Godrej Properties Site Engineer Mechanical Interview Questions and Answers

Updated 10 Jul 2024

Godrej Properties Site Engineer Mechanical Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Mep engeneering
  • Q2. Plumbing drawing

Interview Preparation Tips

Interview preparation tips for other job seekers - One by one round

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Conduct the offline test

Round 2 - Technical 

(8 Questions)

  • Q1. Density of steel, cement, concrete, sand, aggregates.
  • Ans. 

    Density of common construction materials

    • Steel: 7850 kg/m^3

    • Cement: 1440 kg/m^3

    • Concrete: 2400 kg/m^3

    • Sand: 1600-1700 kg/m^3

    • Aggregates: 1500-1750 kg/m^3

  • Answered by AI
  • Q2. How to find triangle concrete quantity.
  • Ans. 

    Triangle concrete quantity can be found using the formula: 1/2 * base * height * thickness.

    • Calculate the area of the triangle using the formula: 1/2 * base * height.

    • Multiply the area by the thickness to get the concrete quantity.

    • For example, if the base of the triangle is 5 meters, height is 8 meters, and thickness is 0.2 meters, the concrete quantity would be: 1/2 * 5 * 8 * 0.2 = 4 cubic meters.

  • Answered by AI
  • Q3. How to find circular column concrete quantity.
  • Ans. 

    Circular column concrete quantity can be found using the formula: Volume = πr^2h

    • Calculate the area of the circular column using the formula A = πr^2

    • Measure the height of the column

    • Multiply the area by the height to get the volume of concrete needed

    • Consider any additional factors such as wastage or reinforcement bars

  • Answered by AI
  • Q4. As a site engineer what is your roles and responsibilities.
  • Q5. What is slump test why we do.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test is used to determine the workability of fresh concrete.

    • It involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the consistency of the concrete - a higher slump means a more workable mix.

    • Slump test helps in ensuring that the concrete mix ...

  • Answered by AI
  • Q6. Compressive strength of concrete after 14 & 28 days and also persentage of strength.
  • Ans. 

    Compressive strength of concrete is typically measured after 14 and 28 days to assess its strength development.

    • Compressive strength of concrete is usually measured in pounds per square inch (psi) or megapascals (MPa).

    • After 14 days, the average compressive strength of concrete is around 60-75% of its ultimate strength.

    • After 28 days, the concrete typically reaches about 90-95% of its ultimate strength.

    • The percentage of s...

  • Answered by AI
  • Q7. Mix ratios of concrete
  • Ans. 

    Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.

    • Mix ratios are typically expressed as a ratio of cement:sand:aggregate, such as 1:2:4.

    • The mix ratio will vary depending on the strength and durability requirements of the concrete.

    • Common mix ratios include 1:2:3 for low strength concrete and 1:1.5:3 for high strength concrete.

    • Water is also added to the mix to achieve t

  • Answered by AI
  • Q8. Building IS Codes
Round 3 - HR 

(2 Questions)

  • Q1. Family background, Expected salary, present salary, Notice period.
  • Q2. Why you choose shoba.

Interview Preparation Tips

Interview preparation tips for other job seekers - Trust your self. And be prepare.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Reason for job change
  • Ans. 

    Seeking new challenges and opportunities for growth in a dynamic work environment.

    • Desire for professional development and advancement

    • Looking for new challenges and learning opportunities

    • Seeking a more dynamic work environment

    • Interested in applying skills and knowledge to different projects

  • Answered by AI
  • Q2. Salary expected
  • Ans. 

    Negotiable based on industry standards and job responsibilities.

    • Salary expectations are based on industry standards and the responsibilities of the role.

    • Consider factors such as location, company size, and years of experience when determining salary expectations.

    • Research average salaries for Site Engineers in the specific industry and location to have a realistic expectation.

    • Be prepared to discuss salary expectations d...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself Cement density Brick size Concrete grade
  • Ans. 

    I am a Site Engineer with expertise in cement density, brick size, and concrete grade.

    • I have extensive knowledge of different types of cement and their densities.

    • I am familiar with various brick sizes and their applications in construction.

    • I have experience working with different concrete grades for different structural requirements.

    • I can provide recommendations on the appropriate cement density, brick size, and concre

  • Answered by AI
  • Q2. Soil density Concrete lap joint Slab Cover
Round 3 - HR 

(3 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a dedicated and experienced Site Engineer with a strong background in construction and project management.

    • Bachelor's degree in Civil Engineering

    • 5 years of experience in managing construction projects

    • Proficient in using construction software and tools

    • Strong problem-solving and decision-making skills

    • Excellent communication and leadership abilities

    • Completed successful projects such as building a commercial complex an

  • Answered by AI
  • Q2. Tell me about your family background
  • Ans. 

    My family background is diverse and has influenced my values and work ethic.

    • My parents are both engineers, which inspired me to pursue a career in engineering.

    • I come from a close-knit family that values education and hard work.

    • My grandparents were farmers, teaching me the importance of perseverance and adaptability.

    • I have a sibling who is a doctor, which has given me insights into the medical field.

    • My family has always...

  • Answered by AI
  • Q3. Education qualification

Interview Preparation Tips

Interview preparation tips for other job seekers - Dress well, confident , answer the questions confidently, don't nervous.

I applied via Company Website and was interviewed in Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Good skills sincer good job
Round 3 - Case Study 

Interview Preparation Tips

Interview preparation tips for other job seekers - Good working good had work in job

I applied via Referral and was interviewed in Sep 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. ,how to build high rise buildings
  • Ans. 

    High rise buildings require careful planning, design, and construction techniques.

    • Site selection and analysis

    • Structural design and analysis

    • Foundation design and construction

    • Use of high-strength materials

    • Installation of elevators and other building systems

    • Safety measures for workers and occupants

    • Quality control and testing

    • Regular maintenance and inspections

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I join this company finaly 😍😍
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is formwork and their types
  • Q2. Grades of concrete and steel
Round 2 - HR 

(2 Questions)

  • Q1. Are to ready to work in tight schedule like overnight from 8 am to 6pm
  • Q2. How many years you are work in this company

Interview Preparation Tips

Interview preparation tips for other job seekers - If u are going to attend interview for site engineer Mainly focus on
1. IS456:2000
2.form Work
3. Steel Bar bending schedule
4. Basic civil engineering related knowledge
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Previous work related questions. Type of project you handled?
Round 3 - Technical 

(3 Questions)

  • Q1. How to calculate concrete value of a trapezoidal foundation?
  • Ans. 

    To calculate the concrete value of a trapezoidal foundation, you need to determine the volume of concrete required.

    • Calculate the area of the trapezoidal foundation by using the formula: (a + b) * h / 2, where a and b are the lengths of the parallel sides and h is the height.

    • Multiply the area by the desired thickness of the foundation to get the volume of concrete required.

    • Consider any additional factors such as wastage...

  • Answered by AI
  • Q2. Expansion gap treatment?
  • Q3. Your role and responsibilities on your previous site?
  • Ans. 

    As a site engineer, my role and responsibilities on my previous site included overseeing construction activities, managing subcontractors, ensuring compliance with safety regulations, and resolving technical issues.

    • Overseeing construction activities and ensuring they are carried out according to plans and specifications

    • Managing subcontractors and coordinating their work schedules

    • Ensuring compliance with safety regulati...

  • Answered by AI
Round 4 - HR 

(2 Questions)

  • Q1. What is your current ctc?
  • Q2. What is your salary expectation?
  • Ans. 

    I would expect a salary that is competitive and reflective of my skills and experience as a Site Engineer.

    • I believe my salary expectation should align with industry standards for Site Engineers.

    • Considering my qualifications and expertise, I would expect a fair and reasonable compensation package.

    • I am open to discussing salary based on the specific responsibilities and scope of the role.

    • I value opportunities for growth ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, and answer correctly, don't tell lies.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Difference between one way slab and two slab ?
  • Ans. 

    One way slab is supported on two opposite sides while two way slab is supported on all four sides.

    • One way slab is designed to carry the load in one direction only

    • Two way slab is designed to carry the load in both directions

    • One way slab is economical for small spans and light loads

    • Two way slab is suitable for larger spans and heavy loads

    • One way slab requires less reinforcement compared to two way slab

  • Answered by AI
  • Q2. If the ratio of length and width of slab is 2 or then two . then its a two way slab .
  • Ans. 

    If the ratio of length and width of slab is 2 or more, then it's a two-way slab.

    • A two-way slab is supported by beams on all four sides.

    • The ratio of length and width determines the direction of the main reinforcement.

    • A one-way slab is supported by beams on two opposite sides only.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for DLF Site Engineer interview:
  • structure
Interview preparation tips for other job seekers - always be confident . you never know what is your employer seeking for .
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Shri Vidyanikethan Engineering College, Tirupati and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Tests for concrete and cement
  • Q2. Grades of concrete
  • Ans. 

    Grades of concrete refer to the strength of the concrete mix design.

    • Grades of concrete are denoted by M10, M15, M20, etc. where M stands for mix and the number represents the compressive strength in N/mm^2.

    • Higher grade concrete has higher compressive strength and is used for structural purposes.

    • Common grades include M25, M30, M35, and M40 for heavy-duty structures like bridges and high-rise buildings.

  • Answered by AI
  • Q3. What is slump in concrete
  • Ans. 

    Slump in concrete refers to the measure of consistency of freshly mixed concrete.

    • Slump is determined by the amount of water in the concrete mix.

    • It is measured by filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps.

    • Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability and strength of the concrete mix.

    • Slump test is comm...

  • Answered by AI
  • Q4. What is water cement ratio
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • Water cement ratio is a crucial factor in determining the strength and durability of concrete.

    • A lower water cement ratio results in stronger and more durable concrete.

    • The ideal water cement ratio varies depending on the type of concrete mix and its intended use.

    • For example, a water cement ratio of 0.5 is commonly used ...

  • Answered by AI
  • Q5. What is M20 grade concrete
  • Ans. 

    M20 grade concrete is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate, with a compressive strength of 20 MPa.

    • M20 grade concrete is commonly used in residential construction.

    • It is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate.

    • The compressive strength of M20 grade concrete is 20 MPa.

    • It is suitable for foundations, beams, columns, and slabs.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - gain practical knowlege

Godrej Properties Interview FAQs

How many rounds are there in Godrej Properties Site Engineer Mechanical interview?
Godrej Properties interview process usually has 1 rounds. The most common rounds in the Godrej Properties interview process are Technical.
What are the top questions asked in Godrej Properties Site Engineer Mechanical interview?

Some of the top questions asked at the Godrej Properties Site Engineer Mechanical interview -

  1. Mep engeneer...read more
  2. Plumbing draw...read more

Tell us how to improve this page.

Godrej Properties Site Engineer Mechanical Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
Lodha Group Interview Questions
4.0
 • 124 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Ashiana Housing Interview Questions
4.0
 • 29 Interviews
View all

Fast track your campus placements

View all
Assistant Manager
721 salaries
unlock blur

₹7.2 L/yr - ₹20 L/yr

Senior Executive
469 salaries
unlock blur

₹5.5 L/yr - ₹13.7 L/yr

Manager
192 salaries
unlock blur

₹9 L/yr - ₹30 L/yr

Sales Executive
122 salaries
unlock blur

₹2 L/yr - ₹9 L/yr

Executive
95 salaries
unlock blur

₹3 L/yr - ₹10 L/yr

Explore more salaries
Compare Godrej Properties with

DLF

3.9
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Brigade Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview