Filter interviews by
I applied via Recruitment Consultant and was interviewed in Aug 2020. There was 1 interview round.
Accutval PM is a preventive maintenance program for mechanical equipment.
Accutval PM is a comprehensive maintenance program that includes regular inspections, cleaning, lubrication, and replacement of worn parts.
It is designed to prevent equipment breakdowns and extend the lifespan of mechanical equipment.
Accutval PM can be customized to meet the specific needs of different types of equipment and industries.
Examples of...
Breakdowns are handled by identifying the root cause, prioritizing repairs, and implementing preventive measures.
Conduct a thorough investigation to determine the cause of the breakdown
Prioritize repairs based on the impact on production and safety
Implement preventive measures to avoid future breakdowns
Maintain a record of breakdowns and repairs for analysis and improvement
Train and educate staff on proper maintenance
Time based maintenance is a maintenance strategy based on a predetermined schedule.
It involves performing maintenance tasks at set intervals, regardless of the equipment's condition.
It is often used for equipment that is not critical to operations.
Examples include changing air filters every three months or replacing belts every six months.
It can be less effective than condition-based maintenance, which takes into accou...
Predictive maintenance is a technique that uses data analysis to predict when equipment maintenance is needed.
It involves monitoring equipment performance and collecting data
Data is analyzed to identify patterns and predict when maintenance is needed
This helps to prevent equipment failure and reduce downtime
Examples include using sensors to monitor machine vibrations or oil analysis to detect wear in engines
Autonomous maintenance is a maintenance approach where operators take responsibility for routine maintenance tasks.
Operators are trained to perform routine maintenance tasks
Operators conduct inspections and minor repairs
Autonomous maintenance reduces downtime and improves equipment reliability
Operators become more familiar with equipment and can identify potential issues
Autonomous maintenance is a key component of Tota
Controlling inventory of spare parts involves monitoring stock levels, forecasting demand, and optimizing procurement processes.
Regularly monitor stock levels to ensure adequate inventory
Forecast demand based on historical data and upcoming projects
Optimize procurement processes to minimize lead times and costs
Implement a system for tracking inventory and ordering parts
Establish relationships with reliable suppliers
Con...
Total productive maintenance is a maintenance strategy that aims to maximize equipment effectiveness and minimize downtime.
TPM involves regular maintenance and inspection of equipment to prevent breakdowns
It emphasizes employee involvement and training to improve equipment performance
TPM also includes continuous improvement efforts to optimize equipment and processes
Examples of TPM techniques include autonomous mainten...
The equipment is in good health with regular maintenance and inspections.
Regular maintenance and inspections are conducted to ensure optimal performance.
Any issues or malfunctions are promptly addressed and repaired.
The equipment is regularly cleaned and lubricated to prevent wear and tear.
Performance data is regularly monitored and analyzed to identify any potential issues.
Spare parts and backup equipment are availabl
We maintain equipment history records through a computerized maintenance management system (CMMS).
We use a CMMS to track maintenance activities, repairs, and replacements.
Each equipment has a unique identification number and maintenance log.
We record the date, time, and details of each maintenance activity.
We also keep track of the cost of maintenance and replacement parts.
The CMMS generates reports on equipment perfor...
I appeared for an interview in Jan 2025.
Work experience in which field
I am looking for a competitive salary based on my experience and qualifications.
I am open to discussing salary based on the responsibilities and expectations of the role.
I have researched industry standards for Site Supervisor salaries in this region.
I am looking for a salary that reflects my skills and contributions to the team.
I am flexible and willing to negotiate based on the overall compensation package offered.
My nearest joining date possibility is within two weeks.
I am available to start within two weeks of receiving an offer.
I can provide specific dates once an offer is extended.
I am flexible and willing to adjust my start date if needed.
I appeared for an interview before Apr 2024, where I was asked the following questions.
Boiler tripping parameters are specific conditions that cause a boiler to shut down automatically for safety reasons.
Boiler pressure exceeding safe limits
Low water level in the boiler
Flame failure or loss of ignition
High furnace temperature
Excessive steam temperature or pressure
JSW Bhushan Power & Steel interview questions for popular designations
Main power work distribution involves managing the distribution of electrical power throughout a construction site.
Coordinate with electricians to ensure proper installation and maintenance of power distribution systems
Monitor power usage and troubleshoot any issues that arise
Ensure compliance with safety regulations and protocols
Plan for future power needs and upgrades
Examples: overseeing the installation of temporary...
Get interview-ready with Top JSW Bhushan Power & Steel Interview Questions
I applied via Company Website and was interviewed in Apr 2024. There were 3 interview rounds.
I am electrical engineer working on it jamshedpur jharkhand steel strips wheel limited jamshedpur jharkhand
Designed and implemented a smart irrigation system using IoT technology for efficient water usage.
Researched IoT technology and its applications in agriculture
Developed a system to monitor soil moisture levels and weather conditions
Implemented automated watering based on real-time data
Conducted field tests to validate system performance
Transformer efficiency is the ratio of output power to input power, indicating how well the transformer converts electrical energy.
Efficiency is calculated as output power divided by input power, multiplied by 100%.
Efficiency is affected by factors such as core losses, copper losses, and load conditions.
For example, a transformer with an efficiency of 95% converts 95% of the input power into output power.
Efficiency can...
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
Top trending discussions
The duration of JSW Bhushan Power & Steel interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 74 interviews
Interview experience
based on 1.4k reviews
Rating in categories
Engineer
427
salaries
| ₹2.6 L/yr - ₹7.5 L/yr |
Senior Engineer
393
salaries
| ₹3 L/yr - ₹9.3 L/yr |
Assistant Manager
319
salaries
| ₹4.3 L/yr - ₹12 L/yr |
Assistant Engineer
286
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Mechanical Engineer
133
salaries
| ₹2.5 L/yr - ₹7.6 L/yr |
Larsen & Toubro Limited
UltraTech Cement
Tata Steel
Shapoorji Pallonji Group