Bridge & Roof Co Assistant Construction Manager Interview Questions and Answers

Updated 3 Jan 2022

Bridge & Roof Co Assistant Construction Manager Interview Experiences

1 interview found

I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Questions related to Mechanical Vibrations, Boiler, Steady state equation & Moment of Inertia.
  • Q2. HR questions like future ambitions for higher studies , any Life event related to Planning and organizing ability.

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical Concept is important. Will go in depth upto understanding of the principle on practical basis. HR is just to check convincing ability on your weak points.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me how to work your last company.
  • Q2. Pipe laying procedure.
  • Ans. 

    Pipe laying procedure involves planning, excavation, laying the pipe, backfilling, and testing for leaks.

    • Plan the layout of the pipes based on the project requirements and specifications.

    • Excavate the trench to the required depth and width to accommodate the pipe.

    • Lay the pipes carefully in the trench, ensuring proper alignment and slope for efficient flow.

    • Backfill the trench with suitable material to provide support and...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - HR 

(2 Questions)

  • Q1. Can you provide your name, background, previous experience, and current location?
  • Q2. What are your qualifications, and how many projects have you completed?
Round 2 - Technical 

(4 Questions)

  • Q1. What is your current company, and what is your designation there?
  • Q2. How many projects have you completed from start to finish, and what were your responsibilities in those projects?
  • Q3. Can you outline the planning and scheduling of work from start to finish?
  • Q4. What was the minimum number of days for the Mivan shuttering slab cycle in your previous project?
Round 3 - HR 

(2 Questions)

  • Q1. What is the complete process for documentation and obtaining all original certificates?
  • Q2. What is your current salary, and what are your salary expectations from our company?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Civil execution related questions, like project completion time,productivity, uses of equipment and material, repeatation of materials, SCC concrete,
Round 3 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. Why u quit your present organisation
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General information related to your profile
Round 3 - Technical 

(2 Questions)

  • Q1. Total technical questions
  • Q2. Basic knowledge questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare your CV, according to your expertise. 95% interviewer asks questions related what you mentioned in your CV. Don't mention any unnecessary knowledge/training. Be honest and shortly express your experience and knowledge.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About work experience only
  • Q2. Work related target achievement

Interview Preparation Tips

Interview preparation tips for other job seekers - Concentrate on work experience & some codes of work..
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Genral aptitude, technical electrical questions, mathematics

Round 2 - One-on-one 

(2 Questions)

  • Q1. How power plant work
  • Ans. 

    Power plants generate electricity by converting mechanical energy into electrical energy through various processes.

    • Power plants use fuel (such as coal, natural gas, or nuclear material) to heat water and produce steam.

    • The steam drives a turbine connected to a generator, which produces electricity.

    • There are different types of power plants including coal-fired, natural gas, nuclear, hydroelectric, and renewable energy pl...

  • Answered by AI
  • Q2. Ohm s law, transformer parts and function

Interview Questionnaire 

4 Questions

  • Q1. What is your current role in present company
  • Q2. What you are looking at site.
  • Q3. Tell me briefly about pipeline work
  • Ans. 

    Pipeline work involves the construction, maintenance, and repair of pipelines used for transporting fluids or gases.

    • Pipeline work includes excavation, welding, coating, and testing of pipelines.

    • Construction of pipelines involves laying pipes, installing valves, and building pump stations.

    • Maintenance work includes inspecting pipelines for leaks, corrosion, and other damage.

    • Repair work involves fixing leaks, replacing da...

  • Answered by AI
  • Q4. How the pipes are welded
  • Ans. 

    Pipes are welded using various techniques such as arc welding, gas welding, and electric resistance welding.

    • Arc welding involves using an electric arc to melt the edges of the pipes and then joining them together.

    • Gas welding uses a flame produced by burning a mixture of fuel gas and oxygen to heat the pipes and create a molten pool for joining.

    • Electric resistance welding passes an electric current through the pipes, ge...

  • Answered by AI

I applied via Walk-in and was interviewed before Aug 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

Just Aptitude things

Round 2 - Technical 

(3 Questions)

  • Q1. What was your working area? I mean How big.
  • Ans. 

    My working area varied depending on the project, but typically ranged from 10,000 to 100,000 square feet.

    • My working area was determined by the size and scope of the construction project.

    • I have worked on projects ranging from small commercial buildings to large industrial facilities.

    • For example, one project I worked on was a 50,000 square foot warehouse.

    • Another project was a 100,000 square foot manufacturing plant.

    • I am ...

  • Answered by AI
  • Q2. What are the difficulties you faced?
  • Q3. In a Case, If 12mm dia rebar in your drawing and spacing is 150 mm. In case you are not having it at that time and you have to change it with 16 mm. what would be the spacing according 16 mm dia rebar?
  • Ans. 

    Spacing for 16mm dia rebar if 12mm dia rebar is not available.

    • Calculate the area of 12mm dia rebar and 16mm dia rebar.

    • Use the ratio of areas to find the spacing for 16mm dia rebar.

    • Spacing for 16mm dia rebar would be approximately 211 mm.

    • Ensure that the new spacing meets the required design standards.

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Why you want to switch?
  • Q2. Are you willing to relocate?
  • Q3. And salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - L&t is one of very big company in construction filed in india. Your working experiences will vary to one project to another. it all about project manager - How is your relation buildup with him?

I applied via Naukri.com and was interviewed in Oct 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Tell me about yourself including your experience
  • Q2. Types of structures constructed
  • Ans. 

    Various types of structures are constructed in construction industry.

    • Residential buildings such as apartments, villas, and houses

    • Commercial buildings such as offices, shopping malls, and hotels

    • Industrial buildings such as factories and warehouses

    • Infrastructure projects such as roads, bridges, and tunnels

    • Specialized structures such as sports stadiums, hospitals, and airports

  • Answered by AI
  • Q3. Regarding qty surveying
  • Q4. What type of safety measures you follow during the construction work
  • Ans. 

    We follow strict safety protocols to ensure the well-being of workers and prevent accidents.

    • We conduct regular safety meetings to discuss potential hazards and how to avoid them.

    • We provide personal protective equipment (PPE) such as hard hats, safety glasses, and gloves.

    • We implement fall protection measures such as guardrails, safety nets, and harnesses.

    • We ensure that all equipment and machinery are properly maintained...

  • Answered by AI
  • Q5. Capacity of WTP in which you have experience
  • Ans. 

    I have experience working with WTPs with capacities ranging from 5 MGD to 50 MGD.

    • Worked on a 5 MGD WTP project in my previous role

    • Managed construction of a 20 MGD WTP in my current role

    • Assisted in the design of a 50 MGD WTP during my internship

  • Answered by AI
  • Q6. Are you willing to work in PAN India

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive everything will be fine

Tell us how to improve this page.

Bridge & Roof Co Assistant Construction Manager Interview Process

based on 2 interviews

Interview experience

3.5
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 737 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
View all

Fast track your campus placements

View all
Bridge & Roof Co Assistant Construction Manager Salary
based on 23 salaries
₹8 L/yr - ₹16.9 L/yr
14% more than the average Assistant Construction Manager Salary in India
View more details

Bridge & Roof Co Assistant Construction Manager Reviews and Ratings

based on 10 reviews

2.1/5

Rating in categories

1.7

Skill development

1.3

Work-life balance

3.6

Salary

4.5

Job security

1.2

Company culture

2.0

Promotions

1.7

Work satisfaction

Explore 10 Reviews and Ratings
Civil Site Engineer
163 salaries
unlock blur

₹1.7 L/yr - ₹6.2 L/yr

Safety Officer
156 salaries
unlock blur

₹1.8 L/yr - ₹6.3 L/yr

Site Engineer
150 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Mechanical Engineer
91 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Piping Engineer
83 salaries
unlock blur

₹2.4 L/yr - ₹9 L/yr

Explore more salaries
Compare Bridge & Roof Co with

Simplex Infrastructures

3.3
Compare

GAMMON INDIA

3.8
Compare

Hindustan Construction Company

4.2
Compare

Larsen & Toubro Limited

4.0
Compare