Commonly used weld symbols include fillet weld, groove weld, plug weld, spot weld, and seam weld.
Fillet weld symbol is a right-angled triangle
Groove weld symbol is a square or rectangle
Plug weld symbol is a small circle
Spot weld symbol is a small circle with a crosshair
Seam weld symbol is two parallel lines
Structural methodology involves analyzing, designing, and testing structures to ensure they meet safety and performance requirements.
Analyze the structural requirements and constraints of the project
Design the structure using appropriate materials and techniques
Perform simulations and tests to validate the design
Iterate on the design based on test results and feedback
Document the entire process for future reference
The workflow process for preparing erection drawings involves gathering project information, creating initial sketches, obtaining approvals, and finalizing detailed drawings.
Gather project information such as architectural plans, structural drawings, and specifications
Create initial sketches to visualize the design concept
Obtain approvals from clients, architects, and engineers before proceeding
Finalize detailed drawin...
I applied via Campus Placement and was interviewed in Aug 2023. There was 1 interview round.
Commonly used weld symbols include fillet weld, groove weld, plug weld, spot weld, and seam weld.
Fillet weld symbol is a right-angled triangle
Groove weld symbol is a square or rectangle
Plug weld symbol is a small circle
Spot weld symbol is a small circle with a crosshair
Seam weld symbol is two parallel lines
Structural methodology involves analyzing, designing, and testing structures to ensure they meet safety and performance requirements.
Analyze the structural requirements and constraints of the project
Design the structure using appropriate materials and techniques
Perform simulations and tests to validate the design
Iterate on the design based on test results and feedback
Document the entire process for future reference
The workflow process for preparing erection drawings involves gathering project information, creating initial sketches, obtaining approvals, and finalizing detailed drawings.
Gather project information such as architectural plans, structural drawings, and specifications
Create initial sketches to visualize the design concept
Obtain approvals from clients, architects, and engineers before proceeding
Finalize detailed drawin...
I applied via Campus Placement and was interviewed in Aug 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Apr 2023. There were 4 interview rounds.
Case study scenario questions
I was interviewed before Jul 2021.
Dyn11 is a vector group notation used in transformers to indicate the phase displacement between primary and secondary windings.
Dyn11 is a three-phase transformer with the primary winding connected in delta and the secondary winding connected in star with neutral grounded.
The phase displacement between primary and secondary windings is 330 degrees.
Dyn11 is commonly used in Europe and Asia for distribution transformers.
...
based on 2 reviews
Rating in categories
Purchase Engineer
12
salaries
| ₹1.6 L/yr - ₹3.2 L/yr |
Area Sales Manager
12
salaries
| ₹7 L/yr - ₹12 L/yr |
Territory Sales Manager
10
salaries
| ₹2.9 L/yr - ₹5 L/yr |
Deputy Manager
9
salaries
| ₹6.5 L/yr - ₹8.4 L/yr |
Engineer
8
salaries
| ₹2 L/yr - ₹3 L/yr |
Mahindra & Mahindra
Sonalika Tractors
Tractors and Farm Equipment
Escorts Kubota Limited