I applied via Walk-in and was interviewed before Oct 2021. There were 2 interview rounds.
Mechanical engineers play a crucial role in building a sky-scraper by designing and implementing the mechanical systems.
Designing and implementing HVAC systems to regulate temperature and air quality
Designing and implementing plumbing systems for water supply and drainage
Designing and implementing elevator and escalator systems for vertical transportation
Designing and implementing fire protection systems to ensure safe...
I applied via Approached by Company and was interviewed in Nov 2022. There were 2 interview rounds.
Expectations refer to the anticipated outcomes or results that are desired or required in a particular situation.
Expectations are the hopes, goals, or standards that individuals or organizations have for a specific outcome.
They can be explicit or implicit, and can vary depending on the context.
Examples of expectations in a design engineering role could include meeting project deadlines, delivering high-quality designs,...
I applied via Job Portal and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2024. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
The Soil Bearing Capacity of Adyar varies depending on the specific location and soil composition.
Soil bearing capacity is typically measured in terms of pressure per unit area that the soil can support without failure.
Factors affecting soil bearing capacity include soil type, moisture content, compaction, and depth.
For Adyar, the soil bearing capacity can range from 1000 to 5000 kN/m^2 depending on the specific locati
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 10 May 2022
I applied via Company Website and was interviewed in Apr 2022. There were 2 interview rounds.
Assignment used to determine a candidates cognitive personality
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
based on 2 reviews
Rating in categories
Associate Checker
44
salaries
| ₹2.5 L/yr - ₹7.1 L/yr |
Tekla Modeller
37
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Detailer Associate
31
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Associate Detail Engineer
31
salaries
| ₹2.6 L/yr - ₹7.5 L/yr |
Associate Modeler
25
salaries
| ₹3 L/yr - ₹10.5 L/yr |
McNally Bharat Engineering
Bahwan Engineering
ABCI Infrastructures
Eversendai