i
Cadeploy Engineering
Filter interviews by
posted on 19 Feb 2022
Top trending discussions
Mechanical engineers play a crucial role in building a sky-scraper by designing and implementing the mechanical systems.
Designing and implementing HVAC systems to regulate temperature and air quality
Designing and implementing plumbing systems for water supply and drainage
Designing and implementing elevator and escalator systems for vertical transportation
Designing and implementing fire protection systems to ensure safe...
posted on 27 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down
The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.
Lapping length is usually 60 times the diameter of the steel rod
For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm
Lapping is done to ensure continuity and strength in the reinforcement
In Oman, commonly used footings include spread footings, strip footings, and raft footings.
Spread footings are used for individual columns or walls and distribute the load over a larger area.
Strip footings are continuous footings that support a line of columns or walls.
Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.
In Oman, due to the sandy soil conditions, de...
To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.
Use concrete mix to fill in the broken areas and level the floor.
Apply epoxy resin to seal cracks and strengthen the floor.
Consider using self-leveling compound for a smooth and even surface.
Ensure proper preparation and cleaning of the floor before applying any material.
Consult with a structural engineer
Concrete setting times can vary depending on factors like temperature and mix design.
Concrete typically sets within 24-48 hours, but continues to harden over time.
Factors affecting setting time include temperature, humidity, and mix design.
For example, in hot weather, concrete may set faster, while in cold weather it may take longer.
Accelerators or retarders can be added to the mix to adjust setting times as needed.
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.
Temporary or permanent blinds can be used depending on the situation
Common types of blinds include spectacle blinds, paddle blinds, and bleed rings
Blinding is often used during maintenance or repair work to ensure safety
Blinding can also be used to prevent contamination during storage or transportation
Blinding can...
Before starting work in a refinery equipment, certain procedures must be followed.
Obtain a work permit
Perform a safety check of the equipment
Ensure proper personal protective equipment is worn
Verify that all valves are in the correct position
Confirm that the equipment is properly grounded
Check for any leaks or abnormal conditions
Communicate with other workers in the area
Follow all established procedures and protocols
I will follow the emergency response plan and evacuate the area immediately.
Activate the alarm system to alert others in the area
Put on personal protective equipment (PPE) including a respirator
Evacuate the area immediately and move to a safe location
Notify emergency services and follow the emergency response plan
Monitor the situation and wait for the all-clear signal before returning to the area
I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.
Start from the top and work your way down
Use appropriate tools and safety equipment
Follow proper procedures and guidelines
Ensure all bolts are properly labeled and accounted for
Inspect the gasket and replace if necessary
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Excavation soil mass can be calculated by determining the volume of the soil and its density.
Calculate the volume of the excavation area by multiplying the length, width, and depth of the area.
Determine the density of the soil being excavated.
Multiply the volume of the excavation area by the density of the soil to get the excavation soil mass.
For example, if the excavation area is 10m x 5m x 2m and the soil density is ...
posted on 12 Nov 2024
I applied via Recruitment Consulltant
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
Software or tool test
Associate Checker
44
salaries
| ₹2.5 L/yr - ₹7.1 L/yr |
Tekla Modeller
37
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Detailer Associate
31
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Associate Detail Engineer
31
salaries
| ₹2.6 L/yr - ₹7.5 L/yr |
Associate Modeler
25
salaries
| ₹3 L/yr - ₹10.5 L/yr |
McNally Bharat Engineering
Bahwan Engineering
ABCI Infrastructures
Eversendai