Upload Button Icon Add office photos

Filter interviews by

Bharat Construction Site Engineer Interview Questions and Answers

Updated 22 Jun 2022

Bharat Construction Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 22 Jun 2022

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Quality control management
  • Q2. Workmansip hard and timing your project
  • Q3. Project work time finish

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical work and good working ,full time work onyour project and check all work

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is full form of SBC
  • Q2. Density of concrete
Round 2 - Technical 

(1 Question)

  • Q1. Diameter of TBM
Round 3 - HR 

(1 Question)

  • Q1. Tell me something about yourself
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Columns staircase foundation
  • Q2. Beam one way slab ,two way slav
  • Ans. 

    One way slab is supported on two opposite sides, while two way slab is supported on all four sides.

    • One way slab is designed to carry loads predominantly in one direction.

    • Two way slab is designed to carry loads in both directions.

    • One way slab is more economical for smaller spans, while two way slab is more suitable for larger spans.

    • Examples: One way slab - balcony, corridor. Two way slab - office building, parking garag

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Site related experience bracket wall
  • Q2. Survey auto level total station
Round 3 - One-on-one 

(2 Questions)

  • Q1. Bbs, drawing reading
  • Q2. Stairs drawing reading
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via campus placement at Visvesvaraya National Institute of Technology (VNIT), Nagpur and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Shear force and bmd
  • Q2. Types of beam ,propped cantiliver beam
  • Ans. 

    A propped cantilever beam is a type of beam that is supported at one end and has a support (prop) at some point along its length.

    • Propped cantilever beams have a fixed support at one end and a prop at some point along the beam's length.

    • The prop helps to reduce the bending moment and deflection at the free end of the beam.

    • These beams are commonly used in construction to support overhanging structures or balconies.

    • Example...

  • Answered by AI
  • Q3. Which beam will have highest thickness
  • Ans. 

    The beam with the highest thickness will depend on the specific design and requirements of the structure.

    • The beam with the highest thickness will typically be a main load-bearing beam in the structure.

    • Factors such as the span of the beam, the load it needs to support, and the material used will determine the required thickness.

    • For example, a bridge beam supporting heavy traffic will likely have a higher thickness than

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Site Engineer interview:
  • Concrete
  • RCC
Interview preparation tips for other job seekers - basic core questions
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(6 Questions)

  • Q1. Why use Steel in Construction works.
  • Ans. 

    Steel is used in construction works due to its strength, durability, versatility, and cost-effectiveness.

    • Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildings and bridges.

    • Steel is durable and resistant to corrosion, ensuring the longevity of structures.

    • Steel can be easily fabricated into different shapes and sizes, allowing for versatile design options.

    • Steel is cost-effec...

  • Answered by AI
  • Q2. Why Provided Concrete Cover in all Structures Members.
  • Ans. 

    Concrete cover is provided in all structural members to protect the reinforcement bars from corrosion and fire damage.

    • Concrete cover protects the reinforcement bars from corrosion caused by exposure to moisture and chemicals in the environment.

    • It also provides protection against fire damage by acting as a barrier between the reinforcement and the fire.

    • Proper concrete cover helps in maintaining the durability and streng...

  • Answered by AI
  • Q3. How to do Calculate Staircase Steel.
  • Ans. 

    Calculate the amount of steel required for a staircase based on design and dimensions.

    • Calculate the total length of all the steel bars needed for the staircase

    • Determine the diameter and spacing of the steel bars based on design requirements

    • Consider the number of steps and the dimensions of the staircase in the calculation

    • Account for any additional reinforcement needed for structural integrity

    • Consult structural drawings

  • Answered by AI
  • Q4. How do I Find Concrete Workability.
  • Ans. 

    Concrete workability can be determined by conducting a slump test.

    • Conduct a slump test to measure the consistency of the concrete mix.

    • Adjust the water content or use admixtures to achieve the desired workability.

    • Consider factors such as temperature, humidity, and type of aggregates in determining workability.

    • Consult with concrete mix design experts for guidance on achieving the desired workability.

    • Use tools like flow t...

  • Answered by AI
  • Q5. What is Slum test for Concrete.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete - higher slump means more workable concrete.

    • The test helps ensure the concrete is of the right consistency for proper placement and compaction.

    • Slump tes...

  • Answered by AI
  • Q6. What is Concrete Mix Design.
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Involves selecting the right combination of materials like cement, aggregates, water, and admixtures

    • Proportions are determined based on desired strength, workability, durability, and other properties

    • Testing and adjusting the mix design to meet project requirements

    • Example: A ...

  • Answered by AI

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is CBR value
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Concrete workebility test
  • Ans. 

    Slamp test , concrete me water ki matra kitni honi chiye esse pta krte hai or ye concrete ki strength pr kafi effective hota hai.

  • Answered Anonymously
  • Q2. Concrete strength
  • Q3. Suttring work .safety working at site
  • Q4. Gas pipeline work
  • Ans. 

    Gas pipeline work involves the installation, maintenance, and repair of pipelines for the transportation of natural gas.

    • Gas pipeline work requires knowledge of pipeline design, construction, and safety regulations.

    • Engineers must ensure proper installation and maintenance to prevent leaks and ensure efficient gas transportation.

    • Examples of gas pipeline work include inspecting pipelines for corrosion, repairing leaks, an...

  • Answered by AI
  • Q5. Auto level work at site

Interview Preparation Tips

Interview preparation tips for other job seekers - Honestly work done
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Structural site questions
  • Q2. Fhinishing questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer for villa stectur work from Shalimar one world
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Practical work related question, Civil engineering related question
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion

Bharat Construction Interview FAQs

How many rounds are there in Bharat Construction Site Engineer interview?
Bharat Construction interview process usually has 2 rounds. The most common rounds in the Bharat Construction interview process are Resume Shortlist and Technical.
What are the top questions asked in Bharat Construction Site Engineer interview?

Some of the top questions asked at the Bharat Construction Site Engineer interview -

  1. Workmansip hard and timing your proj...read more
  2. Quality control managem...read more
  3. Project work time fin...read more

Tell us how to improve this page.

Bharat Construction Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
21 salaries
unlock blur

₹1.4 L/yr - ₹4.8 L/yr

Assistant Engineer - Civil
7 salaries
unlock blur

₹1.8 L/yr - ₹6.2 L/yr

Project Manager
6 salaries
unlock blur

₹8.2 L/yr - ₹18 L/yr

Land Surveyor
5 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Civil Engineer
5 salaries
unlock blur

₹2.7 L/yr - ₹3.7 L/yr

Explore more salaries
Compare Bharat Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview