Bechtel
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Major clauses in a purchase order include payment terms, delivery terms, warranties, and dispute resolution.
Payment terms specify when and how payment should be made.
Delivery terms outline the expected delivery date, shipping method, and any special requirements.
Warranties detail the guarantees provided by the seller regarding the quality and performance of the purchased goods or services.
Dispute resolution clauses est...
Indemnity clause is used to protect one party from financial loss or legal liability caused by the other party.
It transfers the risk of loss from one party to another
It ensures that one party is not held responsible for the actions of the other party
It is commonly used in contracts, especially in high-risk industries such as construction and healthcare
Example: A construction company may include an indemnity clause in a...
A compressor is priced based on its features, quality, and market demand.
The features of the compressor, such as its horsepower, size, and efficiency, can affect its price.
The quality of the compressor, including its durability and reliability, can also impact its price.
Market demand for the compressor can influence its price, with higher demand leading to higher prices.
Other factors that may affect pricing include com...
posted on 7 Feb 2025
Control circuit drawing shows the control components and their interconnections, while power circuit drawing shows the power components and their connections.
Control circuit drawing includes relays, switches, and control devices.
Power circuit drawing includes transformers, circuit breakers, and motors.
Control circuit drawing focuses on the logic and sequencing of operations.
Power circuit drawing focuses on the distribu...
I applied via Campus Placement and was interviewed in Sep 2024. There were 3 interview rounds.
Core q were there, which is related to process and industrial instrumentation
I am passionate about utilizing my skills in estimation and engineering to contribute to the growth and success of the company.
I have a strong background in engineering and estimation, making me well-suited for the role.
I am excited about the opportunity to work on challenging projects and contribute to the company's success.
I believe that my skills and experience align well with the requirements of the position.
I am e...
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Bechtel interview questions for popular designations
Various terms and conditions used in procurement include payment terms, delivery terms, warranty terms, and termination clauses.
Payment terms: specify when and how payment will be made for goods or services
Delivery terms: outline how and when the goods will be delivered
Warranty terms: detail the warranty provided for the goods or services
Termination clauses: specify the conditions under which the contract can be termin
Get interview-ready with Top Bechtel Interview Questions
I applied via Campus Placement and was interviewed in Aug 2024. There were 2 interview rounds.
Hoop stresses in pipes are circumferential stresses that occur due to internal pressure, and their ratios are important for determining the safety of the pipe.
Hoop stress is calculated using the formula: P*D/2t, where P is the internal pressure, D is the diameter of the pipe, and t is the thickness of the pipe wall.
The ratio of hoop stress to longitudinal stress is important in determining the safety factor of the pipe...
Various materials used for pipe making include steel, copper, PVC, and HDPE.
Steel: commonly used for high-pressure applications
Copper: used for water supply lines
PVC: lightweight and corrosion-resistant, often used for drainage systems
HDPE: flexible and durable, suitable for underground piping
I am a plant design engineer with a passion for creating efficient and sustainable solutions for industrial processes.
I have a degree in mechanical engineering with a focus on plant design
I have experience working on projects that involve designing and optimizing plant layouts
I am proficient in CAD software and have a strong understanding of process engineering principles
I have a track record of successfully implementi...
My family background is diverse and supportive, with members in various professions and locations.
My family consists of professionals in different fields such as engineering, medicine, and education.
We have a strong support system and value education and hard work.
Some of my family members live in different parts of the country, providing a wide range of perspectives and experiences.
I applied via Referral and was interviewed in Aug 2024. There were 2 interview rounds.
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
I would manage the design of a power plant by coordinating with engineers, ensuring compliance with regulations, and monitoring progress.
Coordinate with engineering team to develop detailed design plans
Ensure compliance with safety regulations and environmental standards
Monitor progress and address any design issues or changes
Collaborate with stakeholders to incorporate feedback and make necessary adjustments
WBS stands for Work Breakdown Structure, a hierarchical decomposition of the total scope of work to be carried out by the project team.
WBS breaks down the project deliverables into smaller, more manageable components.
It helps in organizing and defining the total scope of the project.
Each level of the WBS represents a different level of detail.
It is a visual representation of the project scope.
Example: In a construction...
My current salary is competitive based on industry standards and my level of experience.
My current salary is in line with industry benchmarks for Project Control Engineers.
I have received regular salary increases based on performance evaluations.
I am open to discussing salary expectations for this role during the interview process.
Top trending discussions
The duration of Bechtel interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 72 interviews
Interview experience
based on 716 reviews
Rating in categories
Senior Engineer
129
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Engineer
78
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
64
salaries
| ₹0 L/yr - ₹0 L/yr |
Purchasing Specialist
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Process Engineer
53
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Group
Hindustan Construction Company
Shapoorji Pallonji Group