Upload Button Icon Add office photos

Filter interviews by

JSW Bhushan Power & Steel Interview Questions, Process, and Tips

Updated 9 Apr 2025

Top JSW Bhushan Power & Steel Interview Questions and Answers

View all 59 questions

JSW Bhushan Power & Steel Interview Experiences

Popular Designations

60 interviews found

I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Erection sequence of a continuous casting plant and how many types of casters are there?
  • Ans. 

    The erection sequence of a continuous casting plant involves several steps. There are two types of casters: vertical and horizontal.

    • The first step is to install the foundation and anchor bolts.

    • Next, the columns and beams are erected.

    • After that, the equipment such as tundish, mold, and rollers are installed.

    • Finally, the electrical and hydraulic systems are connected.

    • There are two types of casters: vertical and horizonta...

  • Answered by AI
  • Q2. Utilities, gases and water quality and type required for casting shop.
  • Ans. 

    The casting shop requires utilities such as electricity, compressed air, natural gas, and water of specific quality and type.

    • Electricity is required for powering the equipment and lighting.

    • Compressed air is used for cleaning and operating pneumatic tools.

    • Natural gas is used for heating the furnaces.

    • Water of specific quality and type is required for cooling and cleaning purposes.

    • Water quality should be free from impurit...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to work, after taken over by JSW. On time salary.

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (12)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Group Discussion 

Work experience in which field

Round 2 - One-on-one 

(2 Questions)

  • Q1. Salary expected how much
  • Ans. 

    I am looking for a competitive salary based on my experience and qualifications.

    • I am open to discussing salary based on the responsibilities and expectations of the role.

    • I have researched industry standards for Site Supervisor salaries in this region.

    • I am looking for a salary that reflects my skills and contributions to the team.

    • I am flexible and willing to negotiate based on the overall compensation package offered.

  • Answered by AI
  • Q2. Nearest joining date possibility
  • Ans. 

    My nearest joining date possibility is within two weeks.

    • I am available to start within two weeks of receiving an offer.

    • I can provide specific dates once an offer is extended.

    • I am flexible and willing to adjust my start date if needed.

  • Answered by AI

Site Supervisor Interview Questions asked at other Companies

Q1. What are handover process to civil or facillities
View answer (4)

Jsp Developer Interview Questions & Answers

user image Giridhar Thadishetty

posted on 9 Apr 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. What are oops conecpts
  • Q2. Give a program and real time example'
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Boiler interlock.
Round 2 - One-on-one 

(1 Question)

  • Q1. Boiler tripping parameters.
  • Ans. 

    Boiler tripping parameters are specific conditions that cause a boiler to shut down automatically for safety reasons.

    • Boiler pressure exceeding safe limits

    • Low water level in the boiler

    • Flame failure or loss of ignition

    • High furnace temperature

    • Excessive steam temperature or pressure

  • Answered by AI

Power Plant Engineer Interview Questions asked at other Companies

Q1. Boiler cold start-up and shutdown process & types of emergencies in your experience, specific energy consumption, efficiency of boiler, coal size, GCV, What is 5S? How it is implemented in your company explain
View answer (1)

JSW Bhushan Power & Steel interview questions for popular designations

 Senior Engineer

 (4)

 Deputy General Manager Operations

 (4)

 Management Trainee

 (3)

 Engineer

 (3)

 Assistant Engineer

 (2)

 Electrical Engineer

 (2)

 Store Keeper

 (2)

 Site Supervisor

 (2)

Senior Foreman Interview Questions & Answers

user image Munna Singh

posted on 12 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(6 Questions)

  • Q1. Induction furnace eot crane
  • Ans. Induction furnace maintenance stand by crusible all general chaking
  • Answered by Munna Singh
  • Q2. Eot crane preventive maintenance shutdown work and all general chaking
  • Ans. Eot crane preventive maintenance Chaking oil level in thruster Chaking of wire rope condition Oil level in gear box Break setting chaking of wire rope lubrication Chaking gear coupling nut 🔩 bolt lt & ct main host rail & structure chaking proper house keeping wanted meterial all beating greasing Shutdown work planing Main host wire rope change .and rail and structure work
  • Answered Anonymously
  • Q3. Cooling tower maintenance and preventive maintenance shutdown work
  • Q4. Furnace coil cooling water pump preventive maintenance shutdown work
  • Ans. Chaking of unwanted noise and vibration Chaking bearing condition Chaking of shaft alignment and clearance Suction and discharge pressure Bearing lubrication level Corrosion and Dirt chaking
  • Answered by Munna Singh
  • Q5. Hydraulic power pack system maintenance
  • Q6. All main power work distribution
  • Ans. 

    Main power work distribution involves managing the distribution of electrical power throughout a construction site.

    • Coordinate with electricians to ensure proper installation and maintenance of power distribution systems

    • Monitor power usage and troubleshoot any issues that arise

    • Ensure compliance with safety regulations and protocols

    • Plan for future power needs and upgrades

    • Examples: overseeing the installation of temporary...

  • Answered by AI

Senior Foreman Interview Questions asked at other Companies

Q1. What is the mathed lap lenth of rebar
View answer (1)

Get interview-ready with Top JSW Bhushan Power & Steel Interview Questions

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
-

I applied via Company Website and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. All control wireing and power wireing all dcs plc work going on
  • Q2. Automation rooling mill division jamshedpur
Round 2 - One-on-one 

(2 Questions)

  • Q1. I am electrical engineer working on it and found in the same as par required production okay for me to get the same as the motor is overloaded due to the machine running ok but
  • Q2. Automation work
Round 3 - Case Study 

I am electrical engineer working on it jamshedpur jharkhand steel strips wheel limited jamshedpur jharkhand

Diploma Electrical Engineer Interview Questions asked at other Companies

Q1. What is the use of star delta connection in electrical ?
View answer (3)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Steel sector .
  • Q2. Rolling process

Production Engineer Interview Questions asked at other Companies

Q1. How to solve the problem in robot means how to detect fault?
View answer (9)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Project in BE ?
  • Ans. 

    Designed and implemented a smart irrigation system using IoT technology for efficient water usage.

    • Researched IoT technology and its applications in agriculture

    • Developed a system to monitor soil moisture levels and weather conditions

    • Implemented automated watering based on real-time data

    • Conducted field tests to validate system performance

  • Answered by AI
  • Q2. Transformer efficiency
  • Ans. 

    Transformer efficiency is the ratio of output power to input power, indicating how well the transformer converts electrical energy.

    • Efficiency is calculated as output power divided by input power, multiplied by 100%.

    • Efficiency is affected by factors such as core losses, copper losses, and load conditions.

    • For example, a transformer with an efficiency of 95% converts 95% of the input power into output power.

    • Efficiency can...

  • Answered by AI

Management Trainee Interview Questions asked at other Companies

Q1. What do you mean by balance sheet reconciliation could you explain briefly?
View answer (45)

Interview Questions & Answers

user image Anonymous

posted on 19 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. About behaviour
  • Q2. About plant technical
  • Q3. Normal question behaviour with colique.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be always cool mind during interview

Senior Engineer Interview Questions & Answers

user image mohit dutta

posted on 14 Aug 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Instrument ,PLC qus ,networking

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (62)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Ptm all parts Reapair
  • Q2. Bearing, Neumatic cyclender
  • Q3. Hydrolic cyclender
  • Q4. Wheel reapair, Gear box

Interview Preparation Tips

Interview preparation tips for other job seekers - Name- Susanta naik
At-Dulesara Dist- Jharsuguda
Mob-XXXXX
*****

Maintenance Fitter Interview Questions asked at other Companies

Q1. What is the potential risk that repair and maintenance work usually face?
View answer (4)

JSW Bhushan Power & Steel Interview FAQs

How many rounds are there in JSW Bhushan Power & Steel interview?
JSW Bhushan Power & Steel interview process usually has 1-2 rounds. The most common rounds in the JSW Bhushan Power & Steel interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for JSW Bhushan Power & Steel interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at JSW Bhushan Power & Steel. The most common topics and skills that interviewers at JSW Bhushan Power & Steel expect are Learning.
What are the top questions asked in JSW Bhushan Power & Steel interview?

Some of the top questions asked at the JSW Bhushan Power & Steel interview -

  1. How does it effluent water treatment, it likes to drinking wat...read more
  2. types of heat treatment, difference between normalizing and annealing, what is...read more
  3. What is impedance voltage of transform...read more
How long is the JSW Bhushan Power & Steel interview process?

The duration of JSW Bhushan Power & Steel interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

JSW Bhushan Power & Steel Interview Process

based on 74 interviews

Interview experience

4.1
  
Good
View more

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.0
 • 876 Interviews
UltraTech Cement Interview Questions
4.2
 • 602 Interviews
S&P Global Interview Questions
4.1
 • 283 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
Cummins Interview Questions
4.3
 • 234 Interviews
Jindal Stainless Interview Questions
4.2
 • 217 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all

JSW Bhushan Power & Steel Reviews and Ratings

based on 1.4k reviews

4.0/5

Rating in categories

3.9

Skill development

3.7

Work-life balance

3.5

Salary

3.7

Job security

3.7

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 1.4k Reviews and Ratings
Engineer
427 salaries
unlock blur

₹2.6 L/yr - ₹7.5 L/yr

Senior Engineer
393 salaries
unlock blur

₹3 L/yr - ₹9.3 L/yr

Assistant Manager
314 salaries
unlock blur

₹4.4 L/yr - ₹12 L/yr

Assistant Engineer
286 salaries
unlock blur

₹2.2 L/yr - ₹7 L/yr

Mechanical Engineer
133 salaries
unlock blur

₹2.5 L/yr - ₹7.6 L/yr

Explore more salaries
Compare JSW Bhushan Power & Steel with

Larsen & Toubro Limited

3.9
Compare

UltraTech Cement

4.2
Compare

Tata Steel

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview