i
Brick&Bolt
Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
Top trending discussions
I will implement ISO systems by conducting a gap analysis, creating a plan, and providing training to site engineers.
Conduct a gap analysis to identify areas of improvement
Create a plan to implement ISO systems
Provide training to site engineers on ISO standards and quality improvements
Establish a system for monitoring and measuring quality performance
Encourage continuous improvement through regular audits and reviews
I applied via LinkedIn and was interviewed in Oct 2021. There were 5 interview rounds.
The minimum time for concrete to gain strength is typically 28 days.
Concrete typically gains strength over time, with significant strength achieved after 28 days.
Factors such as mix design, curing conditions, and environmental factors can affect the rate of strength gain.
Testing is often done at various intervals to monitor the strength development of concrete.
Early strength concrete mixes are available for projects re
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
posted on 22 Feb 2022
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
ASME codes are widely used in the oil and gas industry to ensure safety and quality standards are met.
ASME B31.3 is the code for process piping in oil and gas facilities
ASME Section VIII is used for pressure vessels in oil and gas industry
ASME B31.4 is for liquid pipelines in oil and gas industry
posted on 10 Nov 2021
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Site Engineer
33
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Project Manager
32
salaries
| ₹4 L/yr - ₹7.5 L/yr |
Sales Manager
27
salaries
| ₹6.5 L/yr - ₹12.6 L/yr |
Technical Consultant
23
salaries
| ₹6 L/yr - ₹9 L/yr |
Civil Site Engineer
20
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Burns & McDonnell
Mahindra Susten
B.L. Kashyap & Sons
Navayuga Engineering Company