i
Cadeploy Engineering
Filter interviews by
I applied via Walk-in and was interviewed before Aug 2021. There were 3 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 10 May 2022
I applied via Company Website and was interviewed in Apr 2022. There were 2 interview rounds.
Assignment used to determine a candidates cognitive personality
posted on 14 Nov 2024
I applied via Campus Placement and was interviewed in Oct 2024. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Excavation soil mass can be calculated by determining the volume of the soil and its density.
Calculate the volume of the excavation area by multiplying the length, width, and depth of the area.
Determine the density of the soil being excavated.
Multiply the volume of the excavation area by the density of the soil to get the excavation soil mass.
For example, if the excavation area is 10m x 5m x 2m and the soil density is ...
posted on 28 Mar 2022
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.
Temporary or permanent blinds can be used depending on the situation
Common types of blinds include spectacle blinds, paddle blinds, and bleed rings
Blinding is often used during maintenance or repair work to ensure safety
Blinding can also be used to prevent contamination during storage or transportation
Blinding can...
Before starting work in a refinery equipment, certain procedures must be followed.
Obtain a work permit
Perform a safety check of the equipment
Ensure proper personal protective equipment is worn
Verify that all valves are in the correct position
Confirm that the equipment is properly grounded
Check for any leaks or abnormal conditions
Communicate with other workers in the area
Follow all established procedures and protocols
I will follow the emergency response plan and evacuate the area immediately.
Activate the alarm system to alert others in the area
Put on personal protective equipment (PPE) including a respirator
Evacuate the area immediately and move to a safe location
Notify emergency services and follow the emergency response plan
Monitor the situation and wait for the all-clear signal before returning to the area
I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.
Start from the top and work your way down
Use appropriate tools and safety equipment
Follow proper procedures and guidelines
Ensure all bolts are properly labeled and accounted for
Inspect the gasket and replace if necessary
Mechanical engineers play a crucial role in building a sky-scraper by designing and implementing the mechanical systems.
Designing and implementing HVAC systems to regulate temperature and air quality
Designing and implementing plumbing systems for water supply and drainage
Designing and implementing elevator and escalator systems for vertical transportation
Designing and implementing fire protection systems to ensure safe...
I applied via Referral and was interviewed before Sep 2019. There were 6 interview rounds.
based on 3 reviews
Rating in categories
Associate Checker
44
salaries
| ₹2.5 L/yr - ₹7.1 L/yr |
Tekla Modeller
37
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Detailer Associate
31
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Associate Detail Engineer
31
salaries
| ₹2.6 L/yr - ₹7.5 L/yr |
Associate Modeler
25
salaries
| ₹3 L/yr - ₹10.5 L/yr |
McNally Bharat Engineering
Bahwan Engineering
ABCI Infrastructures
Eversendai