Testing is the process of evaluating a system or its components with the intent to find whether it satisfies the specified requirements.
Testing involves executing a system or application to identify bugs or defects.
It ensures that the software meets the quality standards and requirements.
Testing can be manual or automated, depending on the project requirements.
IS code refers to Indian Standards codes that provide guide...
posted on 26 Jul 2021
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via AmbitionBox and was interviewed in May 2024. There was 1 interview round.
CBR stands for Code Based Routing, a method used in software development for routing messages based on code logic.
CBR is a technique used in software development to route messages based on code logic
It involves writing code to determine how messages should be routed
CBR is commonly used in systems where routing decisions are complex and need to be dynamic
IS 2720 Part 8 is a standard for determining the water content of soil by oven drying method.
IS 2720 Part 8 is a standard method used in geotechnical engineering to determine the water content of soil samples.
The method involves weighing a soil sample, drying it in an oven, and then re-weighing to calculate the water content.
The water content is calculated as the difference in weight before and after drying, divided by...
posted on 26 Jul 2022
QA focuses on preventing defects while QC focuses on identifying and fixing defects.
QA is a process-oriented approach that ensures quality is built into the product from the beginning
QC is a product-oriented approach that involves testing and inspecting the product to identify defects
QA is proactive while QC is reactive
QA involves continuous improvement while QC involves finding and fixing defects
Examples of QA activit...
I chose the QC department because of my passion for ensuring quality and my attention to detail.
I have always been meticulous and detail-oriented, which are essential qualities for a QC engineer.
I enjoy the process of identifying and resolving quality issues to improve overall product performance.
I find satisfaction in ensuring that products meet or exceed customer expectations.
I believe that quality control plays a cr...
I investigate the root cause, propose corrective actions, and ensure implementation to prevent recurrence.
Identify the root cause of the NCR
Propose corrective actions to prevent recurrence
Ensure implementation of corrective actions
Document the NCR and corrective actions taken
Communicate with relevant stakeholders
Soil and concrete strength testing involves several steps including sample collection, preparation, and testing.
Collect soil and concrete samples from the site
Prepare the samples for testing by drying and crushing them
Perform compression tests on concrete samples to determine strength
Perform triaxial or unconfined compression tests on soil samples to determine strength
Record and analyze the test results to ensure compl
To convince a client representative on a critical situation, it is important to communicate effectively, provide evidence and solutions, and build trust.
Listen actively to the client representative's concerns and understand their perspective.
Clearly explain the critical situation, its impact, and potential risks.
Present evidence such as test results, data analysis, or documentation to support your claims.
Offer alternat...
posted on 25 Sep 2024
I applied via Referral and was interviewed before Sep 2023. There was 1 interview round.
Pile cut off length is the length at which a pile is cut to the required level.
Pile cut off length is determined based on the design requirements and site conditions.
It is important to ensure that the pile is cut off at the correct length to provide adequate support.
Factors such as soil conditions, load requirements, and construction specifications influence the pile cut off length.
Mix design procedure involves determining the proportions of ingredients to produce concrete with desired properties.
Determine the required strength and durability of the concrete
Select suitable materials based on availability and properties
Calculate the proportions of cement, aggregates, water, and admixtures
Perform trial mixes to optimize the mix design
Follow relevant standards and guidelines such as ACI, ASTM, or BS
posted on 22 Sep 2023
I applied via Naukri.com and was interviewed before Sep 2022. There were 3 interview rounds.
posted on 22 Oct 2021
No, code is not applicable for all material testing procedures.
Code is primarily used for software testing, not material testing.
Material testing procedures involve physical tests and measurements.
Examples of material testing procedures include tensile testing, hardness testing, and impact testing.
Various quality tests are conducted in construction labs to ensure the durability and safety of the structures.
Concrete compressive strength test
Aggregate impact value test
Water absorption test
Bitumen content test
Soil compaction test
The procedure for testing soil, concrete, and cement involves various steps and techniques.
Collect samples of soil, concrete, and cement from the site.
Perform tests to determine the properties and characteristics of the materials.
For soil testing, conduct tests such as moisture content, compaction, and permeability.
For concrete testing, perform tests like compressive strength, slump, and air content.
For cement testing,...
posted on 12 Apr 2023
I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Mar 2020. There were 3 interview rounds.
based on 2 reviews
Rating in categories
Senior Engineer
164
salaries
| ₹4 L/yr - ₹9.1 L/yr |
Assistant Manager
97
salaries
| ₹5.8 L/yr - ₹12 L/yr |
Civil Site Engineer
66
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Civil Engineer
57
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Junior Engineer
52
salaries
| ₹2 L/yr - ₹4 L/yr |
Larsen & Toubro Limited
Punj Lloyd
Simplex Infrastructures
Nagarjuna Construction Company