6 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company