The necessary checking procedure of a glass lined reactor involves visual inspection, pressure testing, and checking for any signs of corrosion or damage.
Perform a visual inspection of the glass lining to check for any cracks, chips, or signs of wear.
Conduct a pressure test to ensure the reactor can withstand the required operating pressure.
Check for any signs of corrosion on the glass lining, especially in areas expos...
There are two types of vacuum systems: liquid ring and dry vacuum systems.
Liquid ring vacuum systems use a liquid as a sealant to create a vacuum.
Dry vacuum systems use oil-free pumps to create a vacuum.
Examples of liquid ring vacuum systems include steam jet ejectors and water ring vacuum pumps.
Examples of dry vacuum systems include scroll pumps and turbo molecular pumps.
Flush bottom valves are used to drain liquids from tanks. Troubleshooting involves identifying and fixing issues with the valve.
Check for leaks or blockages in the valve
Inspect the valve for damage or wear and tear
Ensure that the valve is properly installed and tightened
Verify that the valve is compatible with the liquid being drained
Consult manufacturer's instructions or seek expert advice if necessary
Steam traps are devices used to discharge condensate and non-condensable gases from steam systems.
There are three main types of steam traps: mechanical, thermostatic, and thermodynamic.
Mechanical steam traps use a float to open and close a valve.
Thermostatic steam traps use a temperature-sensitive element to open and close a valve.
Thermodynamic steam traps use the difference in pressure between steam and condensate to ...
U-loop is required in steam lines to prevent thermal expansion and contraction.
U-loop is a type of expansion joint used in steam lines.
It is used to absorb the thermal expansion and contraction of the pipe.
It prevents the pipe from buckling or breaking due to thermal stress.
U-loop is typically installed in vertical steam lines.
It is also used in horizontal steam lines where there is limited space for expansion.
U-loop i...
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
BDR Pharmaceuticals International interview questions for popular designations
The duration of BDR Pharmaceuticals International interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 34 interviews
Interview experience
based on 412 reviews
Rating in categories
Officer
150
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Officer
135
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
115
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
78
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
66
salaries
| ₹0 L/yr - ₹0 L/yr |
Sun Pharmaceutical Industries
Cipla
Dr. Reddy's
Biocon Limited