Bituminous laying temperature is 130-150°C and rolling temperature is 80-100°C.
Bituminous laying requires higher temperature than rolling.
Temperature range ensures proper compaction and adhesion.
Temperature can vary based on the type of bitumen and aggregate used.
Proper temperature control is crucial for quality bituminous pavement.
Material suitability criteria for aggregate in construction projects.
Aggregate size should be 26.5 mm or less.
Water absorption should not exceed 2%.
Soundness test should show Naso4 not more than 12% and Mgso4 not more than 18%.
Angle of abrasion should be less than 35% with max FI & EI less than 35%.
Equivalent weight of sand should not be less than 50%.
Aggregate should not be alkaline reactive.
MDD & MCC should be as per
The design procedure for DLC mix includes using M15 grade concrete, minimum cement content of 150 kg/cum, and achieving a compressive strength of at least 10 MPA after 7 days of curing.
Use M15 grade concrete with aggregate and cement ratio of 12:1
Minimum cement content of 150 kg/cum, or 120 kg/cum if fly ash content is over 20%
Achieve a compressive strength of at least 10 MPA after 7 days of curing
DLC mix should be hom...
The question is about the suitability of aggregate size and water absorption for PQC with a total thickness of 300mm and tolerance of +/-6mm.
Aggregate size of 31.5mm is suitable for PQC with a total thickness of 300mm and tolerance of +/-6mm.
Water absorption to GSB DLC being the same for PQC is also suitable.
The suitability of the material is important for the successful completion of the project.
The design procedure for cement concrete includes minimum cement content, strength requirements, dowel bar and tie bar specifications, and surface preparation and curing techniques.
Minimum cement content of 360 kg/cum if fly ash is more than 20%, and 310 kg/cum otherwise
Flexural strength of cement concrete after 28-day curing should be 4.5 MPa, and compressive strength should be 40 MPa
Dowel bar size of 32mm dia and 300...
I applied via Company Website and was interviewed in Jul 2022. There was 1 interview round.
Drawing is an essential part of project completion in civil engineering.
Drawings are used to communicate design intent and construction details.
Different types of drawings include site plans, floor plans, elevations, sections, and details.
Drawings must be accurate and up-to-date to ensure project success.
Project completion involves not only finishing construction but also obtaining necessary approvals and permits.
Effec...
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
posted on 21 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
It was basic level coding question. you can answer if you strong in basic level of java
Assistant Manager
9
salaries
| ₹3.6 L/yr - ₹6.5 L/yr |
General Manager Project
7
salaries
| ₹13.6 L/yr - ₹26 L/yr |
Assistant Manager Safety
6
salaries
| ₹4.2 L/yr - ₹5.4 L/yr |
CRM Executive
5
salaries
| ₹2.5 L/yr - ₹3.4 L/yr |
Sales Executive
5
salaries
| ₹1 L/yr - ₹3 L/yr |
DLF
Prestige Group
Sobha
Brigade Group