Brick&Bolt Site Coordinator Interview Questions and Answers

Updated 22 Jan 2022

Brick&Bolt Site Coordinator Interview Experiences

1 interview found

Round 1 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. Tell me about yourself.
Round 2 - Technical 

(1 Question)

  • Q1. Regarding Civil Technical question
  • Ans. Need to focus on Concrete Technology, Building materials-
  • Answered by Mohan kumar K S

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay positive, be polite, Good Body language , speak loudly nd Be confidence.

Interview questions from similar companies

I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What are the things to check before casting a tower foundation?
  • Ans. 

    Before casting a tower foundation, several things need to be checked to ensure its stability and durability.

    • Check the soil condition and bearing capacity

    • Ensure proper reinforcement and formwork

    • Verify the dimensions and alignment of the foundation

    • Check for any obstructions or utilities in the excavation area

    • Ensure proper curing of the concrete

    • Verify compliance with local building codes and regulations

  • Answered by AI
  • Q2. How is trapezoidal foundation quantity calculated?
  • Ans. 

    Trapezoidal foundation quantity is calculated by finding the average width and multiplying it by the length and depth.

    • Measure the length and depth of the foundation

    • Measure the width at both ends and find the average width

    • Multiply the average width by the length and depth to get the volume

    • Calculate the quantity by multiplying the volume with the unit weight of concrete

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your answers even if you are not 100% sure about that. No one is judgi9 you by that one wrong answer but your confidence do make a difference.

I applied via Company Website and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

12 Questions

  • Q1. 1. Make a layout of combined cycle power plant with different structures and components.
  • Ans. 

    Layout of combined cycle power plant with different structures and components.

    • Combined cycle power plant consists of gas turbine, heat recovery steam generator, and steam turbine.

    • Gas turbine generates electricity by burning natural gas or oil.

    • Heat recovery steam generator recovers waste heat from gas turbine exhaust and generates steam.

    • Steam turbine generates additional electricity using the steam produced by heat reco...

  • Answered by AI
  • Q2. 2 How you design machine foundation for Gas turbine. which are the different types of machine foundations.
  • Ans. 

    Designing machine foundation for gas turbine involves several factors and types of foundations.

    • Factors to consider include soil type, turbine size and weight, seismic activity, and environmental conditions.

    • Types of foundations include block, pile, and raft foundations.

    • Block foundations are suitable for smaller turbines on stable soil.

    • Pile foundations are used for larger turbines or unstable soil.

    • Raft foundations are us...

  • Answered by AI
  • Q3. 3. How you do ductile detailing for beam , column and foundation . which are the IS code you use for ductile detailing.
  • Ans. 

    Ductile detailing for beam, column, and foundation involves following IS codes and ensuring proper reinforcement placement.

    • For beams, IS 13920 is followed and reinforcement is placed at the bottom of the beam.

    • For columns, IS 13920 and IS 456 are followed and reinforcement is placed in a spiral pattern.

    • For foundations, IS 13920 and IS 2911 are followed and reinforcement is placed in a specific pattern based on the type ...

  • Answered by AI
  • Q4. 4.what are the different type of pile foundation and how you design them .
  • Ans. 

    Pile foundations are used to transfer loads from structures to soil. Different types include driven piles, bored piles, and screw piles.

    • Driven piles are installed by hammering or vibrating them into the ground.

    • Bored piles are created by drilling a hole and then filling it with concrete and steel reinforcement.

    • Screw piles are twisted into the ground using a hydraulic motor.

    • Design considerations include soil type, load c...

  • Answered by AI
  • Q5. 5. How you design shear wall and how you detail it .
  • Ans. 

    Shear walls are designed to resist lateral forces. Detailing includes reinforcement placement and anchorage.

    • Design shear walls based on the building code requirements and structural analysis.

    • Select appropriate materials and thickness for the shear wall.

    • Detail the reinforcement placement and anchorage to ensure proper load transfer.

    • Provide adequate boundary elements and openings for ducts and pipes.

    • Consider seismic and ...

  • Answered by AI
  • Q6. 6. which are the different software you are using for structural analysis.
  • Ans. 

    I have experience with various software for structural analysis.

    • STAAD.Pro

    • SAP2000

    • ETABS

    • ANSYS

    • AutoCAD Structural Detailing

  • Answered by AI
  • Q7. 7. How you model raft foundation or shear wall in finet element method.
  • Ans. 

    To model raft foundation or shear wall in finite element method, one needs to follow certain steps.

    • First, create a 3D model of the foundation or wall using a CAD software.

    • Next, import the model into a finite element analysis software.

    • Define the material properties and boundary conditions.

    • Mesh the model to create finite elements.

    • Solve the model to obtain the stresses and displacements.

    • Finally, analyze the results and ma...

  • Answered by AI
  • Q8. 8. How you design water retaining structures. which is the IS code you use for water retaining structures. and what is the crack width for water retaining structures.
  • Ans. 

    Water retaining structures are designed as per IS code and crack width is limited to ensure safety.

    • Design of water retaining structures involves determining the loads, selecting materials, and ensuring stability.

    • IS 3370 is the code used for design of water retaining structures in India.

    • The crack width for water retaining structures is limited to 0.2 mm to ensure safety and prevent leakage.

    • Various types of water retaini...

  • Answered by AI
  • Q9. 9. Have you worked with international codes like American and British codes .
  • Ans. 

    Yes, I have worked with both American and British codes.

    • I have experience working with the International Building Code (IBC) which is based on American codes.

    • I have also worked with British Standards (BS) such as BS 5950 for structural steel design.

    • I am familiar with the differences between the two codes and can adapt accordingly.

  • Answered by AI
  • Q10. 10. What are the different load combination for RCC and Steal structures .
  • Ans. 

    Different load combinations for RCC and Steel structures.

    • Load combinations for RCC structures include dead load, live load, wind load, earthquake load, and temperature load.

    • Load combinations for Steel structures include dead load, live load, wind load, earthquake load, temperature load, and snow load.

    • Load combinations are determined based on the design codes and standards applicable to the project.

    • The load combinations...

  • Answered by AI
  • Q11. 11. Do you have exposure of site inspection and can you make progress and quality report .
  • Ans. 

    Yes, I have extensive experience in site inspections and creating progress and quality reports.

    • I have conducted site inspections for various projects in my previous roles.

    • I am proficient in creating detailed progress and quality reports based on my observations during site inspections.

    • I have also implemented corrective actions based on the findings of my inspections to ensure project success.

    • For example, in my previous...

  • Answered by AI
  • Q12. 12. Draw a bending moment and shear fonce diagram for portal frame with lateral force and UDL .
  • Ans. 

    To draw a bending moment and shear force diagram for a portal frame with lateral force and UDL.

    • Calculate the reactions at the supports

    • Determine the shear force and bending moment at each section

    • Plot the shear force and bending moment diagrams

    • Identify the maximum shear force and bending moment

    • Consider the sign conventions for shear force and bending moment

    • Use appropriate software or tools for accurate results

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - you should be perfect in design aspect and fundamentals, different codes and state of art software which you using.

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. How will you implement ISO systems, and how will you educate site engineers about quality improvements ..
  • Ans. 

    I will implement ISO systems by conducting a gap analysis, creating a plan, and providing training to site engineers.

    • Conduct a gap analysis to identify areas of improvement

    • Create a plan to implement ISO systems

    • Provide training to site engineers on ISO standards and quality improvements

    • Establish a system for monitoring and measuring quality performance

    • Encourage continuous improvement through regular audits and reviews

  • Answered by AI

I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

H2s, confined space hazard and precaution, what's different b/w pre commissioning & commissioning, PSV, SWL, STEL, What's is ur pervious experience eg. Flare erection, tank erection, pre commissioning & commissioning, 11kv crude substation.

Interview Preparation Tips

Topics to prepare for Nasser S. Al Hajri Corporation Safety Officer interview:
  • Nebosh igc
Interview preparation tips for other job seekers - Be prepare don't think i know some accurate questions they will ask, don't over confident best of luck.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - Assignment 

Objective types questions

Round 2 - One-on-one 

(2 Questions)

  • Q1. Safety management
  • Q2. Safety workplace
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Project management related questions
Round 2 - Technical 

(1 Question)

  • Q1. Project management
Round 3 - HR 

(1 Question)

  • Q1. General HR questions

I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me about yourself.
  • Q2. Share details of your previous job.
  • Q3. What are your salary expectations?
Round 3 - Technical 

(1 Question)

  • Q1. Why should provide cable (stress) in bridge
  • Ans. 

    Cable (stress) is provided in bridge to increase its load carrying capacity and improve its stability.

    • Cable (stress) helps to distribute the load of the bridge evenly.

    • It reduces the amount of material required for construction.

    • It also helps to improve the stability of the bridge.

    • Cable (stress) is commonly used in suspension bridges.

    • It allows for longer spans to be constructed without the need for additional support.

    • Cab...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please all questions answer say with confidently to interviewer .
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is the minimum time of concrete getting strength
  • Ans. 

    The minimum time for concrete to gain strength is typically 28 days.

    • Concrete typically gains strength over time, with significant strength achieved after 28 days.

    • Factors such as mix design, curing conditions, and environmental factors can affect the rate of strength gain.

    • Testing is often done at various intervals to monitor the strength development of concrete.

    • Early strength concrete mixes are available for projects re

  • Answered by AI

I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions related pipeline

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with your basic knowledge

Brick&Bolt Interview FAQs

How many rounds are there in Brick&Bolt Site Coordinator interview?
Brick&Bolt interview process usually has 2 rounds. The most common rounds in the Brick&Bolt interview process are HR and Technical.

Tell us how to improve this page.

Site Engineer
33 salaries
unlock blur

₹3 L/yr - ₹5.2 L/yr

Project Manager
32 salaries
unlock blur

₹4 L/yr - ₹7.5 L/yr

Sales Manager
27 salaries
unlock blur

₹6.5 L/yr - ₹12.6 L/yr

Technical Consultant
23 salaries
unlock blur

₹6 L/yr - ₹9 L/yr

Civil Site Engineer
20 salaries
unlock blur

₹2.4 L/yr - ₹5 L/yr

Explore more salaries
Compare Brick&Bolt with

Burns & McDonnell

4.3
Compare

Mahindra Susten

4.4
Compare

B.L. Kashyap & Sons

3.7
Compare

Navayuga Engineering Company

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview