Upload Button Icon Add office photos

L.G.Balakrishnan & Bros

Compare button icon Compare button icon Compare

Filter interviews by

L.G.Balakrishnan & Bros Production Line Incharge Interview Questions and Answers

Updated 14 Mar 2022

L.G.Balakrishnan & Bros Production Line Incharge Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is daliy target time in fineblanking?
  • Ans. 

    The daily target time in fineblanking varies depending on the specific production line and product requirements.

    • The daily target time in fineblanking is determined based on factors such as production capacity, machine efficiency, and customer demand.

    • It is important to optimize the production process to meet or exceed the daily target time.

    • The target time can be calculated by dividing the available production hours by t...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L.G.Balakrishnan & Bros Production Line Incharge interview:
  • Project Management
Interview preparation tips for other job seekers - Lg balagrishan in my experience skills and treeing priod

Interview questions from similar companies

I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What you do when line is stopped due to some reason ?
  • Ans. 

    I will immediately investigate the reason for the stoppage and take necessary actions to resume production.

    • Check the machinery and equipment for any malfunctions or breakdowns

    • Identify the root cause of the stoppage

    • Coordinate with maintenance team to fix the issue

    • Ensure safety protocols are followed during the restart process

    • Communicate the status of the line to the management and other relevant departments

  • Answered by AI
  • Q2. I said first of all ,I see why line is what is problem and trying to solve it.
  • Q3. What happen when so much rejection found in your shift?
  • Ans. 

    When there is a high rejection rate in my shift, I take immediate action to identify the root cause and implement corrective measures.

    • Analyze rejected products to determine the common issues

    • Investigate the production process to identify any equipment or material issues

    • Collaborate with the quality control team to implement necessary changes

    • Train and educate the production line staff to minimize errors

    • Monitor the product...

  • Answered by AI
  • Q4. Nothing wrong ,try to rework and maintain quality as much as and see why rejection found.

Interview Preparation Tips

Interview preparation tips for other job seekers - 1-Just stay calm
2-when he says any questions=>then remember first and after remembering correctly just give them, or if you don't know about question and answer don't speak and dont try to giving them answer
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Oct 2024. There were 4 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Veriner caliper
  • Q2. TQM full form and production planning
  • Ans. 

    TQM stands for Total Quality Management. Production planning involves creating a detailed plan of how to produce goods efficiently.

    • TQM focuses on improving quality at every level of the production process

    • It involves continuous improvement, employee involvement, and customer satisfaction

    • Production planning includes setting production goals, scheduling tasks, and allocating resources

    • It aims to optimize production process

  • Answered by AI
Round 2 - Case Study 

BE mechanical engineering

Round 3 - Aptitude Test 

Water pump and oil pump

Round 4 - HR 

(2 Questions)

  • Q1. Tell me u self
  • Q2. Antha year passed
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is called bearing?
  • Ans. 

    Bearing is a machine element that allows one part to bear another part's weight and facilitate relative motion between the two parts.

    • Bearing is used to support rotating shafts in machinery.

    • It reduces friction between moving parts.

    • Common types include ball bearings, roller bearings, and plain bearings.

    • Examples: wheel bearings in cars, bearings in electric motors.

  • Answered by AI
  • Q2. What are the strongest bearings?
  • Ans. 

    The strongest bearings are typically made of materials like steel, ceramic, or titanium for high durability and load capacity.

    • Steel bearings are commonly used for their strength and durability.

    • Ceramic bearings are known for their high resistance to corrosion and wear.

    • Titanium bearings are lightweight yet strong, making them ideal for certain applications.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Schaeffler India Shift Incharge interview:
  • Bearings
Interview preparation tips for other job seekers - While you may know to submit a professional résumé, write a thoughtful cover letter and practice before an interview, sometimes you still don't get the job. "Every candidate is punctual, responsible and gets on well with people. To avoid blending in with the crowd, highlight unique elements of your personal brand.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

I really my best in hundai mobis.my all good work in company

Round 3 - Technical 

(2 Questions)

  • Q1. PCB full form tell ?
  • Ans. 

    PCB stands for Printed Circuit Board.

    • PCB is a board made of non-conductive material on which electronic components are mounted.

    • It provides mechanical support and electrical connections between components.

    • PCBs are commonly used in electronic devices like computers, smartphones, and televisions.

    • They are designed using computer-aided design (CAD) software and manufactured through various processes like etching and solderi

  • Answered by AI
  • Q2. Parallel circuit board

Interview Preparation Tips

Topics to prepare for Hyundai Mobis Production Incharge interview:
  • Industrial Safety
Interview preparation tips for other job seekers - God is great

I applied via Campus Placement and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. How many axis in cnc machine?
  • Ans. 

    CNC machines can have 3, 4, or 5 axes depending on the type and complexity of the machine.

    • CNC machines use axes to control the movement of the cutting tool.

    • 3-axis machines can move the tool along the X, Y, and Z axes.

    • 4-axis machines can also rotate the tool around the X-axis.

    • 5-axis machines can tilt the tool to reach difficult angles.

    • The number of axes determines the complexity and precision of the machine.

  • Answered by AI
  • Q2. How vmc different from cnc ?
  • Ans. 

    Vmc is a type of cnc machine used for milling operations.

    • Vmc stands for Vertical Machining Center while CNC stands for Computer Numerical Control.

    • Vmc is a type of CNC machine used for milling operations while CNC can be used for various operations like milling, drilling, turning, etc.

    • Vmc has a vertical spindle orientation while CNC can have both vertical and horizontal spindle orientations.

    • Vmc is used for high precisio...

  • Answered by AI
  • Q3. List out quality control methods?
  • Ans. 

    Quality control methods ensure products meet standards. Examples include statistical process control and Six Sigma.

    • Statistical process control

    • Six Sigma

    • Total Quality Management

    • Failure mode and effects analysis

    • Control charts

    • Inspection

    • Testing

    • Auditing

    • ISO certification

  • Answered by AI
  • Q4. Different between quality control and quality assurance?
  • Ans. 

    Quality control is the process of checking the product to ensure it meets the desired quality standards. Quality assurance is the process of ensuring that the product is made to meet the desired quality standards.

    • Quality control is reactive while quality assurance is proactive

    • Quality control focuses on identifying defects while quality assurance focuses on preventing defects

    • Quality control is a product-oriented process...

  • Answered by AI
  • Q5. What is the purpose of control chart?
  • Ans. 

    Control chart is a statistical tool used to monitor and control a process over time.

    • It helps to identify if a process is stable or not

    • It helps to detect any changes or abnormalities in the process

    • It helps to determine if a process is meeting its target or not

    • It helps to improve the process by identifying areas of improvement

    • Examples: X-bar chart, R chart, S chart, etc.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for TVS Sundram Fasteners Line Inspector interview:
  • Quality Assurance
  • CNC Machines
Interview preparation tips for other job seekers - If you know answer or not know speak confindently

I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What you do when line is stopped due to some reason ?
  • Ans. 

    I will immediately investigate the reason for the stoppage and take necessary actions to resume production.

    • Check the machinery and equipment for any malfunctions or breakdowns

    • Identify the root cause of the stoppage

    • Coordinate with maintenance team to fix the issue

    • Ensure safety protocols are followed during the restart process

    • Communicate the status of the line to the management and other relevant departments

  • Answered by AI
  • Q2. I said first of all ,I see why line is what is problem and trying to solve it.
  • Q3. What happen when so much rejection found in your shift?
  • Ans. 

    When there is a high rejection rate in my shift, I take immediate action to identify the root cause and implement corrective measures.

    • Analyze rejected products to determine the common issues

    • Investigate the production process to identify any equipment or material issues

    • Collaborate with the quality control team to implement necessary changes

    • Train and educate the production line staff to minimize errors

    • Monitor the product...

  • Answered by AI
  • Q4. Nothing wrong ,try to rework and maintain quality as much as and see why rejection found.

Interview Preparation Tips

Interview preparation tips for other job seekers - 1-Just stay calm
2-when he says any questions=>then remember first and after remembering correctly just give them, or if you don't know about question and answer don't speak and dont try to giving them answer

L.G.Balakrishnan & Bros Interview FAQs

How many rounds are there in L.G.Balakrishnan & Bros Production Line Incharge interview?
L.G.Balakrishnan & Bros interview process usually has 2 rounds. The most common rounds in the L.G.Balakrishnan & Bros interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

JBM Group Interview Questions
4.0
 • 264 Interviews
Exide Industries Interview Questions
3.5
 • 167 Interviews
UNO Minda Interview Questions
4.0
 • 166 Interviews
Subros Interview Questions
3.9
 • 165 Interviews
Ceat Tyres Interview Questions
4.0
 • 160 Interviews
Apollo Tyres Interview Questions
4.0
 • 129 Interviews
Spark Minda Interview Questions
3.9
 • 120 Interviews
Hitachi Astemo Interview Questions
4.1
 • 103 Interviews
View all

L.G.Balakrishnan & Bros Production Line Incharge Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

4.0

Salary

5.0

Job security

5.0

Company culture

4.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Assistant Engineer
410 salaries
unlock blur

₹1.6 L/yr - ₹4.5 L/yr

Engineer
285 salaries
unlock blur

₹1.9 L/yr - ₹5 L/yr

Quality Engineer
221 salaries
unlock blur

₹1.2 L/yr - ₹4.8 L/yr

Production Engineer
182 salaries
unlock blur

₹1.2 L/yr - ₹5 L/yr

Senior Engineer
142 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Explore more salaries
Compare L.G.Balakrishnan & Bros with

Rane Holdings

4.0
Compare

Sundaram Clayton

4.1
Compare

Samvardhana Motherson Group

3.7
Compare

Bharat Forge

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview