I applied via Naukri.com and was interviewed in Feb 2022. There were 3 interview rounds.
posted on 1 Apr 2024
I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.
They are giving test, in which all people can cheat in exam.
posted on 2 Jul 2022
I applied via Walk-in and was interviewed before Jul 2021. There were 2 interview rounds.
Arithmetic and logical reasoning
posted on 8 Jan 2015
Discussion on soil mechanics starting from modulus of elasticity to liquifaction
Modulus of elasticity is a measure of soil stiffness
Soil strength is important in determining its ability to withstand loads
Liquifaction occurs when soil loses strength and behaves like a liquid
Factors affecting soil strength include soil type, moisture content, and stress history
Liquifaction can lead to soil failure and damage to structure
posted on 15 Jun 2024
Shear key is a device used to transfer shear forces between two components in a structure.
Shear keys are typically used in construction joints to prevent sliding between adjacent components.
They are designed to resist horizontal forces and ensure stability.
Shear keys can be found in structures such as bridges, buildings, and dams.
Examples include shear keys in bridge expansion joints to prevent movement between bridge
Columns are vertical structural members that support loads, while beams are horizontal members that transfer loads to columns or walls.
Columns are vertical and primarily support compressive loads.
Beams are horizontal and primarily support bending loads.
Columns are typically taller than they are wide, while beams are typically wider than they are tall.
Examples: In a building, columns support the weight of the floors abo...
posted on 29 Aug 2024
I applied via Naukri.com
Technical questions about the Revit and MEP
posted on 10 Jul 2024
I applied via Campus Placement and was interviewed before Jun 2022. There were 2 interview rounds.
Campus selection - reasoning tests
posted on 14 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
P&ID of Pump System shows the piping, equipment, instrumentation, and control interlocks of the system.
Include pump symbol with arrows indicating flow direction
Label all equipment such as pumps, valves, tanks, etc.
Show instrumentation like pressure gauges, flow meters, etc.
Indicate control interlocks and safety features
Use standard symbols and colors as per industry guidelines
NPSH available stands for Net Positive Suction Head available, which is a measure of the absolute pressure at the suction port of a pump.
NPSH available is the total suction head in feet absolute at the suction nozzle of the pump.
It is important for ensuring that the pump does not cavitate, which can cause damage to the pump and decrease efficiency.
NPSH available is calculated by subtracting the vapor pressure of the li...
NPSH is calculated by subtracting the vapor pressure of the liquid from the total head of the pump.
NPSH = H - (Pv / rho * g)
H is the total head of the pump
Pv is the vapor pressure of the liquid
rho is the density of the liquid
g is the acceleration due to gravity
Ensure all units are consistent (e.g. meters, Pascal, kg/m^3, m/s^2)
A two-phase system P&ID shows the process flow of a system with two distinct phases.
Identify the two phases involved in the system (e.g. liquid-gas, solid-liquid).
Use different symbols to represent each phase on the P&ID.
Show the flow direction and connections between components in the system.
Include labels and legends to explain the components and their functions.
Ensure clarity and consistency in the representation of
posted on 28 Sep 2023
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
based on 3 reviews
Rating in categories
Junior Engineer Civil
316
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
176
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
90
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
88
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
75
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company