I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
First angle projection is commonly used in Europe and Asia, while third angle projection is commonly used in North America.
First angle projection places the object in the first quadrant, with the front view above the top view and the right view to the left of the front view.
Third angle projection places the object in the third quadrant, with the front view below the top view and the right view to the right of the front...
Types of fits and tolerance refer to the different ways in which two parts can be assembled together based on the clearance between them.
Types of fits include clearance fit, interference fit, and transition fit
Clearance fit allows for a gap between the parts for easy assembly and disassembly
Interference fit requires the parts to be pressed or hammered together for a tight fit
Transition fit falls between clearance and i...
I applied via Walk-in and was interviewed in Jan 2021. There was 1 interview round.
Recrystallisation is the process of heating and cooling a metal to remove impurities and improve its strength and ductility.
Heating the metal to a specific temperature to dissolve impurities
Cooling the metal slowly to allow new, pure crystals to form
Improves the metal's strength, ductility, and other mechanical properties
Used in the production of high-quality metals for various industries
Examples include the recrystall
Top trending discussions
I applied via Company Website and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Aug 2018. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
posted on 18 Nov 2024
based on 1 interview
Interview experience
based on 30 reviews
Rating in categories
Quality Inspector
28
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Quality Engineer
14
salaries
| ₹1 L/yr - ₹3.2 L/yr |
Metrology Inspector
8
salaries
| ₹2 L/yr - ₹2.8 L/yr |
Design Engineer
7
salaries
| ₹2.1 L/yr - ₹2.8 L/yr |
Quality Line Inspector
7
salaries
| ₹1.5 L/yr - ₹2.4 L/yr |
JBM Group
Subros
Varroc Group
Endurance Technologies