Filter interviews by
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
The time for curing of concrete depends on various factors such as type of cement, temperature, and desired strength.
The curing time for concrete is typically 7 to 28 days.
The type of cement used affects the curing time. For example, rapid-hardening cement may require shorter curing time.
Higher temperatures can accelerate the curing process, while lower temperatures can slow it down.
The desired strength of the concrete...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Dec 2021. There was 1 interview round.
Yes
I have experience working on various civil engineering projects in my previous company.
I have successfully executed and managed multiple construction projects from start to finish.
I have handled client interactions and ensured their satisfaction throughout the project.
I am proficient in managing all aspects of civil work, including planning, designing, and supervising construction activities.
Assistant Manager
100
salaries
| ₹7 L/yr - ₹15 L/yr |
Deputy Manager
48
salaries
| ₹12 L/yr - ₹20 L/yr |
Junior Officer
39
salaries
| ₹2 L/yr - ₹7.2 L/yr |
Junior Associate
31
salaries
| ₹2.2 L/yr - ₹3.4 L/yr |
Assistant Manager- HR
22
salaries
| ₹8 L/yr - ₹14.4 L/yr |
Container Corporation of India
Shipping Corporation of India
Oil India
Indian Oil Corporation