posted on 14 Mar 2022
I applied via Approached by Company and was interviewed in Feb 2022. There were 2 interview rounds.
The daily target time in fineblanking varies depending on the specific production line and product requirements.
The daily target time in fineblanking is determined based on factors such as production capacity, machine efficiency, and customer demand.
It is important to optimize the production process to meet or exceed the daily target time.
The target time can be calculated by dividing the available production hours by t...
posted on 25 Oct 2021
I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.
I will immediately investigate the reason for the stoppage and take necessary actions to resume production.
Check the machinery and equipment for any malfunctions or breakdowns
Identify the root cause of the stoppage
Coordinate with maintenance team to fix the issue
Ensure safety protocols are followed during the restart process
Communicate the status of the line to the management and other relevant departments
When there is a high rejection rate in my shift, I take immediate action to identify the root cause and implement corrective measures.
Analyze rejected products to determine the common issues
Investigate the production process to identify any equipment or material issues
Collaborate with the quality control team to implement necessary changes
Train and educate the production line staff to minimize errors
Monitor the product...
posted on 6 Nov 2024
I applied via Job Portal and was interviewed in Oct 2024. There were 4 interview rounds.
TQM stands for Total Quality Management. Production planning involves creating a detailed plan of how to produce goods efficiently.
TQM focuses on improving quality at every level of the production process
It involves continuous improvement, employee involvement, and customer satisfaction
Production planning includes setting production goals, scheduling tasks, and allocating resources
It aims to optimize production process
BE mechanical engineering
Water pump and oil pump
posted on 10 Aug 2023
I applied via Campus Placement
TPM stands for Total Productive Maintenance, a method for improving production processes. SAP is an enterprise resource planning software used for managing business operations.
TPM focuses on maximizing the effectiveness of equipment and minimizing downtime.
SAP is used for various business functions such as finance, HR, and production planning.
TPM and SAP can be integrated to improve overall production efficiency.
Exampl...
I applied via Referral and was interviewed before Dec 2021. There were 3 interview rounds.
Mechanical related questions,
I applied via Walk-in
I have handled 5 types of machines in my previous company.
I have experience in operating and maintaining CNC machines.
I have also worked with hydraulic and pneumatic machines.
I am familiar with robotic machines and their programming.
I have experience in troubleshooting and repairing machines.
I have worked with conveyor systems and packaging machines.
I was interviewed in Dec 2023.
Production Engineer
198
salaries
| ₹1.1 L/yr - ₹5.1 L/yr |
Quality Engineer
103
salaries
| ₹1.4 L/yr - ₹4.5 L/yr |
Production Supervisor
101
salaries
| ₹2.1 L/yr - ₹5 L/yr |
Diploma Mechanical Engineer
63
salaries
| ₹1.3 L/yr - ₹3.8 L/yr |
Junior Engineer
58
salaries
| ₹1.4 L/yr - ₹3.6 L/yr |
Bharat Forge
Samvardhana Motherson Group
Sundaram Clayton
Rane (Madras)