Filter interviews by
I applied via Britannia and was interviewed in Apr 2024. There was 1 interview round.
PM activity stands for Preventive Maintenance activity, which involves scheduled inspections, repairs, and replacements to prevent equipment breakdowns.
Scheduled inspections to identify potential issues before they become major problems
Regular cleaning and lubrication of equipment to ensure optimal performance
Replacing worn out parts before they fail to prevent costly breakdowns
Calibrating equipment to maintain accurac...
A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers consist of two coils of wire, known as the primary and secondary coils.
The primary coil is connected to a power source, creating a magnetic field when current flows through it.
This magnetic field induces a voltage in the secondary coil, transferring energy from the primary to the second...
I applied via Referral and was interviewed in Jul 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2021. There were 2 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed before Dec 2019. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Erection and commissioning of a pneumatic compressor involves assembling the components, connecting the necessary piping, testing for functionality, and fine-tuning for optimal performance.
Assemble the components of the pneumatic compressor according to the manufacturer's instructions.
Connect the necessary piping for air intake, compression, and output.
Test the compressor for functionality by running it empty and check...
Blowdown of cooling tower can be calculated using cycles of concentration. Maintenance practices include regular cleaning, inspection, and water treatment. Cooling tower capacity can be calculated based on heat load and design parameters.
Calculate blowdown using cycles of concentration formula: Blowdown = Evaporation Loss / (Cycles of Concentration - 1)
Maintenance practices include regular cleaning of cooling tower fil...
RCM stands for Reliability Centered Maintenance, a proactive maintenance strategy focused on identifying and preventing equipment failures.
RCM is a systematic approach to maintenance planning that aims to optimize maintenance tasks to ensure equipment reliability.
It involves analyzing the functions and potential failure modes of equipment to determine the most effective maintenance strategies.
RCM prioritizes maintenanc...
Pumps can be classified based on their casings as follows: volute casing, axial split casing, and radial split casing.
Volute casing pumps have a spiral-shaped casing that gradually expands to the discharge outlet.
Axial split casing pumps have a casing split along the horizontal centerline of the pump.
Radial split casing pumps have a casing split along the vertical centerline of the pump.
Air compressor works by compressing air to increase its pressure and decrease its volume.
Air is drawn into the compressor through an intake valve.
The air is then compressed using a piston or rotating impeller.
Compressed air is stored in a tank or released directly for use.
Examples of air compressors include reciprocating, rotary screw, and centrifugal compressors.
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
SMPS stands for Switched Mode Power Supply. It is a type of power supply that uses switching devices to convert electrical power efficiently.
SMPS converts AC voltage to DC voltage through a series of switching components
It is more efficient than traditional linear power supplies
Commonly used in electronic devices like computers, TVs, and LED lights
Helps regulate voltage and current to provide stable power output
I applied via Job Portal and was interviewed before Mar 2023. There were 2 interview rounds.
Very good health products.
posted on 18 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 2 interview rounds.
I handle various types of packing machines in my role as a Senior Engineer- Maintenance.
Handling vertical form fill seal machines
Operating carton sealing machines
Maintaining shrink wrapping machines
Troubleshooting case packing machines
The film wastage target is set between 1.2% to 2% for maintenance purposes.
Film wastage targets are crucial for cost control and efficiency.
Regular monitoring and analysis of film wastage can help identify areas for improvement.
Implementing measures such as training, process optimization, and equipment maintenance can help reduce film wastage.
Examples of film wastage include unused film rolls, improper handling leading...
Bearing number 6205 2z refers to a sealed deep groove ball bearing.
6205 2z indicates a deep groove ball bearing with metal shields on both sides
The '2z' in the bearing number signifies the type of sealing, in this case metal shields
This type of bearing is commonly used in applications where protection from contaminants is required
posted on 15 Apr 2022
based on 5 interviews
Interview experience
based on 32 reviews
Rating in categories
Production Officer
504
salaries
| ₹1.6 L/yr - ₹10 L/yr |
Area Sales Executive
406
salaries
| ₹4 L/yr - ₹11.6 L/yr |
Senior Area Sales Executive
212
salaries
| ₹6 L/yr - ₹13.5 L/yr |
Maintenance Officer
175
salaries
| ₹2.4 L/yr - ₹11 L/yr |
HR Officer
170
salaries
| ₹2 L/yr - ₹7.6 L/yr |
Nestle
Parle Products
ITC
Hindustan Unilever