I applied via campus placement at Delhi College of Engineering (DCE), Delhi and was interviewed in Aug 2024. There were 2 interview rounds.
Hoop stresses in pipes are circumferential stresses that occur due to internal pressure, and their ratios are important for determining the safety of the pipe.
Hoop stress is calculated using the formula: P*D/2t, where P is the internal pressure, D is the diameter of the pipe, and t is the thickness of the pipe wall.
The ratio of hoop stress to longitudinal stress is important in determining the safety factor of the pipe...
Various materials used for pipe making include steel, copper, PVC, and HDPE.
Steel: commonly used for high-pressure applications
Copper: used for water supply lines
PVC: lightweight and corrosion-resistant, often used for drainage systems
HDPE: flexible and durable, suitable for underground piping
I am a plant design engineer with a passion for creating efficient and sustainable solutions for industrial processes.
I have a degree in mechanical engineering with a focus on plant design
I have experience working on projects that involve designing and optimizing plant layouts
I am proficient in CAD software and have a strong understanding of process engineering principles
I have a track record of successfully implementi...
My family background is diverse and supportive, with members in various professions and locations.
My family consists of professionals in different fields such as engineering, medicine, and education.
We have a strong support system and value education and hard work.
Some of my family members live in different parts of the country, providing a wide range of perspectives and experiences.
Top trending discussions
posted on 23 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
S-Curve in Primavera is a graphical representation of project progress over time.
S-Curve shows the planned and actual progress of a project.
It helps in visualizing the project's performance and identifying any deviations from the plan.
The curve is shaped like an 'S' due to the gradual increase in progress at the beginning and end, with a steeper slope in the middle.
The x-axis represents time, and the y-axis represents ...
I applied via Referral and was interviewed in Nov 2022. There were 3 interview rounds.
Construction planning at site involves creating a detailed schedule of activities and resources required for the project.
Identify project objectives and constraints
Develop a work breakdown structure
Estimate activity durations and dependencies
Allocate resources and create a schedule
Monitor and control progress
Adjust plans as necessary
I was interviewed in Oct 2022.
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
posted on 15 Jun 2022
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Aug 2023. There were 2 interview rounds.
Prepare Aptitude Book, It is good.
Experienced Planning Engineer with a background in civil engineering and a strong track record of successfully managing projects.
Bachelor's degree in Civil Engineering
5+ years of experience in planning and managing construction projects
Proficient in project management software such as Primavera P6
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
Managed the planning and schedulin...
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path determines the shortest possible duration for a project.
It helps in identifying the tasks that are critical and cannot be delayed without delaying the entire project.
Activities on the critical path have zero float or slack.
Any delay in the critical path activities will dela...
based on 1 interview
Interview experience
Senior Engineer
130
salaries
| ₹16 L/yr - ₹49 L/yr |
Process Engineer
78
salaries
| ₹8 L/yr - ₹19.1 L/yr |
Engineer
63
salaries
| ₹6 L/yr - ₹24 L/yr |
Purchasing Specialist
62
salaries
| ₹6.5 L/yr - ₹24 L/yr |
Senior Process Engineer
53
salaries
| ₹21 L/yr - ₹40.2 L/yr |
Larsen & Toubro Limited
Tata Group
Hindustan Construction Company
Shapoorji Pallonji Group