Filter interviews by
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
SDLC stands for Software Development Life Cycle. Test plan outlines the scope, approach, resources, and schedule of testing. Test strategy defines the testing approach for the entire project.
SDLC is a process used by software development teams to design, develop, and test high-quality software.
Test plan details the testing scope, objectives, resources, schedule, and approach for a specific project.
Test strategy defines...
SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software products.
SDLC is a structured process that consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables that must be completed before moving on to the next phase.
For...
Test strategy is high-level plan to achieve testing objectives, while test plan is detailed document outlining testing approach for a specific project.
Test strategy is created at the beginning of the project, while test plan is created after the test strategy.
Test strategy focuses on overall goals and objectives of testing, while test plan focuses on specific details like scope, resources, schedule, and risks.
Test stra...
Handle adhoc requests by prioritizing based on urgency, assessing impact on current workload, and communicating with stakeholders.
Prioritize adhoc requests based on urgency and impact on current workload
Assess resources and availability before committing to adhoc requests
Communicate with stakeholders to manage expectations and provide updates
Document adhoc requests and resolutions for future reference
Top trending discussions
My objective to join Infosys is to utilize my skills and experience in quality management to contribute to the company's success.
To apply my expertise in quality management to drive continuous improvement in processes and products at Infosys
To collaborate with cross-functional teams to ensure adherence to quality standards and regulatory requirements
To leverage data analysis and problem-solving skills to identify and a...
I applied via Recruitment Consulltant and was interviewed before Aug 2023. There were 2 interview rounds.
Implemented a quality improvement project using Six Sigma methodology and tools such as Fishbone diagram and Control charts.
Utilized Six Sigma methodology to identify and address quality issues
Created Fishbone diagram to analyze root causes of defects
Implemented Control charts to monitor process performance
Collaborated with cross-functional teams to implement process improvements
I applied via Naukri.com and was interviewed before Aug 2022. There were 2 interview rounds.
The Quality framework is a structured approach to managing and improving quality within an organization.
The Quality framework outlines the processes, procedures, and tools used to ensure products or services meet quality standards.
It includes quality planning, quality control, quality assurance, and continuous improvement.
Examples of Quality frameworks include Six Sigma, Total Quality Management (TQM), and ISO 9001.
The...
Quality monitoring process involves regular evaluation of products, services, or processes to ensure they meet established standards.
Regular evaluation of products, services, or processes
Comparison against established standards
Identification of areas for improvement
Feedback and coaching provided to employees
Data analysis to track trends and performance
The Seven QC tools are a set of basic statistical tools used for quality control and improvement in manufacturing processes.
Check sheet: Used to collect and analyze data in a systematic manner.
Histogram: A graphical representation of data distribution.
Pareto chart: Shows the frequency of defects or issues in descending order.
Cause-and-effect diagram (Ishikawa or fishbone diagram): Helps identify potential causes of a p...
I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Newspaper Ad and was interviewed in Aug 2024. There was 1 interview round.
My future goal is to become a certified Quality Engineer and lead a team of inspectors to ensure the highest quality standards are met.
Obtain certification as a Quality Engineer
Lead a team of inspectors
Ensure highest quality standards are met
Continuously improve processes and procedures
I expect a challenging work environment, opportunities for growth, and a supportive team.
Challenging work that allows me to utilize my skills and knowledge
Opportunities for professional development and advancement
A supportive team that values collaboration and communication
I applied via Referral
MW stands for molecular weight while UBR stands for ultimate bearing resistance.
MW is a measure of the average mass of molecules in a sample, while UBR is the maximum load a structure can withstand before failure.
MW is commonly used in chemistry to determine the size of molecules, while UBR is important in engineering for designing structures.
Examples: The MW of water is approximately 18 g/mol, while the UBR of a steel...
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
Related work and describe rule regulation many more activities
I applied via Referral and was interviewed in Mar 2023. There were 3 interview rounds.
based on 1 review
Rating in categories
QA Manager
3
salaries
| ₹20 L/yr - ₹20 L/yr |
TCS
Infosys
Wipro
HCLTech